Transcript Document

Operations Working Group
Information Management
Workshop
INSARAG Team Leader Meeting
Brisbane, Australia
25/03/2012
Assessment, Search and Coordination
Methodologies
Coordination
Structure
ASR Levels
Information
Management
Revised Coordination Structure
LEMA
Virtual OSOCC
RDC
OSOCC
UC
Sector Coord.
USAR
team
USAR
team
USA
R
team
Sector Coord.
USAR
team
USAR
team
Sector Coord.
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
Assessment, Search and Rescue
Levels
Level
Description
0
Pre Deployment Research of the Affected Area
1
Wide Area Assessment
2
Sector Assessment
3
Primary Search and Rescue
4
Secondary Search and Rescue
5
Full Coverage Search and Rescue
Scope of workshop
(1) Information Management tools
> for Management
> for Assessment, Search and Rescue
> for Reporting
(2) Virtual OSOCC Modification proposal
(3) Social media
Overview
Why do we need Information Management?
To improve field coordination in USAR
operations to obtain efficiency and
effectiveness
What are the issues?
Larger, more complex and frequent USAR
operations result in increased workloads
and loss of situational awareness
Who needs Information Management?
All stakeholders of the INSARAG community
Information Management concept
Who
IM Tools
Collection &
Processing
-LEMA
-USAR Teams
-Social Media
-Forms
-Checklists
-Guidelines
-VO
Analysis &
Integration
-USAR Coordination
Cell
-Sector
Coordination
-Guidelines
-IM platforms
-VO
-USAR Coordination
Cell
-Sector
Coordination
-USAR Teams
-Forms
-Checklists
-VO
Briefing &
Assigment
Approach for tools development
• Review of complete mission cycle
• All tools were developed considering a
full integration with:
•
•
•
•
•
•
•
•
Coordination methodology
Worksite identification code
Sector identification code
USAR teams standard identification
Coordinates format standard
Time format standard
Date format standard
Detailed instructions on how to fill
forms (pending)
Tools developed for three areas
1
2
3
• Management
• Assessment, Search
and Rescue Levels
• Report
IM tools for Management
12hrs
Mobilization
24hrs
48hrs
Operations
72hrs
96hrs
Demobilization
Virtual OSOCC
LEMA
RDC
OSOCC
UC
Sector Coord.
USAR
team
USA
R
team
USA
R
team
USAR
team
Sector Coord.
Sector Coord.
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
IM tools for Management
M-1
Team
Fact Sheet
12hrs
Mobilization
M-3
RDC Briefing
Handout
Form
24hrs
48hrs
Operations
72hrs
96hrs
Demobilization
Virtual OSOCC
LEMA
RDC
OSOCC
UC
Sector Coord.
USAR
team
USAR
team
USA
R
team
USAR
team
USAR
team
Sector Coord.
Sector Coord.
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
IM tools for Management
M-1
RDC
Planning
Guideline
12hrs
M-3
RDC Briefing
Handout
Form
24hrs
Operations
Mobilization
M-3
OSOCC/
UCC
Planning
Guideline
48hrs
M-4
OSOCC-LEMA
Briefing
Guideline
72hrs
96hrs
Demobilization
Virtual OSOCC
LEMA
RDC
OSOCC
UC
Sector Coord.
USAR
team
USAR
team
USA
R
team
USAR
team
USAR
team
Sector Coord.
Sector Coord.
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
IM tools for Assessment, Search & Rescue
12hrs
Mobilization
24hrs
48hrs
Operations
72hrs
96hrs
Demobilization
Virtual OSOCC
LEMA
RDC
OSOCC
UC
Sector Coord.
USAR
team
USAR
team
USA
R
team
USAR
team
Sector Coord.
Sector Coord.
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
IM tools for Assessment, Search & Rescue
O-1
Country
Information
Template
O2
Wide
Area
Assessment
12hrs
Mobilization
24hrs
48hrs
Operations
72hrs
96hrs
Demobilization
Virtual OSOCC
LEMA
RDC
OSOCC
UC
Sector Coord.
USAR
team
USAR
team
USA
R
team
USAR
team
USAR
team
Sector Coord.
USA
R
team
USAR
team
Sector Coord.
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
IM tools for Assessment, Search & Rescue
O-1
Country
Information
Template
O2
Wide
Area
Assessment
12hrs
O-3
Assignment
Briefing
Package
24hrs
Mobilization
O-5
Sector
Assessment
48hrs
Operations
O-6
Sector
Assessment
Field Form
72hrs
96hrs
Demobilization
Virtual OSOCC
LEMA
RDC
OSOCC
UC
Sector Coord.
USAR
team
USAR
team
USA
R
team
USAR
team
USAR
team
Sector Coord.
USA
R
team
USAR
team
Sector Coord.
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR Teams only need to fill 3 types of forms
during Search & Rescue operations
IM tools for Reporting
12hrs
Mobilization
24hrs
48hrs
Operations
72hrs
96hrs
Demobilization
OCHA
Virtual OSOCC
LEMA
RDC
OSOCC
UC
Sector Coord.
USAR
team
USAR
team
USA
R
team
USAR
team
USAR
team
Sector Coord.
Sector Coord.
USA
R
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
USAR
team
Virtual OSOCC Modification
Coordination with GDACS Working Group:
-OWG requested some additional features
>Improvement of USAR ops usability
-Improvement for visibility of request status of
international assistance status
-Separate page/subtitle for USAR ops.
>In progress
-Automatic analysis of spreadsheets
-Column sort of arrival/departure information
-Authorization
Social Media
-Operational guidance note on processing
information from social media
-First draft of information collection guideline
for Social Media (by Gisli Olafsson)
-Contents
(1)Goal
(2)Objective
(3)Assumption
(4)Concept
-Challenges
Feedback required
Information Management tools developed
will be uploaded to a Discussion Forum in
the Virtual OSOCC for further discussion
and feedback.
THANK YOU!
Operations Working Group
Information Management
Workshop
INSARAG Team Leader Meeting
Brisbane, Australia
25/03/2012
IM tools for Assessment, Search & Rescue
12hrs
Mobilization
24hrs
48hrs
Operations
72hrs
96hrs
Demobilization