ACCS Replication
Download
Report
Transcript ACCS Replication
Background CP5A0109
NACMA (now NCI Agency) Contract
• NACMA (now NCI Agency) ACCS LOC-1 Contract
(CO/6568-ACCS) signed with ACSI in 1999
– Replication projects included as options to the Contract, General
provisions, terms/conditions, specifications, tasks to the
Contractor e.t.c. are applicable as described in the contract.
– FST (Factory System Test) was chosen as “start” of Replication
– Replication implementation is linked to the progress in the
validation activities (FST BU-1, STI-2, PSWA)
NATO UNCLASSIFIED
1
Framework for Replication
ACCS
Design
Validation
Sites
Software
Development
Replication
Sites
Software
Validation
ARS Tours C.M. La Pile (FRA)
CARS Larissa (GRC)
CARS Karup (DNK)
ARS Nieuw Milligen (NLD)
ARS Torrejon (ESP)
ARS Eskisehir (TUR)
ARS Veszprem (HUN)
ARS Krakow (POL)
ARS Stara Boleslav (CZE)
ARS Soerreisa (NOR)
ARS Monsanto (PRT)
Validated
Software
•
•
•
NACMA is the Procurement Agency for 10 sites
(MOU)
The 10 sites are awarded sole source to ACSI
Options to the NACMA contract.
NATO UNCLASSIFIED
2
Replication MOU
• Memorandum of Understanding (MOU) between DNK, GRC, NLD,
NOR, ESP, TUR and NCIA (formerly NACMA) in 1995.
• MOU updated to include CZE, HUN, POL, PRT and GBR in 2005.
• Host Nations requested NACMA/NCI Agency AirC2PO&S to act as
procurement agent on their behalf.
• Objective:
• establishes the planning and implementation arrangements between
NACMO and the HN with regard to the replication projects.
• Sets forth the terms and conditions under which the HN and NACMO will
cooperate in the implementation of the replication projects.
• For projects included as options to the NCI Agency LOC-1 contract with
ACSI.
NATO UNCLASSIFIED
3
ACCS LOC1 REPLICATION
Sites Under Contract
ARS
Sørreisa
CARS
ARS
ARS
N. Milligen
CARS
Karup
ARS
Krakow
ARS
S. Boleslav
ARS
Veszprem
ARS
Monsanto
ARS
C.M. La Pile
ARS
Torrejón
CARS
Larissa
NATO UNCLASSIFIED
ARS
Eskisehir
4
Replication Project Office
Replication Site Manager RSM)
•
•
Site Liaison
Consultant
Oversee the design, development, installation
and verification activities
coordinate with NCIA staff, ACSI and HN
NATEX
Contract
A
C
S
I
Replication
Project
Office
Programme
Management
Test
& Evaluation
Financial
Management
Project
Coordination
NCIA Air C2
Engineering
Contract
Support
Cost
Analysis
Configuration
Management
MOU
N
A
T
I
O
N
S
Logictics
Support
NATO UNCLASSIFIED
5
Contract Links with the
ACCS LOC1 Core Programme
Special Terms &
Conditions
STEP I
Design/Plans
1.
2.
3.
4.
5.
6.
7.
Installation
preparation
Comms and interfaces
study
Site surveys
Site design up to CDR
Management plans
CTEMP
Proposal for long lead
items
Core:
&
FST BU-1
STEP II
Implementation Preparation
1.
2.
3.
4.
Completion of Site design
(CDR)
Procurement of Long lead
Items
Hardware Installation
Activities
Production of Software
5. ADP, Servers, WP
selection following the
completion of STI-2
STEP II
Implementation
1.
2.
3.
4.
Completion of HW
Installation (SCI)
SW Installation
Testing of System
Provision of support
environment (spares,
support equipment,
documentation, training)
&
PSWA
NATO UNCLASSIFIED
6