MANAGEMENT FORCE GROUP RISK MANAGEMENT & EHSS CONSULTANCY

Download Report

Transcript MANAGEMENT FORCE GROUP RISK MANAGEMENT & EHSS CONSULTANCY

HELLENIC BUSINESS COUNCIL IN BULGARIA
MANAGEMENT FORCE GROUP
RISK MANAGEMENT & EHSS CONSULTANCY SERVICES
Dr. Georgios D. Panopoulos
Nadka Petrova
HELLENIC BUSINESS COUNCIL IN BULGARIA
WHO IS WHO
1999
Georgios D. Panopoulos, a safety consultant office becomes
MANAGEMENT FORCE
2000 IOSH Accreditation
2000/1 MFOR54 and GEEK2001, starts offering NEBOSH coerces
2001/4 MF Wins the majority of the Olympic Projects
2004 BSI Accreditation
2005 MF becomes a Sociéte Anonyme and establishes:
MANAGEMENT FORCE Srl (Romania)
MANAGEMENT FORCE Ltd (Cyprus)
2006 Projects in three continents
2007 Launches the P-EHSS-MS for construction Industry
2009 Launches SAFETY GALA, an established event
2010 MF establishes ERMC (Bulgaria)
2011 ERMC establishes ERMC SH.p.k. (Albania)
HELLENIC BUSINESS COUNCIL IN BULGARIA
GEOGRAPHICAL EXPANSION
Projects
Established offices
HELLENIC BUSINESS COUNCIL IN BULGARIA
OUR QUALITY
•
•
•
•
•
•
•
Highly trained personnel
Continuous Professional Development Scheme
Developments in EHSS Management – Know How
ISO 9001
Information Policy
Code of Ethics
Professional Indemnity Insurance Policy
HELLENIC BUSINESS COUNCIL IN BULGARIA
OUR PRODUCT/DELIVERABLE
•
•
•
•
•
•
•
Simple
Practicable
Adaptable
Integrated
Added value
Holistically approached
Servicing best the three criteria for doing safety
HELLENIC BUSINESS COUNCIL IN BULGARIA
OUR SERVICES
A. EHSS Management systems, training audits, inspections,
supervisions, studies etc
B. Process safety
C. Based on the three criteria for doing safety (moral, legal and
economical), offer:
• Project Life Cycle Safety
• Benchmarking for Re-engineering and Business Opt’
• Incident investigation
• Integrated management systems
• Contractors management
• Economics of Safety
HELLENIC BUSINESS COUNCIL IN BULGARIA
BUSINESS TOOLS &
METHODOLOGIES
Safe
Pass©
BRBO© customized
solutions
“+2/-2”© Safety Audit
Methodology System
MFOR54
Management
System©
Economics of
Safety
Contractors Safety
Management®
P-HSE-MMS® Tool
Multilingual Risk
Assessment Software®
HELLENIC BUSINESS COUNCIL IN BULGARIA
CLIENTS & PROJECTS
HELLENIC BUSINESS COUNCIL IN BULGARIA
ECONOMICS OF SAFETY
Y
SC =PC + AC + MfwoAC
SC =aS2 - bS + c
dSC/dS = 2aS – b
If dSC/dS = 0 then SC = min
Safety Cost (SC)
COST
SC1
SCmin
Prevention Cost (PC)
New SCmin
AC1
Returns Cost
(RC)
Accident Cost (AC)
Management
Failure wit No
Accident Cost
(MFwAC)
MfwnAC1
PC1
SP1/IR1
Number of Accidents
Safety Performance
X
9
HELLENIC BUSINESS COUNCIL IN BULGARIA
PROJECT LIFE CYCLE EHSS
Concept
Preliminary
design
Basic
design
THE CONCEPT
Detail
design
FEED
Construction
THE DESIGN
Testing &
commissioning
THE CONSTRUCTION
Hand
over
O&M
Decommis
sioning
MANAGEMENT OF INHERENT
OPERATIONAL & EMERGING RISKS
ΥΠΟΜΝΗΜΑ
ΠΡΟΣΤΑΣΙΑ ΔΑΣΙΚΗΣ ΕΚΤΑΣΗΣ ΣΥΜΦΩΝΑ ΜΕ
ΤΗ ΔΑΣΙΚΗ ΝΟΜΟΘΕΣΙΑ
ΖΩΝΕΣ ΔΙΑΤΗΡΗΣΗΣ ΥΦΙΣΤΑΜΕΝΗΣ ΒΛΑΣΤΗΣΗΣ
ΚΑΙ ΜΕΤΑΦΥΤΕΥΣΗΣ ΚΥΡΙΩΣ ΕΛΑΙΟΔΕΝΔΡΩΝ
ΠΡΟΣΤΑΣΙΑ ΑΜΜΟΘΙΝΩΝ ΚΑΙ ΒΛΑΣΤΗΣΗΣ ΤΟΥΣ
ΜΕ ΠΕΡΙΦΡΑΞΗ ΚΑΙ ΔΙΑΚΡΙΤΙΚΗ ΣΥΝΤΗΡΗΣΗ
ΔΙΑΤΗΡΗΣΗ - ΣΥΝΤΗΡΗΣΗ ΥΦΙΣΤΑΜΕΝΩΝ ΜΟΝΟΠΑΤΙΩΝ
ΠΡΟΣΤΑΣΙΑ ΑΜΜΟΘΙΝΩΝ ΚΑΙ ΑΡΑΙΗΣ ΒΛΑΣΤΗΣΗΣ
ΜΕ ΔΙΑΚΡΙΤΙΚΗ ΣΥΝΤΗΡΗΣΗ
ΠΡΟΣΤΑΣΙΑ ΑΡΜΥΡΙΚΙΩΝ ΜΕ ΔΙΑΚΡΙΤΙΚΗ ΣΥΝΤΗΡΗΣΗ
ΔΕΥΤΕΡΕΥΟΥΣΑ
ΕΙΣΟΔΟΣ
ΠΡΟΣΤΑΣΙΑ ΠΑΡΑΠΟΤΑΜΙΟΥ ΔΑΣΟΥΣ
TEXNHTOΣ ΥΓΡΟΤΟΠΟΣ ΜΕ ΣΤΟΧΟ ΚΑΙ ΤΗΝ ΕΠΕΞΕΡΓΑΣΙΑ ΟΜΒΡΙΩΝ.
ΔΥΝΑΤΟΤΗΤΑ ΤΡΟΦΟΔΟΤΗΣΗΣ ΕΣΩΤΕΡΙΚΗΣ
ΛΙΜΝΟΔΕΞΑΜΕΝΗΣ ΑΡΔΕΥΣΗΣ
ΞΥΛΙΝΕΣ ΡΑΜΠΕΣ - ΕΞΕΔΡΕΣ ΠΡΟΣΠΕΛΑΣΗΣ ΠΑΡΑΛΙΑΣ
ΠΡΟΣΤΑΤΕΥΤΙΚΕΣ ΑΜΜΟΘΙΝΩΝ ΚΑΙ ΒΛΑΣΤΗΣΗΣ
ΜΕΡΙΜΝΑ ΓΙΑ ΤΗΝ ΠΡΟΣΤΑΣΙΑ ΩΟΤΟΚΙΑΣ ΘΑΛΑΣΣΙΑΣ ΧΕΛΩΝΑΣ
ΞΕΝΟΔΟΧΕΙΟ 3
ΚΥΡΙΑ ΕΙΣΟΔΟΣ
ΠΡΟΣ Ε.Ο. ΠΥΛΟΥ - ΦΙΛΙΑΤΡΩΝ
ΞΕΝΟΔΟΧΕΙΟ 1
ΤΡΟ
ΚΕΝ /ΠΕΙΑΣ
ΘΑΛ
ΜΕΛΕΤΗ ΠΕΡΙΒΑΛΛΟΝΤΙΚΩΝ ΕΠΙΠΤΩΣΕΩΝ
ΞΕΝΟΔΟΧΕΙΟ 2
ΕΡΓΟ
ΠΕΡΙΟΧΗ ΟΛΟΚΛΗΡΩΜΕΝΗΣ ΤΟΥΡΙΣΤΙΚΗΣ ΑΝΑΠΤΥΞΗΣ
ΠΟΤΑ ΡΩΜΑΝΟΥ
ΑΡ. ΧΑΡΤΗ
ΜΠΕ - 8
ΚΛΙΜΑΚΑ
1:5.000
ΞΕΝΟΔΟΧΕΙΟ 4
ΔΕΥΤΕΡΕΥΟΥΣΑ
ΕΙΣΟΔΟΣ
ΧΑΡΤΗΣ ΚΥΡΙΩΝ
ΠΕΡΙΒΑΛΛΟΝΤΙΚΩΝ ΜΕΤΡΩΝ
ΙΟΥΛΙΟΣ 2005
ΜΕΛΕΤΗ
Δ. ΑΡΓΥΡΟΠΟΥΛΟΣ & συνεργάτες
μελέτες για το περιβάλλον
Τήνου 2 Χολαργός, τηλ. (210) 6540188, fax. (210) 6538615
ΟΝΟΜΑΤΕΠΩΝΥΜΟ
ΗΜΕΡΟΜΗΝΙΑ
ΥΠΟΓΡΑΦΗ
ΕΛΕΓΧΘΗΚΕ
ΘΕΩΡΗΘΗΚΕ
ΕΓΚΡΙΘΗΚΕ
“ Every system is producing the results it is designed for”
Donald Mark Berwick
Reducing the risks in operational phase ALARP it may still result in a higher level of residual
risk than that which would be achieved by reducing the risks ALARP in the design phase.
Factors which could lead to this difference include (holistic approach) :
• practicability of retrofitting a measure on an existing project,
• the extra cost of retrofitting measures compared to embedded them from design phase,
• the risks involved in installation of the retrofitted measure; and
• the projected lifetime of the project (and the measures).
HELLENIC BUSINESS COUNCIL IN BULGARIA
‫السالمة عنصر من‬
‫عناصر الحضارة‬
Siguria
eshte civilizim
Guvenlik’
uygarligin bir
parcasidir
Bezbednosta e
kultura
Безопасността
е култура
Η ασφάλεια
είναι πολιτισμός
Safety
is an element of civilisation
Management Force Group