CIGRE SC C2

Power System Operation and Control 24 Novembre 2010, Latina

CIGRE SC C2 Power System Operation and Control

Nuovi regular members:

 Flavio Allella, Italy  Siem Bruijns, Netherlands  Yves Harmand, France  Eung-Soo Jung, Korea  Alan Mac Naughton, Canada  Mark Miller, Australia  Lajos Oroszki, Hungary  Udo Spanel, Germany

Nuovi membri osservatori:

 Roberto Barba, Ecuador  Jasenko Dobranic, Bosnia Herzegovina  David Haim, Israel  Anna Jäderström, Sweden  Dimitros Michos, Greece 2

Latina, 24 novembre 2010

CIGRE SC C2 Power System Operation and Control STRUTTURA ORGANIZZATIVA prima della Sessione 2010 di Parigi

JWG C2/C5

O. Gjerde, Norwa

y JWG C1/C2/C6

H Jones,Ireland

SC C2 Chairman (J. Vanzetta, DE) Secretary (C. Schneiders, DE) AG.1

Nisheeth Singh, Switzerland

Real time System Operation and Control AG.2

Teresa Carolin, S. Africa

System Operational Planning and Performance Analysis AG.3

Hugh Jones,Ireland

Control Centre Infrastructure and Human Resources for System Operation

WG WG WG

1 Active Working Group

C2.13 - Voltage and Var support in System Operation

2 Active Working Groups

C2.21 - Lessons learnt from recent Emergencies and Blackout Incidents C2.22 - Application of resilience engineering to safety enhancing power system reliability WG WG

2 Active Working Groups

C2.33 - Control centre operator Requirements, Selection, Training C2.34 - Capabilities and requirements of a control centre in the 21 st century

CIGRE SC C2 Power System Operation and Control FOCUS su gruppi nuovi avviati con la Sessione di Parigi 2010

AG.1

Nisheeth Singh, Switzerland

AG.2

Teresa Carolin, S. Africa

AG.3

Hugh Jones,Ireland WG WG WG WG

1 Active WG+ 3 New WGs

C2.13 - Voltage and Var support in System Operation

C2.12 - Applications of Synchronised phasor Measurements in Power System Operation C2.15 - Common information model and its prospective use in power system operation C2.16 - Challenges in Control Centre posed by Distributed generation and Renewables

WG WG WG

2 Active WGs

C2.21 - Lessons learnt from recent Emergencies and Blackout Incidents C2.22 - Application of resilience engineering to safety 4 enhancing power system reliability WG

2 Active WGs

C2.33 - Control centre operator Requirements, Selection, Training C2.34 - Capabilities and requirements of a control centre in the 21 st century 4

Latina, 24 novembre 2010

CIGRE SC C2 Power System Operation and Control

Temi principali per la Sessione 2012

1.

2. Challenges in operation caused by the combination of intermittent generation (Wind, PV, etc.) and changes in electrical loads behaviour :    Power balancing Congestion management Frequency and voltage control Evolution of power system control at Continental, Country, Regional and local levels:  Improve the awareness of the overall system status in interconnected system with several control areas  Display of interconnected areas and trigger signals to operators. Visualization techniques   Information exchange and operational interfaces between TSO and other actors: production and load centres 5

Latina, 24 novembre 2010

CIGRE SC C2 Power System Operation and Control

Contributo del C2 al TC project “The Network of the Future” Ruolo attivo sul tema tecnico TI5: New concepts for system operation, control

Key challenges

1. Challenges in operation caused by the combination of stochastic generation (wind,solar,tidal etc...) and changes in electrical loads behaviour due to demand side management heavily influenced by pricing mechanism and efficient management of energy storage for the short and long term. • Power balancing • • • Congestion management Active and reactive reserve Implement Risk management techniques and introduction of probabilistic approaches 2. Evolution of power system control at Continental, Country, Regional and local levels • Improve the awareness of the overall system status in interconnected system with several control areas, • Define the boundaries between TSO and DSO systems in • • terms of Operational Control Display of interconnected areas and trigger signals to operators with visualisation techniques Information exchange and operational interfaces between TSO and other actors: production and load centres 3. Significant Increased level of automation in the control rooms • New software tools to quickly determine the status of the system over wide area and to alarm system operators • Automated adjustment of the configuration and electrical • parameters of the system Automated service restoration and adapted disaster recovery scenarios 4. Assure the competencies and adapt the training of System operators

CIGRE SC C2 Power System Operation and Control

Contributo del C2 al TC project “Energy Efficiency” Ruolo attivo del WG C2.13

WG che contribuisce al TC

WG C2.13 Voltage and VAR support in system operation

Aree di attenzione per il C2

1. Penetrazione delle fonti rinnovabili.

2. Congestioni risultanti dalla massiva penetrazione delle rinnovabili.

Obiettivi Possibili sviluppi futuri

1. Definizione degli assetti di rete che minimizzano le perdite.

1. Sviluppo di tools e sistemi di supporto alle decisioni degli operatori per minimizzare le perdite di sistema.

2. Efficienza del bilanciamento in presenza di significativa generazione rinnovabile.

2. Criteri di gestione della domanda attiva per spianare la curva di carico. 3. Tecnologie HVDC and Facts per la gestione della trasmissione su lunghe distanze per minimizzare le perdite. 7

Latina, 24 novembre 2010

CIGRE SC C2 Power System Operation and Control

Sintesi della riunione del 25 agosto 2010 a Parigi.

La Sessione Tecnica, presieduta dal presidente uscente M. Armstrong (Canada) con Bose e J. P. Desbrosses, ha focalizzato l’assistenza degli special reporters A.

l’attenzione sui seguenti due temi di grande attualità per i sistemi elettrici di potenza: il miglioramento dell’affidabilità di esercizio e il coordinamento del controllo operativo.

Nell’ambito del primo tema, sono stati analizzati gli impatti delle valutazioni della sicurezza dinamica e della determinazione dinamica delle portate degli elementi di rete sul controllo in tempo reale. Con particolare riferimento a quest’ultimo aspetto, sono state presentate sperimentazioni interessanti che confermano l’elevata dipendenza delle portate dalle condizioni ambientali esterne. Sistemi di determinazione dinamica delle stesse, basati sulla misurazione dei parametri esterni effettivi, potrebbero consentire agli operatori di rete di superare i metodi di valutazione convenzionali e, generalmente, conservativi ad oggi in gran parte adottati. Sono state inoltre approfondite proposte innovative relative allo sviluppo di metodologie e strumenti a supporto delle decisioni nelle sale operative, nonché le tematiche dell’utilizzo ottimale delle reti a fronte della crescente penetrazione della generazione intermittente, in particolare di quella da fonte eolica.

Con riferimento al secondo tema, sono stati presentati i primi ritorni di esperienza dai progetti in corso, in gran parte europei, in tema di coordinamento operativo tra gestori di rete. Il coordinamento riguarda soprattutto la fase di preparazione all’esercizio delle reti. Particolare attenzione è stata altresì dedicata agli aspetti di armonizzazione delle regole operative e dei quadri regolatori.

La riunione annuale del Comitato ha visto il passaggio di consegne al nuovo presidente J. Vanzetta (Germania).

Relativamente alle attività in corso nel Comitato, sono stati presentati i progressi sui temi della regolazione secondaria di tensione, sulle misure di prevenzione del collasso di tensione e sui requisiti dinamici per gli aerogeneratori. Inoltre, si sono trattati gli aspetti della resilienza dei centri di controllo e delle nuove esigenze in materia di addestramento degli operatori, con particolare attenzione agli aspetti di certificazione.

8