Making travel greener 1

Train Characteristics

 Very high weight at each activation (30-120 Tons)   Slowing-down locations are repetitive Many activations per train Proprietary 2

Product Benefits

  When slowing down, energy is dissipated by heat.

“ catching income.

” some of this energy may bring huge Proprietary 3

Installation Sites

 Train Station entrances   Hundreds of stations in Moscow – station has 2 sites each railway line at each Train always slow at the same place Proprietary Granted 4

Energy produced - Assumptions BumperOn gave 10kWh (for 15 flaps, 3.8ton car, 1000 cars/hour) 10 train-wag, 15 trains per hour = 150 train-cars/hour Train-wag weight ~30 ton (7.5 ton/wheel ) Equivalent No. of cars = 150 × 30/3.8 = 1180 cars/hour If we take 100 flaps per location: 100/15 = 6.6 bumperOn P = 6.6 × 10kWh × 1180 / 1000 = 78.6 kWh Proprietary 5

How much money can it make?

Assumptions: 0.

094 $/kWh price 15 hours traffic 320days per year Yearly Production – 78.6

[kWh] *15 [hours/day] *320 [days/year] *0.094

[$/kWh] =35,200$ Per Installation site!!!

2 Sites per line – More than 70,000$ Proprietary 6

General Solution - 1

 Series of flaps – wheel (180) Pressed by the moving and bar (190) Proprietary 7

Ron Chen Making travel a little greener President - Inventor - Founder Tel: +972–4-6221373 Mobile:+972–52-5673388 E-mail: [email protected]