PicsouGrid: A Grid Framework For Computational Finance
Download
Report
Transcript PicsouGrid: A Grid Framework For Computational Finance
Parallel computing on the grid:
Experiences from computational finance
Ian STOKES-REES
INRIA Sophia-Antipolis
France
1
Outline
Reminder: Grid Vision
Grid Computing Strategies
Parallel Application Development on the Grid
ProActive
PicsouGrid Project
2
Reminder: Grid Vision
Federated
Large Scale
Heterogeneous
Collaborative
Dynamic
Globally distributed
3
Strategy 1: Infrastructure-level Grid
Fire-and-forget non-interactive “tasks”
Queued individually
Run individually
Results collected and collated at a later date
Example Problems: particle physics computing:
reconstruction, Monte Carlo simulation
Example Systems: EGEE/WLCG, NGS, TerraGrid,
OSG, Grid5000
Users: have traditional computing tasks, with no
“grid” in them, and just need CPUs to run them on
4
Strategy 2: Application-level Grid
Builds on infrastructure grid resources
Provides complete application
Grid interface built into application
Or application is only way to access underlying Grid
Example Applications: eDiaMoND, MyGrid,
UNICORE
Users: Specific to the application, but are “end
users”. Typically don’t expect to “download and
install” software. Rather, use “grid application”
designed for their specific needs.
5
Strategy 3: Library-level grid
Single-system application linked-in with grid library
(semi-) transparently handles application deployment
and execution across grid resources
Developers look after “grid” issues either directly or
via Library APIs/functionality.
Varying levels of transparency in current offerings
Example Libraries: Globus, OMII services, gLite
(perhaps not yet), ProActive, MPICH-G2 (Globus
MPI), GridMPI
Users: Software developers who want to leverage
grid computing in their applications.
6
Parallel Application Development on the Grid
Big grid resources are out there (WLCG, NGS, OSG,
Grid5000)
Managed by other people (great!)
Not always possible to install individually on each
system and monitor/tweak operation (not so great!)
Remember “Grid Vision”:
Heterogeous
Dynamic
Federated
How to develop parallel algorithms/applications for
distributed, heterogenous systems?
7
Parallel Application Development on the Grid (II)
Synchronisation is difficult (obviously)
Distributed logging is difficult
Distributed debugging is really difficult
Requires a slightly different development paradigm:
Granularity of computation needs to be more coarse
Asynchrony is important to avoid blocking
Simplicity is important to aid debugging and reduce
sources of error
8
ProActive: Value Proposition
Java VM to reduce/eliminate hardware and software
heterogeneity
Forces use of Java everywhere
Doesn’t hide performance differences!
Benefit from reflection and dynamic class loading
Wrap objects in “gridified” sub-class
Provide asynchrony and multi-threading through “Active
Objects”
Futures
Wait-by-necessity
And other features auto-magically added either by developers
or at run-time via Active Object factory onto wrapped classes.
9
Active Objects
Deterministic, multi-threaded, distributed inter-object
communication, without a priori knowledge of object
deployment.
Sequential
Multithreaded
Distributed
10
Futures and Wait-by-necessity
Method calls on Active Objects:
Asynchronous
Implicit Futures as RMI result
Wait-By-Necessity:
Automatic wait upon the use of an implicit future
First-Class Futures:
Futures passed to other activities
Sending a future is not blocking
11
Creating Active Objects
MyClass obj_norm = new MyClass(<params>);
MyClass obj_act = newActive(“MyClass”, <params>);
Result r1 = obj_norm.foo(param);
Result r2 = obj_act.foo(param);
Result r3 = obj_act.bar(param);
//...
r2.bar(); //Wait-By-Necessity
In other words, very little effort by developer to introduce
distributed multi-threading into application.
12
Active Object Internals
Standard object
An active object is composed
of several objects :
1. The object being activated:
Active Object
2. A single thread
3. The queue of pending
requests
4. A set of standard Java
objects
1
Objet
Active object
Proxy
Object 1
3
2
Body
13
And lots of other nice features…
P2P interface
File sharing/distribution
Security
Typed group communication (OOSPMD)
Graphical Distributed Monitoring/Debugging
IC2D application
Timing and performance API (TimIT)
Object migration
Load balancing
Fault Tolerance/Check-pointing
Run time deployment configuration (clusters/nodes)
Component model
Plus lots of docs, APIs, tutorials, examples, etc.
14
Check it out
Web:
http://proactive.objectweb.org
Email:
[email protected]
Or, ask me more about it at the pub
BTW, group has spin-off company coming this
summer…
15
PicsouGrid: Computational Finance on the Grid
What?
Option pricing
Why?
Surprisingly, not done much in a grid domain
Not many openly available implementations (parallel
or not)
How?
ProActive (i.e. Java) on Grid5000 and other grids
(WLCG, NGS, DAS-3, …)
16
High Level Project Objectives
Framework for distributed computational finance
algorithms
Investigate grid component model
http://gridcomp.ercim.org/
Implement open source versions of parallel algorithms for
computational finance
Utilise ProActive grid middleware
Deploy and evaluate on various grid platforms
Grid5000 (France)
DAS3 (Netherlands)
EGEE (Europe)
17
Grid Emphasis
This presentation and subsequent paper focuses on
developing an architecture for parallel grid computing
with:
Multi site (5+)
Large scale (500-2000 cores)
Long term (days to weeks)
Multi-grid (2+)
Consequently, de-emphasizes computational financespecific aspects (i.e. algorithms and application
domain)
However other team members are working hard on this!
18
ProActive
http://www.objectweb.org/proactive
Java Library for Distributed Computing
Developed by INRIA Sophia Antipolis, France
(Project OASIS)
50-100 person-years R&D work invested
Provides transparent asynchronous distributed
method calls
Implemented on top of Java RMI
Fully documented (600 page manual)
Available under LGPL
Used in commercial applications
Graphical debugger
19
ProActive (II)
OO SPMD with “Active Objects”
Any Java Object can automatically be turned into an “Active
Object”
Utilises Java Reflection
“Wait by necessity” and “futures” allow method calls to
return immediately and then subsequent object access
blocks until result is ready
Objects appear local but may be deployed on any system
within ProActive environment (local system/cluster, or remote
system, cluster, or grid)
Easy Integration with Existing Systems
Extensions seamlessly support various cluster, network, and
grid environments: Globus, ssh, http(s), LSF, PBS, SGE,
EGEE, Grid5000
20
Background – Options
Option trading: financial instruments which allow buyers
to bet on future asset prices and sellers to reduce risk of
owning asset
Call option: allows holder to purchase an asset at a fixed
price in the future
Put option: allows holder to sell an asset at a fixed price in
the future
Option Pricing:
European: fixed future exercise date
American: can be exercised any time up to expiry date
Basket: prices a set of options together
Barrier: exercise depends on a certain barrier price being
reached
Uses Monte Carlo simulations
Possibility to aggregate statistical results
21
Background – PicsouGrid v1,2,3
Original versions of PicsouGrid utilised:
Grid5000
ProActive
JavaSpaces
Implemented
European Simple, Basket, and Barrier Pricing
Medium-size distributed system: 4 sites, 180 nodes
Short operational runs (5-10 minutes)
Fault Tolerance mechanisms
Achieved 90x speed-up with 140 systems
65% efficiency
Reported in e-Science 2006 (Amsterdam, Nov 2006)
A Fault Tolerant and Multi-Paradigm Grid Architecture for Time Constrained
Problems. Application to Option Pricing in Finance.
22
PicsouGrid v3 Performance
Multi-site
Peak speed-up
Performance
degradation
23
PicsouGrid Architecture
Server/Control Node
Provides User Interface
Instantiates network of Sub-Servers
Allows configuration of Simulator network
Creates “Request for Option Price” (with algorithm parameters)
Controls Sub-Servers and aggregates/reports results
Monitors Sub-Servers for failures and spawns new Sub-Servers if
necessary
Sub-Server
Acts as local site/cluster/system controller
Instantiates local Simulators
Delegates simulations in packets to Simulators
Collects results, aggregates, and returns to Server
Monitors Simulators for failures and spawns new Simulators if necessary
Simulator
Computes Monte Carlo simulations for option pricing using packets
24
PicsouGrid Deployment and Operation
option pricing request
MC simulation packet
heartbeat monitor
MC result
Client
Server
ProActive
ProActive
Worker
Sub- ProActive
Server
Worker
SubServer
reserve
workers
ProActive
DB
JavaSpace
virtual shared
memory (to v3)
25
PicsouGrid v5 Design Objectives
Multi-Grid
Grid5000
gLite/EGEE
INRIA Sophia desktop cluster
Decoupled Workers
Autonomous
Independent deployment and operation
P2P discover and acquire
Long Running, Multi-Algorithm
Create “standing” application
Augment (or reduce) P2P worker network based on demand
Computational tasks specify algorithm and parameters
26
Grid Performance Monitoring and State Machines
Grid-ified distributed applications add at least three new
layers of complexity compared to serial counterpart:
Grid interaction and management
Local cluster interaction and management
Distributed application code
Notoriously difficult to figure out what is going on where and
when it is happening:
Bottlenecks
Hot spots
Idle time
Limiting factor: CPU, storage, network?
What state is an application/task/process/system currently in?
Solution: Utilise a common state machine model for grid
applications/processes
27
Layered System
Grid
Site
Cluster
Host
Core
VM
Process
28
“Proof” of layering
What I execute on a Grid5000 Submit (UI) Node:
mysub -l nodes=30 es-bench1e6
What eventually runs on Worker Node:
/bin/sh -c /usr/lib/oar/oarexecuser.sh /tmp/OAR_59658
30 59658 istokes-rees \
/bin/bash ~/proc/fgrillon1.nancy.grid5000.fr/submit
N script-wrapper \
~/bin/script-wrapper fgrillon1.nancy.grid5000.fr \
~/es-bench1e6
Granted, this is nothing more than good system design
and separation of concerns
We are just looking at the implicit API layers of “the grid”
Universal interface: command shell, environment variables
and file system
29
Abstract Recursive Process Model
Question: Is it possible to propose a recursive process
model which can be applied at all layers?
Create – process description
Bind – process to the physical layer
Prepare – prepare for execution (software, stage in, config)
Execute – initiate process execution (enter next lower layer)
Complete – book keeping, stage out, clean up
Clear – wipe system, ready for next invocation
Each stage can be in a particular state:
Ready
Active
Done
30
Grid Process State Machine
Suspend
System
Fail
Cancel
User
Pause
Ready
Ready
Ready
Ready
Ready
Ready
Active
Active
Active
Active
Active
Active
Done
Done
Done
Done
Done
Done
Create
Bind
Prepare
Execute
Complete
Clear
Execute
process
(recurse to
next lower
level)
Tidy up system
and accounting
after completion
of process
Create
process
description
Bind to a
particular
system
Prepare
system to
execute
process
Clear process
from system
31
CREAM Job States
Create
New LCG/EGEE
apply state machine at
Grid level, LRMS level,
and task level
Suspend
Workload Management
System
Can be mapped to Grid
Process State Machine
This only shows one
level of mapping
In practice, would
Bind
Prepare
Execute
Timestamps on state
entry:
Failed
Layer.Stage.State
Cancelled
Done
Failed
32
Grid5000 Stats
9 Sites across France
21 Clusters
17 Batch systems
3138 cores
Xeons
Opterons
Itaniums
G5
Lille
Rennes
Paris-Orsay
Nancy
Lyon
Bordeaux
Grenoble
Toulouse
Sophia
33
Characteristics of Grid5000
Private network
Outbound Internet access possibly via
ssh tunnel
Access based on ssh keys
(passwordless)
Shared NFS file space at each site
Very limited data management facilities
Myrinet and Infiniband prevalent on
many clusters
RENATER French research network,
2.5 to 10 Gb/s inter-site
Focus on multi-node (and multi-site)
grid computing
Kadeploy provides mechanism for
custom system image to be loaded
before job starts
Grid5000 site
34
Deployment and Execution on Grid5000
Limited grid-wide (cross-site) job submission mechanisms
In practice, submit individually at each site
Coordinate between sites via multiple “reservation” job
submissions with same reservation window
Limited data-management/staging/configuration
Kadeploy (often too “heavy weight”)
rsync
Configuration wrapper scripts
Node count reservations “best effort”
Rule of thumb: don’t expect more than 80% of requested nodes
to be available when reservation starts
Experience shows reservation start times could be delayed 30
seconds to 10 minutes
35
Experimental Setup
European Simple call/put option price
1e6 Monte Carlo iterations
Single asset pricing reference:
treference = 67.3 seconds
AMD Opteron 2218 (64 bit) 2.6 GHz 1 MB L1 667
MHz bus (best performing core available)
Objective 1: maximize number of options priced in a
fixed time window
Objective 2: maximize speed-up efficiency:
(noptions treference)
sites(ncores_i treservation_i)
36
“Run Now” Experiment
Make immediate request for maximum number of nodes on all
Grid5000 clusters
Price one option per acquired core
Not really fair: Grid5000 is not a production grid
Submit to 15 clusters
8 clusters at 6 sites completed tasks within 6 hours
Remainder either failed or hadn’t started 24 hours later
1272 cores utilised
85 core-hours occupied
This is the total amount of time the tasks “held” a particular core:
idle time + execution time
Objective 1(alt): 1272 options priced in “8 minute window”
Objective 2: 1272 options 67.3 s / 85 hr = 28% efficient
Discovered various grid issues (e.g. NTP, rsync)
37
Queuing
Queuing
Queuing
Queuing
Execution
Result stage-out
38
When everything is working
39
NTP Problems (Time Sync)
40
Unexplained slow downs
(homogeneous cluster)
41
Erratic node/core startup
42
Coordinated Start with Reservation
Reservation made 12+ hours in advance
Confirmed no other reservations for time slot
Start time at “low utilisation” point of 6:05am
5 minutes provided for system restarts and Kadeploy re-imaging after
end of reservations going to 6am
Submitted to 12 clusters, at 8 sites
9 clusters at 7 sites ran successfully
894 cores utilised
31.3 core-hours occupied
No cluster reservation started “on time”
Start time delays of 20s to 5.5 minutes
Illustrates difficulty of cross-site coordinated parallel processing
Objective 1: 894 options priced in 9.5 minute window
Objective 2: 894 options 67.3 s / 31.3 hr = 53.4% efficient
Still problems (heterogeneous clusters, NTP, rsync)
43
44
Intra-node timing variations
45
Core Timeline (detail)
May seem like splitting hairs, but this is important for parallel
algorithms with regular communication and synchronisation
points
Also, to know where latencies/inefficiencies are introduced
46
Heterogeneous clusters
(hyper threading on)
47
Mis-configured timezone
48
Overall cluster benchmarks
49
Parallelism
American option pricing with “floating” exercise date
is much more difficult to calculate
Two algorithms with good opportunities for
parallelism are available:
Longstaff-Schwartz (2001)
Ibanez-Zapetero (2002)
Interesting to see what speed up can be achieved by
parallel implementation
Interested in possibility of cross-site parallel
computation utilising ProActive
50
Longstaff Schwartz
51
Ibanez-Zapetero
52
Multi-Grids
Very interested in experimenting with Multi-Grid environment:
Grid5000
gLite/EGEE
DAS3
Local cluster/desktop-grid/p2p network
ProActive deploys on LCG (gLite/EGEE)
Other ProActive applications deployed and run successfully
VO problems in Feb/March meant PicsouGrid could not be run on
LCG – so no results for ISGC!
Investigate use of HTTP-based task pools to bridge “grids”
53
Future for PicsouGrid
Many more computational finance algorithms have
already been developed and need to be similarly
benchmarked:
Barrier, Basket
American (Longstaff-Schwartz and Ibanez-Zapatero)
“Continuous” operation of option pricing, rather than
“one-shot”
Incorporate dynamic node availability
Improve modularization/componentization of finance
algorithms
54
Summary of Observations
Deploying parallel applications in a grid environment
continues to be a challenging problem
Heterogeneity in a grid is pervasive and still hard to
deal with
Understanding performance issues, hot spots,
bottlenecks, wasted idle time, and synchronisation
points can be aided by a grid process model
Middleware really is critical: gLite, LRMS, OAR,
ProActive, etc. need to provide end users and
application developers with reliable, consistent, and
easy to use interface to “the grid”
55
Thank you
Questions?
https://gforge.inria.fr/projects/picsougrid/
[email protected]
56
57