Data Center
Measurement, Monitoring,
Simulation, and Control
February 6, 2009
Critical Facilities Round Table
Power Assure, Inc.
DK Foster, President
650.302.3219
[email protected]
Copyright 2007-2009 Power Assure, all rights reserverd
Why Measure, Monitor, Simulate, & Control ?
Limited Resources
Increased Demand
Tight Money
Copyright © 2007-2009 Power Assure Inc., all rights reserved
2
Why Measure, Monitor, Simulate, & Control ?
$
Economic Meltdown
Energy Efficiency
Global Warming
Copyright © 2007-2009 Power Assure Inc., all rights reserved
3
What’s in your STIMULUS package ?
Corporate
sustainability
goals?
Regulations?
Cost Pressures ?
Copyright © 2007-2009 Power Assure Inc., all rights reserved
Rebates?
Incentives ?
4
Measurement?
Clip Board
Copyright © 2007-2009 Power Assure Inc., all rights reserved
Clamp-meter
5
Monitoring
Spreadsheet
Copyright © 2007-2009 Power Assure Inc., all rights reserved
6
Simulation
Just Try IT
Process Flows
Brain-Storming
1-line mark-up
Copyright © 2007-2009 Power Assure Inc., all rights reserved
7
Control
Manual
Copyright © 2007-2009 Power Assure Inc., all rights reserved
8
Achieving Energy Efficiency
Application
(real-work)
POWER ASSURE
Copyright © 2007-2009 Power Assure Inc., all rights reserved
9
Implementation of Holistic Power Management® suite
POWER ASSURE PORTAL
Site n
Site 2
Site 1
real-time
MOD BUS / BACNET
SNMP, IPMI
BMS
XML,SNMP, TCPIP
SYS MGMT (minus power)
STANDALONE POWER METERING
IT SECURITY
NETWORKING
PROVISIONING
ALERTS/ REMEDIES
SYSTEM MGMT
SERVERS
POWER STRIPS
POWER DISTR.
HVAC
GENERATORS
UPS
LIGHTS
COOLING
TEMP/HUMIDITY
SMOKE
WATER
SECURITY
IT MGMT
TENANT VIEW
OWNER VIEW
FACILITY (OWNER)
DATA CENTER (TENANT)
IT / ENGINEERING
Finance
Copyright © 2007-2009 Power Assure Inc., all rights reserved
10
“Holistic” components from Power Assure
Facility
• Power Distribution
• Cooling
• Environmentals
• Building Mgmt
X-Server
X-Facility
Performance
vs. Efficiency
External
• Power rates
• REBATES
• Environmentals
• Demand Response
STATUS/ALERTS
REBATES
EXCESS+BUFFER
RELOCATION
X-Company
Utilization vs.
Capacity
SURGE RATE
REDUCTION
GHG/CARBON
IT Assets
• Power Baseline
• Performance
Baseline
• Actual
Performance
PUE/DCiE
CADE/PAR4
X-Suite
IT Application
• App Utilization
• History
• Surge Size
SLA/OLA vs.
Actual Need
X-Industry
Cost :vs.
Performance
Availability vs.
Use
X-Platform
(Web, Cloud,
Virtulized)
Copyright © 2007-2009 Power Assure Inc., all rights reserved
REPORTING
ALERTS
SIMULATION
REPLACEMENT
History vs.
Current
ACTIONS
RESELL CREDITS
RESPONSE
RUNBOOK
11
The 451 Group – Independent technology industry analyst company
Energy and power management software
[email protected]
* Johnson Controls
* Honeywell
* Siemens
* TAC (Schneider)
* Cisco(?)
* 1E
* Verdiem
*Big Fix
* Faronics
Desktop power mgt
Energy mgt (BMS)
* CarbonFlow
* Carbonism
* Carbonetworks
Carbon Mgmt Sys
Andy Lawrence,
Research Director,
Eco-efficient IT,
The 451Group
Datacenter power mgt
* Cassatt
* Power Assure
* VMWare
* 1E * CA (?)
Demand response
* Comverge
* EnerNOC *ECS
* CPower
* Site Controls
Smart Grid
* SilverSpring
* Trilliant
* IBM * CPower
* Gridpoint
Eco-Efficiency Eco-System
Holistic POWER Management®
• Service level
• Excess availability
(supply or demand)
• Electric pricing
• Electric availability
• Demand Response
MoM
ELECTRIC
UTILITY GRIDS
FACILITIES/MECHANICAL
ENVIRONMENT
*
COOLING
*
INFORMATION TECHNOLOGY
POWER
POWER * APPLICATION * NETWORKS* SECURITY
CISCO, IBM GS, EYP, ESCOs, ACCENTURE, DELOITTE
SUPPLY
DEMAND
•SYSTEM MANAGEMENT
•PDU/STRIPS
•IT EQUIPMENT(e.g. SERVERS)
•BUILDING SYSTEMS (BMS)
•POWER DISTRIBUTION
•COOLING/ENVIRON CONTROLS
HP, IBM, VMWARE, INTEL, AMD
EMERSON, SCHNEIDER, JCONTROLs,
SERVER TECH, CYBER, APC, RARITAN
SIEMENS, HITACHI,
SYNAPSENSE, MODIUS
Utility Feed to Rack
Copyright © 2007-2009 Power Assure Inc., all rights reserved
SUB-METERING
Rack to Servers
Solution requirements
Features:
Measurement: Base-lined and Benchmarked
Monitoring: Complete, Continuous, Consolidated, and Correlated
Simulation: Real-time and Relevant
Control: Automated and Accurate
Enablers:
Cost effective, flexible, and Service level (OLA/SLA) positive
Integrated with Facility, IT, and Application data
Supported by and supporting Utility Rebates
Vendor agnostic - All vendors, all standards…
Mulit-protocols (e.g. BacNet, ModBus, TCPIP, XML, SNMP)
Automatic Alerts and Actions (Load relocation/reduction)
Base-lined and auditable (server to utility)
Real-time, continuous collection and display
Copyright © 2007-2009 Power Assure Inc., all rights reserved
14
Power Assure’s Holistic Power Management® Suite:
• Holistic Power Monitoring™
–
–
–
–
–
–
1 minute metering interval
Vendor agnostic interface (facility+IT)
In-Facility and Cross-Facility monitoring
Power Distribution Optimization
GHG exposure analysis/reporting
Real-time demand savings simulation
• Holistic Power Management®
– In-Facility and Cross-Facility load
relocation and load reduction
• IT and cooling
• Load-Balanced, Cloud,Virtualized
– Power off or sleep mode options
– Utilization, Demand Response, cost
and availability of power shifting options
Copyright © 2007-2009 Power Assure Inc., all rights reserved
15
Case Study: Facebook
•
Goal: to understand and improve
energy use from server to center
Example only
Integrating with existing meters (Trendpoint,
ServerTech), building management (DLR) and
Application Management (ODS)
Dynamic Dashboard with real-time status and alerts
Building , suite-level, and circuit-level drill-down
Full history and trending
Server baseline measurement (off, idle, loaded,t)
Deployment in Santa Clara, with other sites planned
“ Power Assure is helping our data center become more energy efficient by providing a
comprehensive view of our power consumption, thereby helping us identify where we
can make improvements to ensure we are effectively utilizing every kilowatt of our
expensive mission critical facilities”
- Tom Furlong, Facebook, Director of Site Operations
Copyright © 2007-2009 Power Assure Inc., all rights reserved
16
DEMO
Copyright © 2007-2009 Power Assure Inc., all rights reserved
17
Ready to try Holistic POWER Management® ?
• Qualification:
> 10K ft2
Allow links to BMS/Apps/Racks
Provide feedback / be a reference
• What you get:
PUE range determined
Free install/configuration
1 month real-time monitoring (1 minute interval)
5 server base-lines / efficiency ratings
Simulated savings estimated (using control functions)
• Sign up by Feb 14, install by March 15 (1
st
five DC operators)
Power Assure experts help you optimize each of these elements
Copyright © 2007-2009 Power Assure Inc., all rights reserved