Systems Integration

Download Report

Transcript Systems Integration

SDOE 605 Systems Integration
Pre-Reading Assignments
Student Name:
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 1
SDOE 605 Pre-Reading Assignments
 There are four assignments for the SDOE 605 Pre-Reading Assignment:
1. Boeing 787 systems integration practices based on lessons learned
in the Boeing and Airbus aircraft projects
2. Integration of Commercial-Off-the-Shelf (COTS) technologies
3. Comparing Plan Driven and Agile approaches for integration and
testing.
4. Requirements Development, Verification, and Validation Exhibited in
Famous Failures (reading only)
 Be prepared to discuss the assignments on the first day of class.
 You may contact the professor by email if there are any questions about
the assignments.
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 2
SDOE 605 Pre-Reading Assignment #1
 Read the following papers on the Boeing and Airbus aircraft:
» Lapin, M. (1995). Testing Boeing’s 777: Aerospace giant leaves
nothing to chance. Test and Measurement World, April, 1995.
» Pehrson, R.J. (1996). Software Development for the Boeing 777.
» Witwer, B. (1996).
Systems integration of the 777 airplane
information management system (AIMS). Aerospace and Electronic
Systems Magazine, IEEE, April, Vol. 11, Issue 4, pages 17 -21.
» Wall Street Journal (April 1, 2005) “Streamlined Plane Making”.
 Based on your readings on the Boeing and Airbus aircraft:
» Identify 5 good SI practices that should be continued for the
Boeing 787 aircraft project
» Identify 5 areas for improvement that should be applied to the
Boeing 787 aircraft project.
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 3
Case Study - Boeing 787
Good systems integration practices to use on the Boeing
787 aircraft project from Boeing 777 and Airbus aircraft:
1.
2.
3.
4.
5.
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 4
Case Study - Boeing 787
Systems integration improvement opportunities from
Boeing 777 and Airbus aircraft that should be applied to
the Boeing 787 aircraft project:
1.
2.
3.
4.
5.
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 5
Assignment #2
 Read the following papers on using Commercial Off-the-Shelf
(COTS) technologies:
» Boehm, B and Abts, C. (1999). COTS integration: Plug and pray?
IEEE Computer, 32(1), January 1999.
» Reifer, D.J.; Basili, V.R.; Boehm, B.W.; Clark, B. (2003). Eight
lessons learned during COTS-based systems maintenance. Software,
IEEE, Volume: 20, Issue: 5, Sept.-Oct. 2003. Pages:94 – 96
» Sedigh-Ali, S., Ghafoor, A., Paul, R. (2001). Software Engineering
Metrics for COTS Based Systems. IEEE Computer, Vol. 34, No. 5,
May 2001, pp. 44-50.
 Based on your readings on COTS technologies:
» Identify 5 benefits to integrating Commercial-Off-The-Shelf
(COTS) technologies in development projects
» Identify 5 potential problems to integrating Commercial-OffThe-Shelf (COTS) technologies in development projects.
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 6
Assignment #2
Five benefits to integrating Commercial-Off-The-Shelf
(COTS) technologies in development projects:
1.
2.
3.
4.
5.
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 7
Assignment #2
Five potential problems to integrating Commercial-Off-TheShelf (COTS) technologies in development projects:
1.
2.
3.
4.
5.
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 8
Assignment #3
 Read the following paper:
» Pyhajarvi, M.; Rautiainen, K. (2004). Integrating Testing and
Integration into Development. Engineering Management Journal,
March 2004, 16, 1, page 33-39.
 Based on your reading of this paper:
» Identify advantages and issues associated with Plan Driven
integration and testing
» Identify advantages and issues associated with Agile approaches to
integration and testing.
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 9
Assignment #3
Plan Driven integration and testing:
•
Advantages
•
Issues
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 10
Assignment #3
Agile integration and testing:
•
Advantages
•
Issues
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 11
Assignment #4
 Read the following paper:
» Bahill, A. Terry, and Henderson, Steven J., Requirements
Development, Verification, and Validation Exhibited in Famous
Failures (2004)
» Be prepared to discuss these programs and their issues
related to integration, verification, and validation in class
© Copyright –Stevens Institute of Technology – Prof. William D. Miller [email protected]; 1.908.759.7110
Page 12