Access and Connection processes for Renewable
Units:
Experiences from Red Eléctrica de España
Istambul
March 2011
RED ELÉCTRICA DE ESPAÑA
Recent modifications of regulation for Special
Regime Generation (SRG)
Recently, National regulation oriented to control of generation to be connected per year,
securing economic and technical sustainability

RD1578/2008 for Solar FV, extending RD661 objectives with quotas of 500-400 MW per
year with progressive reduction of tariffs
 emphasis on roof plants over floor plants

RDL6/2009 for the rest of SRG, establishing quotas per year for plants to be
commissioned (upto ≈ 2,5 GW Solar Thermal in 2013; upto ≈ 23 GW Wind in 2012),
demonstrating some pre-requisites:

Access and connection authorization issued by REE or distribution company

Administrative authorization for power plants > 100 kW

License for Commissioning

Deposit of a bank guarantee (for wind: 20€/kW; for Solar Thermal: 100€/kW)

Financial resources at least for 50% of the total

Purchase -or contract- at least for 50% of the equipment

Authorisation for gas access and water supply (when applicable)
RED ELÉCTRICA DE ESPAÑA
Development and Access to the Network
Capacity of the Transmission Network for Generators:
 General: No grid capacity reserve or preference derives from
temporal precedence. Possible production constraints are to be
solved by market mechanisms
 No connection limitation: Newcomers may degrade the production
possibilities of existing or previously foreseen
 Less barriers but more uncertainty  tendency to overinstallation
 Special Regime Generation
 Priority at dispatch, subject to system security
 operation risk
 Congestions motivate system development  ineffective planning
Connection limitation according to zonal studies from OS
3
RED ELÉCTRICA DE ESPAÑA
Network Access and Connection: Transmission grid
development implications from RES units

Number of Access applications very
transmission nodes evacuation capacity
over
some

Regional limits for installing new generation

Wind farms building time much shorter than needed for
network developments necessary for connection

Permissions for new generation
(via Regional
Administration) easier to get than network reinforcement
ones
RED ELÉCTRICA DE ESPAÑA
Interaction between Grid Planning and Access to the
grid applications
Grid Planning
Access to the grid
• REE carries out planning studies and proposals
Regulated continuous process
• National Goverment (with Regional Administrations):
by
approve the grid development plan
acceptability
• Every 4 years, new planning horizon (10 years)
Binding (unlike indicative planning for generation)
which
REE
transmission
assess
of
the
non-
facilities
applications
Studies for SRG
Integration
The actual development of the grid (authorization, construction and
commissioning) takes from 1 to more than 10 years

5
RED ELÉCTRICA DE ESPAÑA
SRG Integration Studies
A new perspective is introduced
From ¿What capacity of integration ?

To ¿Which conditions and requisites
Regulation
Proposals
would be needed to maximize secure integration of SRG
(RES) and achieve the foreseen objectives?
Bulk System or
Coverage Studies
(Single Bus System
Adequacy Studies)
Grid Studies
Estimation of Operation
Conditions
Zonal connection capacity in MW
6
RED ELÉCTRICA DE ESPAÑA
Capacity Studies

Assessment of generation limits to preserve adequacy and security of power
system, according to planning and operation criteria, applied to an horizon within the
current medium term grid development plan

Adequacy: Assessment of generation limits by nodes and zones, reflecting
structural grid capacity

Steady State Behaviour (load flow contingency analysis)

Short-circuit power (5% Scc, for non dispatchable fluctuant
generation)

Security: Validation of previously concluded limits by nodes and zones


Dynamic behaviour (stability after short-circuit)
Design criteria: buses with sufficient meshing, minimum magnitud for
generation, …..
7
RED ELÉCTRICA DE ESPAÑA
Development and Access to the Network for Renewable
Generators (RES): Connection Capacity
Preserving the security of supply requires to avoid persistent
constraints from RES units in order to:
Limit the operational risk associated to the solution of constraints and the
security guarantee, specially considering the dispatch priority


Enable a coherent and efficient grid development
This calls for establishing connection capacities by zone associated to
grid development plans which may avoid permanent constraints

8
RED ELÉCTRICA DE ESPAÑA
Access and Connection : Overview

Procedures for Access and connection are managed by REE, as System
Operator and and Transmission owner. Main Features:
Main Perspective
Object - Scope
Access
System Operation
System behaviour
Connection
Transmission
Engineering and Physical Feasibility
Connection Contract (CC)

REE carries out capacity studies at nodal and regional levels  Capacity of Connection

Regional Administrations identify Coordinator (C) and generators

C accomplish Access and Connection Procedures  Connection Authorisation

Connection Authorisation enables Administrative Authorisation

Administrative Authorisation enables Connection Contract with Transco

Administrative process (*) different according to Regions

Recently, new national regulation oriented to control of generation to be connected per
year, securing economic and technical sustainability (National Administration)
9
RED ELÉCTRICA DE ESPAÑA
Access and Connection : Overview

Procedures

Access Application (m = month)
 Connection to Transmission
>>>
 Connection to Distribution (> 10 MW.)
> DO> SO (REE)
SO (REE)
2m
REE issues a report evaluating access feasibility, fulfilling system security criteria

Connection Application
>>>
Trans.Co.
Agent submits engineering Project and Programme
 Trans.Co. elaborates Report of Technical Conditions for Connection
 SO (REE) supervises and issues a report
Agent
1m
1m
< TECHNICAL ACCESS CONTRACT> Transmission Company
10
RED ELÉCTRICA DE ESPAÑA
Access approach for special generation

REE carries out Regional studies assessing capacity connection for
generation (depending on energy source and technology), which are
sent and presented to Regional Adm.

Individual Applications: Access reply is informative not valid for
connection procedure

Regional Adm. Identify (*) generators according and nominates
Coordinator

Coordinator submits access application with the aggregation of
individual plants sharing connection point and facilities

REE replies according to the Regional study, accomplishing access
procedure and enabling to start and accomplish connection procedure:
Connection Authorisation

Connection Authorisation enables Administrative Authorisation

Administrative Authorisation enables Access Technical Contract with
Transco

Administrative process (*) different according to Region
11
RED ELÉCTRICA DE ESPAÑA
Regulation for connection and Administrative Authorisation for Special
Regime (renewable) units
Bank Guarantee to cover
TSO access + connection
management expenses
Application
Coordinated
Application
Electrical
Procedures
Regional
administrative
Authorization
Special Regime Register (Spanish
Industry Ministry)
An additional bank Guarantee is
required by National Administration
Access
Access
Connection
Administrative
Authorisation
Connection
Contract
Previous Inscr. In
Register
Requirements
Authorisation
PESp
Production Control
Checks
Report by SO: Acess,
connection, integrat. at Control
Center and Operating
procedures fulfillment
GUARANTEE
CANCELATION
Commissioning
Certificate
Definitive Inscription
(after 85% of objective 
final date)
Commissioning
12
RED ELÉCTRICA DE ESPAÑA
Grid development
WIND POWER: High presence in
transmission (>60%, contrary to
other systems with high penetration)
and expected to increase
NºNodesRdT
Today
220 & 400 kV
Future
49
> 100
150 MW
250 MW
150 MW
250 MW
22 MW
SOLAR POWER:
100 MW
TS.- Majoritary in transmission (≈ 80%)
4.293 MW
FV.- Minoritary in transmission(≈ 5% of
existing; few new plans)
2.960 MW
41 MW
400 MW
3.830 MW
49 MW
435 MW
1.800 MW
Grid Applications: 14.730 MW
T: 11.583 MW
D: 3.147 MW
13
RED ELÉCTRICA DE ESPAÑA
Main challenges: Grid Development
 RES generation does not avoid distribution grid but requires transmission
expansion, where the majority of Wind Power (>60%) and Solar Thermal (>80%) is
expected. RES is a relevant motivation in the current Plan:
 new lines and reinforcements for avoiding constrains operation
 facilities associated to physical connection
OH Circuit [km]
UG Cables [km]
Uprating lines [km]
SS [nº bays *]
Transformers [MVA]
Reactors [Mvar]
Capacitors [Mvar]
12.270
386
8.308
3.476
52.450
2.800
1.100
CORNIDO
VENTORRILLO
GRELA-2
SABON
SABON
LARACHA
MEIRAMA
VIMIANZO
ALUMINIO
BOIMENTE
TABIELLA II
TABIELLA II
TABIELLA
LAGRANDA
A.ZINC
TRASONA
EIRIS
S.MARCOS
ELPALO
SANZO
SIDEGASA
CAMBADOS
MASGALAN
MASGALAN
TIBO
ALBARELL
PAZOSBORBEN
N. VIGO
BALAIDOS
SUIDO
CASTRELO
ZIERBENA
SANTURCE
ELABRA
ARGIA
IRUN
ARKALE
PASAJES
GATICA
ORTUELLA
ZAMUDIO
NERVACERO
BABCOCK
AMOREBIETA
HERNANI
AZPEITIA
ABADIANO
ZUMARRAGA
AYALA
ICHASO
ORMAIZTEGUI
TUBOS
MONDRAGON
ARISTRAIN
TUBACEX
ELGEA
VITORIA
GAMARRA
MURUARTE
GAROÑA-BARCINA ALI
FORJAS
MURUARTE
ABANTO
ABANTO
ACEBIZK
ALONSOTEGUI
BASAURI
LAJARA
SIDENOR
GUEÑES
TJARA2
TJARA1
VIRTUS
ONDINAS
PEÑADRADA
REMOLINA
VELILLA
MATAPORQUERA
MATAPORQUERA
GUARDO
CILLAMAYOR
LAROBLA
MAZORRAS
S.MARINA
CTCOMPOSTILLA
ELCERRO
POZASAL
VILLAMECA
PONFERRADA
MTESLEON
CORNATEL
MONTEARE
MONTEARENAS
TRIVES
MONTEDERRAMOS
CONSO
SOUTELO
APARECIDA
APARECIDA
LORA
HERRERA
VILECHA
QUERENO
SOBRADELO
SANTIAGO
P.BIBEY
PRADA
S.AGUSTIN
VILLATORO
ESTEPAR
VILLIMAR
ONCALA
TREVAGO
TPALENCIA
TRENEDO
CORCOS
MUDARRAI
POLA
LANZASAGUDAS
CALDERS
ESPARTAL
MUNIESA MUDEJAR
OTERO
OTERO
MAIALS
ELS AUBALS
ELS AUBALS
SAGRERA
BSONUEVO
T ANGCATA
E IXAMPLE
VILANOVA
URGELL
MATA
VALDONCELLES
SANTS
CORNELLA
CERDA
HOSPITALET
MOTORS
S.BOI
ZAL
PUIGPELAT
VIL ADECANS
T RSNT BOI
Z.FRANCA
AENAE STE
VIL ADECANS
AENOE STE
GARRAF
GAVA
CASTE LLET
LA SELVA
F OIX
MORELL
PERAFORT
CONSTANTI
TARRAGONA-G
TARRAGONA
TARRAPOWER
REPSOL
BELLICENS
VANDELLO
VANDELLOS
S.COSTERA
DELTEBRE
MEZQUITA
MEZQUITA
SALSADELLA
SALSADELLA
MORELLA
VINAROZ
CAMARMA
BENICARLO
MECO
DAGANZO
F TECILLA
P ARACUELL OS 2
P ARACUELL OS 1
AENA
ANCHUELO
ANCHUELO
CVAL MANZ
HORTALEZA
P SF ERNANDO
ARDOZ
CANILLE JAS
VICALVAR
VICAL
VARO
RET IRO
ME DIODIA
CERP LATA
COSLADA
L OSCERROS
COL IMPICA
PLATEA
L OE CHES2
L OECHES
VALLECAS
P RADOLONGO
P RINCESA
CONGOSTO
RIVAS
AGUACATE
BOLARQUE
J.CABRERA
BERROCALES
P QINGENI
VDCARROS
MERCAMADRID
F ORT UNA VILL AVE R E STE
VILL AVE RDE
VILL AVE RDE
RETAMAR
P RADSANT
ARMUÑA DE TAJUÑA
VALDEBE BAS
CAMP ONAC
L AS MERCEDES
SIMANCAS
P ROSP ERI
MBE CE RRA
NORTE
L ISTA
L AESTRE
MAZARRED
ARGANZUELA
P OL IGONC
T RIGALES
VILL AVICIOSA
L UCERO
ALCAL A II
P ARACUELLOS
SANCHINARRO
S.ROQUE
E LCOTO
P ALAFOX
MELANCOL
VENTAS
P RAHONAL
BEJAR
G.GALAN
T ORRECILLA
ARGANDA
CARPE TANIA
BUE NAVISTA
F UE NL ABRADA
T ORRECILLA
GE T AFE
L EGANES
C.F RE GAC
MORALEJA
E LHORNILLO
P INTO
PARLA
MORATA
P ARL A OESTE
VALMOJADO
P INT OAYUDEN
T VELASCO 2
T VEL ASCO
T VEL ASCO
OROPESA
VALDRIVA
P ERALES
BELINCHON
VALDE MORO
E RVAL DEM
ILLE SCAS
MARINA
L OS P RADILLOS
TORRIJOS
SESENA
AÑOVER
EBORA
LA PUEBLANUEVA
MARAGALL
L ESCORT
S.JUST
COLLBLANC
CAN RIGALT
NUDOVIAR
MONTBLANC
RIBARROJA
ALFORJA
ASCO
ARAGON
TERUEL
AL GETE
SSREY ES2
SSRE YES
ARR. VEGA
TALAVERA
BADALONA
N.BARRIS
F UE NT E HITO
CDE P ORTI
AZCA
CASACAMPO
CDIMAGEN
ARAÑUELO
GUIXIERES
VERNE DA
S.ANDREU
L ESSEPS
SARRIÁ
F ACULTAT
S.FE LIU
BE GUES
P E NE DES
ALCOBENDAS
E LPILAR
ARAVACA
BOADILLA
EALMARAZ
BARO VIVER
T RINITAT
F UENCARRAL
MIRASIE RRA
V.ARCIP RESTE
MAJ ADAHONDA
CASATEJADA
CANYET
CAN J ARDI
CAN J ARDI 2
DESVE RN
DESVE RN
CERVELLO
VENDRELL
SECUITA
SECUITA
ESCUCHA
TRILLO
T 3CANTOS
CEREAL
CEREAL
L AS MATAS
BRUNE TE
HUELVES
COLOREJA
BENADRES
INGENIO
LAPLANA
ARANJUEZ
AÑOVER 2
ACECA
SERRALLO
CASTELLON
BECHI
VILLARREAL SUR
VVA ESCUDEROS
BURRIANA
RAMBLETA
SEGORBE
VALLDUXO
AZUTAN
VALDECAN
ALMARAZ
CODONYER
RUBI
VCONEJOS
FUENTES ALCARRIA
GAL AP AGAR
GAL AP AGAR
TORREJON
S.COLOMA
GRAMANET
N.S.COLOMA
GRAMANET
S.CUGAT
RMART ORELL
CSBISBAL
MEQUINENZA
CCTELNOU
HIJAR
CARIÑENA
S.FOST
SABADSUR
ABRERA
S.A.BARCA
ESCATRON
FUENDETODOS
LASTRAS
PLASENCIA
C.BARBA
P IEROLA
SUBIRATS
TORSEGRE ESPLUGA
ESPLUGA
CALAMOCHA
CRODRIGO
CRODRIGO
CAÑAVERAL
LAROCA
P ALAU
MANFIGUERES
JUNEDA
CELSA
PEÑALBA
ELVENTERRO
MEDINACELI
JM.ORIOL
ANOIA
RUBIO
R.CALDES
CANTALEJO
CEDILLO
S.CELONI
F RANQUE SES
SENTMENAT
OSERA
MONTETORRERO
VIENTOS
CABEZOSR
SEGOVIA
GUIJOG.
RIUDARENES
CENTELLES
PUJALT
ALBATARREC MANGRANERS
CARDIEL
PLAZA
MARIA
VILLAMAYOR
PINOFRANQUEADO
BESCANO
BESCANO
PENAFLOR
PEÑAFLOR
L.LEONES
LOSVISOS
RUEDA
OLMEDO
MEDINA
SANTIZ
JUIA
VIC
VILLANUEVA
JALON
ALMAZAN
TERRER
PIÑUEL
VILLARIN
VILLARINO
HINOJOSA
OLVAN
S. PALLARS
TARDIENTA
ENTRERRIOS
BAYO
ATALAYA
RAMIS
RAMIS
CERCS
S. PALLARS
CINCA
MAGALLON
MONCAYO
LAGUNA
LAS ARROYADAS
BEMPOSTA
LAGOAÇA
ALDEADAVILA
LAPOBLA
GRADO
MONZON II
MONZON II
MONZON
AVEZARAG
SAUCELLE
LLOGAIA
ADRALL
SORIA
MUDARRA
TORDESILLAS
LLAVORSI
P.SUERT
MEDIANO
A.GURREA
ALMUDEVAR
RIOGALLEGO
GURREA
CARTUJOS
ZAMORA
ESCALDES
SALLENTE
ESQUEDAS
TUDELA
ELOLIVAR
VILLALCA
SAYAGO
POCINHO
OLITE
SESUE
ESCALONA
CASTEJON
ZARATAN
RENEDO
LAOLMA
RICOBAYO
CASTRO
LAFORTUNA
SABIÑANIGO
ALCARAMA
LASERNA
PALENCIA
TABESCAN
MORALETS
ERISTE
BIESCAS
SANGUESA
TAFALLA
ELEREBRO
GRIJOTA
VALPARAISO
LINDOSO
CORDOVILLA
QUEL
SENGRACIA
SENGRACIA
BECILLA
SANABRIA
LUBIAN
BAIXAS
PRAGNERES
ORCOYEN
LOGROÑO
SEQUERO
ARRUBAL
LARDERO
VILLALBILLA
VALLEJERA
RIBADELAGO
EZCABARTE
MERCBENZ
JUNDIZ
PUENTELA
BRIVIESCA
LAS LLANAS
MIRANDA
ABERIN
MIRANDA
LAGUARDIA
ALCOMOLA
HARO
P.POZA
COMPOSTILLA
LALOMBA
PIÑOR
S.PEDRO
S.ESTEBAN
VELLE
P.E.SIL
CARTELLE
FRIEIRA
ATIOS
MONTOUTO
VALLEGON
AGUAYO
VILLAMANIN
ANLLARES
BELESAR
CANDO
ACERIASA
CACICEDO CICERO
ASTILLER
SOLORZANO
PENAGOS
SOLORZANO
PENAGOS
PSMIGUEL
VALLE DEL NALON
TELLEDO
CHANTADA
AMEIXEIRAS
TOMEZA
LOURIZAN
PIELAGOS
TORRVEGA
LABARCES
SNIACE
LADA
SAMA
PEREDA
VILLABLINO
SANCOMPO
PDEMOURO
TAMBRE NUEVA
CAYETANO
MDCARRIO
VILLAGARCIA
COSTA VERDE
SILVOTA
SOTORIBERA
VILLALLANA
N. DUMBRIA
TAMBRE II
MAZARICO
UNINSA
SIERO
S.CLAUDIO
GRADO
SALAS
NARCEA
PESOZ
LUGO
DUMBRIA
CARRIO
CARRIO
ABOÑO
TAMON
TAMON
P.G.RODRIGUEZ
PUERTO
MESON VENTO
New substations and bays:
Some 100 buses in 220 kV
and 50 in 400 kV
MONCOFAR
VILLARES
MORA
SAGUNTO
STAPONSA
OLMEDILL
OLMEDILLA
FALAGUEIRA
SIDMED
TSIDMED
MORVEDRE
MORVEDRE
MINGLANILLA
PUZOL
GAUSA
CARRASES
ELIANA
F.MUESTRAS
CACERES
MADRIDEJOS
ARENALES
PATRAIX
PICON
SAN SERVAN
SAN SERVAN
MERIDA
MONTIJO
STA. TERESA
LAPALOMA
ALARCOS
VALDEPEÑAS
VENTAINES
MAIMONA
SALADAS
ELCHE2
GUADAME
LANCHA
AZAHARA
ROCAMORA
ANDUJAR
UBEDA
MONTEBAJO
PALMAR
PALMAR
ARENAL
ARENAL
CASILLAS
ALMODOVAR
ARNEVA
ULEA
TORREMEN
TORREMEN
MURCIA
BALSICAS
CASAQUEMADA
SALTERAS
ILIPA
SUPERNORTE
ONUBA
VNUEVREY
EMPALME
STAJUSTA
ENCE
CRUZCAMPO
SANTIPON
ESPARTINAS
ALJARAFE
RANILLAS
S.ELVIRA
PITAMO
CABRA
CARRIL
CAPARACENA
ILLORA
CORBONES
DOSHMNAS
CORNISA
DRODRIGO
PALACIOS
RODANDAL
RODANDAL
ROCIO
GIBALBIN
ARCHIDONA
PADUL
ANTEQUERA
ATARFE FARGUE
GABIAS
TAJOENCANTADA
CADIZ
CARTUJA
CARTUJA
ARCOSFRT
PTOREAL
ATANASIO
JORDANA
JORDANA
GAZULES
TCASARES
MANILVA
PARRALEJO
CARTAMA
CARTAMA
MONDA
COSARIO
ORGIVA
ANTEQUERA 2
TABERNAS
TABERNAS
LITORAL
LITORAL
BENAHADUX
BERJA
L.MONTES
LOSRAMOS
CENTRO
EUROPA
TORREMOLINOS
POLIGONO
ALHAURIN
LA RIBINA
HUENEJA
MONTEALEGRE
SANLUCAR
PURMARIA
ESCOMBRERAS
BAZA
MAZUELOS
ENTRENUCLEOS
ATALAYA
TORARENILLAS
MAR MENOR
FAUSITA
PUENTE GENIL
URSO
ALCORES
SIDERAND
QUINTOS
GUADAIRA
PALOMARES
PALOS
STABARBARA
N.CENTENAR
CENTENAR
VIRGENRO
GUADAIRA
ENSANCHE
N C.COLON
ROJALES
TORREVIEJA
SMSALINAS N.
SMSALINAS S.
CAMPOAMOR
HOYAMORENA
ASOMADA
NESCOMBRERAS
COSTALUZ
MTEBELLO
SANTAPOLA
BAJO SEGURA
S.P.PINATAR
TOTANA
OLIVARES
CARMONA
CARMONA
VERGEL
VILLAJOYOSA
CANTALAR
CABO HUERTAS
ALICANTE
S.VICENT
RABASA
PALMERAL
N.SALADAS
PETREL UNIVERSIDAD
ALTET
PEÑARRUBIA
NOVELDA
ALCOLEA
GANDIA
JIJONA
JIJONA
CASTALLA
PETREL ESTE
JANDULA
GUILLENA
P.TABERNES
GANDIA SUR
BENEJAMA
SAX
ARROYOVALLE
PUEBLA DE GUZMAN
VALLDIGNA
MONTESA
PINILLA
BIENVENIDA
BROVALES
ALQUEVA
ALCIRA
VILANOVA
MANZANARES
MANZANARES
ARGAMASILLA
LA NAVA II
LA NAVA
P.LLANO
ELCOGAS
SIBALBOA
BALBOA
TALCIRA
AYORA
ROMICA
BENICULL
ELBROSQUIL
CATADAU
CAMPANARIO
BRAZATORTAS
BRAZATORTAS
TALQUEVA
R-C.REAL
ALBAL
CORTESII
ALMADEN
ALANGE
ELGRAO
F.S.LUIS
LA TORRE
TURIS
TURIS
PTO. LAPICE
LAMUELA
CAMPOMAYOR
SAGRAJAS
SAGRAJAS
ALVARADO
PQ. CENTRAL
TORRENTE
TORRENTE
REQUENA
ELEMPERADOR
VALDECABALLEROS
COFRENTES
VAGUADAS
BENIFERRI
PQ. CABECERA
NOUMOLES
VIVEROS
ALAMEDA
QUARTPOB
ALDAYA
TRUJILLO
ALCUESCAR
ALBURQUERQUE
NERJA
VENTILLA
COSTASOL
BENAHAVIS
N.CASARES
CASARES
PINARREY
S.ROQUE
BARRIOS
MARISMAS
ACERINOX
FACINAS
PTOCRUZ
ALGECIRA
GBRALTAR
TARIFA
Particular significance: Spain-France interconnection
RED ELÉCTRICA DE ESPAÑA
Transmission grid development implications
Cost Allocation of New Facilities ¿transmission border and who pays what?
Operation and
Maintenance Cost
Investment Cost
Directly associated
Assumed by the agent
Transmission to connection
System
Facilities
Structural
Reinforcement
(Agent guarantees 20% of Cost)
Connection Facilities
System
System
Agent
New substation
New as in/out of
bay
existing line
Existing
Substation
New bay
TransGrid
Connection Facilities (no TransGrid)
RED ELÉCTRICA DE ESPAÑA
Thanks for your attention!