Presentatie REstore

Download Report

Transcript Presentatie REstore

VREG
Beleidsplatform
REstore
1, Glass Wharf
Bristol BS2 0ZX
United Kingdom
REstore Flexpond UK Ltd.
Arthur Matthyslaan 61
2140 Antwerp
Belgium
REstore NV/SA
[email protected]
www.restore.eu
This document is intended for introductory discussion.
Any use of the information contained herein for purposes other than those mentioned, is prohibited. Unauthorized distribution is prohibited.
Agenda
1
Wat is “demand response”
2
Wie is “REstore”
3
Tertiaire reserve 2013 REstore - ELIA
4
Voorwaarden tot succes
2
Strictly confidential
Bij vraagsturing (Demand Response / Effacement) wordt vermogenvraag in real-time
gereduceerd, voor ‘balancing’ of ‘reserve’ doeleinden
Curtailable reserve (Rref):
4,64 MW curtailable
power demand.
“Hard commitment”
Response time:
100% delivered in
2min20sec
3
Marktstructuur
Fully automated
REstore managed from start to finish
No human intervention required
10x MW demand response
4
Vraagsturing / demand response biedt belangrijke voordelen voor de maatschappij: lagere kost
en minder CO2
Vraagsturing/aggregatie bespaart CO2 emissies
grCO2/
KWH
EUR/
MW/jaar
Vraagsturing/aggregatie heeft significant lagere
kosten
> 100,000
> 800
0 à 300
< 35,000
Gascentrale
Vraagsturing
Gascentrale
Vraagsturing
5
Agenda
1
Wat is “demand response”
2
Wie is “REstore”
3
Tertiaire reserve 2013 REstore - ELIA
4
Voorwaarden tot succes
6
REstore is een Demand Response aggregator
WIE

Verzamelt ongebruikte en afschakelbare
elektrische capaciteit bij industriële en
professionele klanten
Opgericht in 2010 door Jan-Willem
Rombouts en Pieter-Jan Mermans

Twee succesvolle kapitaalrondes; >4 M€
aan venture capital (om. LRM, AXE
Investments / AckermansVanHaaren)
Stelt deze gegroepeerde capaciteit voor
aan energie marktspelers (Elia, EDFLuminus, National Grid, ...)

Beschikt over haar eigen technologie
platform FlexpondTM

Nieuwe dienstverlener op de Europese
energiemarkt (aggregator)


WAT

“Senior” Raad van Bestuur
(R. Thomaes, P. Carpentier,
W. Heyselberghs, S. Bijnens)

Actief in Benelux & UK
7
Agenda
1
Wat is “demand response”
2
Wie is “REstore”
3
Tertiaire reserve 2013 REstore - ELIA
4
Voorwaarden tot succes
8
Pilot project scope: 10 MW of interruptible load from industrial power consumers
DR direction
Demand curtailment.
Term
1/1/2013 – 31/12/2013
Loads
All are DGO-connected
# of sites aggregated
Response time
Number of utilizations /year
15
< 3 min
25
Max. utilisation time / activation
120 min
Cease time
< 30 min
Recovery period
12 hrs
# of ARPs involved
4
# of DSOs involved
3
9
Two deviations from ELIA-ARP contract, validated by all involved ARPs, due to DSO-connected
load
Settlement: how
to meter demand
from DGOconnected loads
 REstore provides real-time metering signals at the level of the Aggregated Site to ELIA. One signal
per 30 seconds shall be provided.
 Meters comply with the technical and accuracy specifications of DGO-approved AMR meters.
 Meters measure demand at the level of the EAN, or exceptionally in context of this pilot project,
may be measuring the demand of the equipment which is contracted for demand curtailment.
 REstore provides to ARP in quasi real-time all relevant metering values whenever load from ARP
perimeter is curtailed.
No “Nomination”
available => no
compensation of
ARP perimeter
 No compensation of the ARP perimeter to correct for the interruption instruction, as no nomination
data per EAN is available to ELIA for DSO connected loads.
 As a result, ARP will have an imbalance which is by default opposite to the overall system
imbalance, hence will always receive the imbalance tariff as generation > demand.
 Validation for scope of pilot project with all involved ARPs
10
Two types of demand curtailment: “fixed Rref” - model (~ R3 production) versus the “ICH / SL”
– model
“Fixed Rref”-model: Rref always 100% delivered
MW
Fixed Rref
MW
“ICH / Shedding Limit” - model
Shedding Limit
Rref 100% delivered &
guaranteed - always
MW
Fixed Rref
Comparable to turbine –
classic “R3 production”
!
Rref not delivered.
MW
Variable “energy”
delivery over the year.
Shedding Limit
EU benchmark: 50Hertz, Tennet, National Grid, ...
11
Agenda
1
Wat is “demand response”
2
Wie is “REstore”
3
Tertiaire reserve 2013 REstore - ELIA
4
Voorwaarden tot succes
12
Demand Response: pathway to success
Algemeen:
 Gelijkwaardige behandeling van demand response en centrales in de reserves;
 Bv. geen volumebeperkingen voor demand response
 Overleg & transparantie:
 Bv. Atrias kick-off
 Eenvoudige markttoegang (geen onnodige drempels):
 Bv. notificatie van, geen toelating door, BRPs
 Duidelijke en stabiele technische parameters (reactietijd, afschakeltijd, # afschakelingen per jaar, etc);
 Adequate financiële vergoeding teneinde deelname van aggregatoren en verbruikers te stimuleren;
Specifiek ikv. R3 Dynamic Profile:
 Convergentie contract BSP-DSOs enkel mogelijk dmv. bilateraal overleg tussen Balancing Service Providers
en DSOs
 Transparant & efficiënt pre-qualificatie proces noodzakelijk
 Investeringsonzekerheid wegnemen door disqualificatierecht af te bakenen
13
REstore NV/SA
Arthur Matthyslaan 61
B-2140 Antwerp, Belgium
Tel.: +32/3/320.80.39
Cell.: +32/479.94.72.36
[email protected]
www.restore.eu
14