Interpretation of RCM traces

Download Report

Transcript Interpretation of RCM traces

Interpretation of
RCM traces
Nicola Sawyer
Date 27.01.2011
1
P-Way Faults
Date 27.01.2011
N.Sawyer
2
Lift & Pack required
Date 27.01.2011
N.Sawyer
3
Dry Slide Chairs
Date 27.01.2011
N.Sawyer
4
Moving chair pads
Date 27.01.2011
N.Sawyer
5
Obstruction fouling movement
Date 27.01.2011
N.Sawyer
6
Switch Creep
Date 27.01.2011
N.Sawyer
7
Split sleeper
Date 27.01.2011
N.Sawyer
8
Rotten Sleeper
Date 27.01.2011
N.Sawyer
9
S &T Issues
Date 27.01.2011
N.Sawyer
10
New Brushes Required
Date 27.01.2011
N.Sawyer
11
Points not locking
Date 27.01.2011
N.Sawyer
12
Tight Lock
Date 27.01.2011
N.Sawyer
13
Burning Contacts
Date 27.01.2011
N.Sawyer
14
New Gearbox required
Date 27.01.2011
N.Sawyer
15
Schwihags require adjusting
Date 27.01.2011
N.Sawyer
16
Rollers dragging
Date 27.01.2011
N.Sawyer
17
Dragging kicking straps
Date 27.01.2011
N.Sawyer
18
High tension on Toe End
Date 27.01.2011
N.Sawyer
19
Back drive requires adjustment
Date 27.01.2011
N.Sawyer
20
Slipping Clutch
Date 27.01.2011
N.Sawyer
21
Faulty brake unit
Date 27.01.2011
N.Sawyer
22