Transcript Slide 1

PT. ESTU ARTHA LANCAR
ENGINEERING, SUPPLY
& CONSTRUCTION COMPANY
COMPANY

Company Name
:
PT. Estu Artha Lancar

Head Office
:
Jl. Bangka I no. 4A Lt.2, Pela Mampang,
Jakarta Selatan, Indonesia, 12720

Phone
:
(62.21) 32151718

Fax
:
(62.21) 7201270
PT. ESTU ARTHA LANCAR
2
COMPANY REGISTRATION

Akte Pendirian








:3
: 11 Oktober 2006
: Hj. Suzie FH. Tadjoedin SH
Nomor
Tanggal
Instansi
: W7-06282 HT.01.04 – th 2007
: 07 Juni 2007
: Dept, Hukum dan HAM
SIUP




Nomor
Tanggal
Notaris
Pengesahan


: 102
: 16 April 1993
: Ny. SP Henny Shidky SH
Akte Perubahan


Nomor
Tanggal
Notaris
Nomor
Tanggal
Instansi
: 00714 / 1.824.271
: 27 Februari 2007
: Dinas Perindag Pemda DKI Jakarta
NPWP

Nomor
: 01.620.462.0-014.000
PT. ESTU ARTHA LANCAR
3
MANAGEMENT

COMMISSIONER


PRESIDENT DIRECTOR


UTORO WREKSOATMODJO, SE
IR. EMIL JUDO RAHARDJO
DIRECTOR

NOVITA WREKSOATMODJO, SE
PT. ESTU ARTHA LANCAR
4
ENGINEERS
PROCESS ENGINEER
2 person(s)
PIPING & MECHANICAL ENGINEER
2 person(s)
CIVIL ENGINEER
4 person(s)
PIPELINE ENGINEER
2 person(s)
HSE ENGINEER
1 person(s)
ELECTRICAL & INSTRUMENTATION ENGINEER
3 person(s)
TELECOMMUNICATION ENGINEER
1 person(s)
QA/QC ENGINEER
1 person(s)
CONSTRUCTION ENGINEER
2 person(s)
CONTRACT ADMIN & PROGRESS
2 person(s)
PT. ESTU ARTHA LANCAR
5
EXPERIENCES

ENGINEERING








(2006 – 2007)
OFFSTAKE STATION INSTALLATION
(2006 – 2007)
PERUSAHAAN GAS NEGARA SOUTH SUMATRA –
WEST JAVA 4 PIPELINE ONSHORE PROJECT, 32 KM
24” GAS ONSHORE PIPELINE, MUARA BEKASI TO
RAWA MAJU
(2007)
LPG PLAN FLOW LINE SYSTEM PHASE 1, GRESIK
(2007)
LPG TANK & LOADING SYSTEM PHASE 1, GRESIK
(2007 – ONGOING)
EHTYLENE GAS RECEIVING SYSTEM PROJECT PT.
STYRINDO MONO INDONESIA, CILEGON
(2007 – ONGOING)
TTU TUBAN PERTAMINA PROJECT, 120 KM 18” FUEL
ONSHORE PIPELINE, TUBAN TO SURABAYA
(2008 – ONGOING)
KAMBUNA ONSHORE PIPELINE AND MODULE-1
ONSHORE RECEIVING FACILITIES
(2008 – ONGOING)
GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE
PROJECT
PT. ESTU ARTHA LANCAR
6
EXPERIENCES

SUPPLY




(2007)
LPG PLAN FLOW LINE SYSTEM PHASE 1, GRESIK
(2007)
LPG TANK & LOADING SYSTEM PHASE 2, GRESIK
(2008)
PT. STYRINDO MONO INDONESIA’s Y-STRAINER(s)
CONSTRUCTION


(2007)
LPG PLAN FLOW LINE SYSTEM PHASE 1, GRESIK
(2007 - ONGOING)
LPG TANK & LOADING SYSTEM PHASE 1, GRESIK
PT. ESTU ARTHA LANCAR
7
PROJECT PROFILE

Project Title :
“OFFTAKE STASION INSTALLATION”

The custody transfer station for gas supplies from TGI (Transgasindo)
into PGN Natural Gas Riau Distribution Network.

ESTU provides the following services :







Project Management
Detailed Design
Construction
Commissioning
As-built
Hand over Documentation
Profile :

Fiscal Metering Station included :


Buildings included :



First Filtration, Inlet Filters, Meters (Ultrasonic), Chromatographs, Analyzers,
Control Valves, Regulators, Odorize, Corrosion Inhibitor, Process Pipe work,
Venting Pipe work, Instrumentation and Controls, Scada, Switchboards, Diesel
Generators, and Transformers.
Capacity
Client
Administration, Control Room, Fire Station, Utilities, Metering Shelter, Analyzer
Shelter and Guard House.
: Up to 150 MMSCFD
: PT. YUAN SEJATI
PT. ESTU ARTHA LANCAR
8
PROJECT PROFILE

“LPG PLANT FLOW LINE SYSTEM PHASE 1”
Project Title :

The Network.

ESTU provides the following services :








Project Management
Detailed Design
Procurement / Material Supplies
Construction
Commissioning
As-built
Hand over Documentation
Profile :

Fiscal Metering Station included :



Capacity
Client
First Filtration, Inlet Filters, Meters (Orifice), Chromatographs, Analyzers, Control
Valves, Regulators, Process Pipe work, Venting Pipe work, Instrumentation and
Controls
: Up to 40 MMSCFD
: PT. MEDIA KARYA SENTOSA
PT. ESTU ARTHA LANCAR
9
PROJECT PROFILE

“LPG TANK & LOADING SYSTEM PHASE 1”
Project Title :

The Network.

ESTU provides the following services :








Project Management
Detailed Design
Procurement/ Material Supplies
Construction
Commissioning
As-built
Hand over Documentation
Profile :

Fiscal Metering Station included :



Capacity
Client
Tank System, Flare Header System including Flare Sub-system, Loiading
Facilities, Flare Stack, Tank gauging System, Pump Syatem, Instrumentation and
Control System
: Up to 40 MMSCFD
: PT. MEDIA KARYA SENTOSA
PT. ESTU ARTHA LANCAR
10
PROJECT PROFILE

Project Title :
“SOUTH SUMATRA – WEST JAVA GAS
PIPELINE ONSHORE PROJECT”

PERUSAHAAN GAS NEGARA SOUTH SUMATRA – WEST JAVA
GAS PIPELINE ONSHORE PROJECT, 30 KM 32” GAS ONSHORE
PIPELINE, MUARA BEKASI TO RAWA MAJU.

ESTU provides the following services :






Detailed Design
Procurement Assistance
Construction Engineering
As-built
Hand over Documentation
Profile :

Pipeline included :



Capacity
Client
Pipeline Detailed Engineering consists of: 4 Block Valve Station, River and Road
Crossings, Anchor Blocks, Cathodic Protection System
: Up to 400 MMSCFD Gas
: PT. CITRA PANJI MANUNGGAL
PT. ESTU ARTHA LANCAR
11
PROJECT PROFILE

Project Title :
“EHTYLENE GAS RECEIVING SYSTEM
PROJECT”

EHTYLENE GAS RECEIVING SYSTEM PROJECT PT. STYRINDO
MONO INDONESIA, CILEGON

ESTU provides the following services :








Detailed Design
Procurement Assistance
Construction Engineering
Commissioning
As-built
Hand over Documentation
Fitting Supplies (Variation Order)
Profile :

Compressor included :



Capacity
Client
Comppressor Units, First Filtration, Inlet Filters, Coriolis Meters, Chromatographs,
Analyzers, Control Valves, Regulators, Process Pipe work, Venting Pipe work,
Instrumentation and Controls.
: Up to 45 Psi of Ethylene Gas
: PT. CITRA PANJI MANUNGGAL
PT. ESTU ARTHA LANCAR
12
PROJECT PROFILE

Project Title :
“TTU TUBAN PERTAMINA PROJECT”

TTU TUBAN PERTAMINA PROJECT, 136 KM 16” FUEL ONSHORE
PIPELINE, TUBAN TO SURABAYA

ESTU provides the following services :







Detailed Design
Project Management
Procurement Assistance
Construction Engineering
As-built
Hand over Documentation
Profile :

Pipeline included :



Capacity
Client
Pipeline Detailed Design consists of: 2 HDD, 13 Block Valve, Road and River
Crossings, Swamp Area, Anchor Blocks, Cathodic protection System
: 15,000 barrel / day
: PT. CITRA PANJI MANUNGGAL for PERTAMINA
PT. ESTU ARTHA LANCAR
13
PROJECT PROFILE

Project Title
: “KAMBUNA ONSHORE PIPELINE AND
MODULE-1 ONSHORE RECEIVING
FACILITIES”

KAMBUNA PROJECT, 57 KM OFFSHORE TO ONSHORE
PIPELINE, GELAGAH KAMBUNA

ESTU provides the following services :



Electrical and Instrumentation Detailed Design
Hand over Documentation
Profile :

Electrical and Insturmentation included :


Client
Pressure Transmitter, Pressure Indicator, Temperature Transmitter, Temperature
Indicator, Pressure Control Valve, Silenoid Valve, Pressure Safety Valve,
Corrosion Coupon, Corrosion Probe, Pig Signal, Electrical Grounding, Electrical
Lighting, Tubing Layout.
: PT. CITRA PANJI MANUNGGAL for ASIA
PETROLEUM DEVELOPMENT
PT. ESTU ARTHA LANCAR
14
PROJECT PROFILE

Project Title
: “GUNUNG MEGANG SINGA GAS BOOSTER
PIPELINE PROJECT”

GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE PROJECT,
17,5 KM ONSHORE.

ESTU provides the following services :






Detailed Design
Procurement Assistance
Construction Engineering
As-built
Hand over Documentation
Profile :

Compressor and Pipeline included :


Client
Comppressor Units, Control Valves, Process, Pipeline Detailed Design,
Instrumentation and Controls, Electrical and Civil Works.
: PT. CITRA PANJI MANUNGGAL for MEDCO
ENERGY
PT. ESTU ARTHA LANCAR
15
PROJECT PROFILE

Project Title : “PROJECT MANAGEMENT – TTU
TUBAN”

TTU TUBAN PERTAMINA PROJECT, 136 KM 16” FUEL
ONSHORE PIPELINE, TUBAN TO SURABAYA

ESTU provides the following services :


ManPower Supplies
Client
: PT. CITRA PANJI MANUNGGAL for
PERTAMINA
PT. ESTU ARTHA LANCAR
16
PROJECT PROFILE

Project Title : “PROJECT MANAGEMENT – JAMBI
MERANG PIPELINE PROJECT”

JAMBI TO MERANG PIPELINE PROJECT, SUMATRA

ESTU provides the following services :


ManPower Supplies
Client
: PT. CITRA PANJI MANUNGGAL for
Amerada Hess
PT. ESTU ARTHA LANCAR
17
Resources
Software
PROCESS
software
Hysis
PIPING & MECHANICAL
software
Caesar, Pvelite
PIPELINE
software
Autocad PDMS
CIVIL
software
SAP
ELECTRICAL & INSTRUMENTATION
software
PT. ESTU ARTHA LANCAR
Etap, InstruCal
18
FINANCIAL REPORT
PT ESTU ARTHA LANCAR
LAPORAN LABA RUGI
UNTUK PERIODE YANG BERAKHIR 31 DESEMBER 2006 DAN 30 JUNI 2007
Cat
2007
2006
PENDAPATAN
10
1.655.897.143
2.157.768.367
BEBAN OPERASIONAL
11
(1.547.833.977)
(2.033.743.575)
108.063.166
12.024.792
2.207.842
3.807.842
110.271.008
127.832.634
(13.783.800)
(16.034.300)
96.487.208
111.798.334
LABA OPERASI
PENDAPATAN DAN BEBAN NON
OPERASIONAL
12
LABA BERSIH SEBELUM PAJAK
TAKSIRAN PAJAK
13
LABA BERSIH SETELAH PAJAK
PT. ESTU ARTHA LANCAR
19
FINANCIAL REPORT
PT ESTU ARTHA LANCAR
NERACA
PER 31 DESEMBER 2006 DAN 30 JUNI 2007
AKTIVA
AKTIVA LANCAR
Kas dan setara kas
Piutang Dagang
Proyek dalam pelaksanaan
CAT
3
4
5
Jumlah Aktiva Lancar
AKTIVA TIDAK LANCAR
Aktiva Tetap – Nilai Bersih
setelah dikurangi
penyusutan
Jumlah Aktiva Tidak Lancar
JUMLAH AKTIVA
6
2007
2006
353.009.369
5.400.000
249.455.739
292.420.844
10.540.000
197.295.677
607.865.108
500.256.521
124.880.729
138.633.333
124.880.729
138.633.333
732.745.837
638.889.854
KEWAJIBAN DAN EQUITAS
KEWAJIBAN JANGKA
PENDEK
Hutang Dagang
Hutang Pajak
CAT
7
8
2007
2006
2.000.000
13.783.800
674.000
17.741.025
15.783.800
18.415.025
500.000.000
500.000.000
SALDO LABA
216.962.037
120.474.829
Jumlah Ekuitas
716.962.037
620.474.829
732.745.837
638.889.845
Jumlah Kewajiban Jangka
Pendek
EQUITAS
Modal Saham – Modal
Dasar 5000
Saham @ Rp. 100.000
ditempat dan disetor penuh
JUMLAH KEWAJIBAN DAN
EQUITAS
PT. ESTU ARTHA LANCAR
9
20
FINANCIAL REPORT
PT ESTU ARTHA LANCAR
LAPORAN LABA RUGI
UNTUK PERIODE YANG BERAKHIR 31 DESEMBER 2005 DAN 2006
Cat
2006
2005
PENDAPATAN
10
2.157.768.367
223.535.416
BEBAN OPERASIONAL
11
(2.033.743.575)
(214.218.890)
12.024.792
9.316.526
3.807.842
323.969
127.832.634
9.640.495
(16.034.300)
(964.000)
111.798.334
111.798.334
LABA OPERASI
PENDAPATAN DAN BEBAN NON
OPERASIONAL
12
LABA BERSIH SEBELUM PAJAK
TAKSIRAN PAJAK
13
LABA BERSIH SETELAH PAJAK
PT. ESTU ARTHA LANCAR
21
FINANCIAL REPORT
PT ESTU ARTHA LANCAR
NERACA
PER 31 DESEMBER 2005 DAN 2006
AKTIVA
AKTIVA LANCAR
Kas dan setara kas
Piutang Dagang
Proyek dalam pelaksanaan
CAT
3
4
5
Jumlah Aktiva Lancar
AKTIVA TIDAK LANCAR
Aktiva Tetap – Nilai Bersih
setelah dikurangi
penyusutan
Jumlah Aktiva Tidak Lancar
JUMLAH AKTIVA
6
2006
2005
292.420.844
10.540.000
197.295.677
273.276.065
125.755.939
500.256.521
399.032.004
138.633.333
111.031.251
138.633.333
111.031.251
638.889.854
510.063.255
KEWAJIBAN DAN EQUITAS
KEWAJIBAN JANGKA
PENDEK
Hutang Dagang
Hutang Pajak
CAT
7
8
2006
2005
674.000
17.741.025
422.760
964.000
18.415.025
1.386.760
500.000.000
500.000.000
SALDO LABA
120.474.829
8.676.495
Jumlah Ekuitas
620.474.829
508.676.495
638.889.845
510.063.255
Jumlah Kewajiban Jangka
Pendek
EQUITAS
Modal Saham – Modal
Dasar 5000
Saham @ Rp. 100.000
ditempat dan disetor penuh
JUMLAH KEWAJIBAN DAN
EQUITAS
PT. ESTU ARTHA LANCAR
9
22