Review of deliverables
Three levels of deliverables:
Level 3: Deliverable at Tasks
Level 2: Deliverable at Design Study
Level 1: Deliverable at Project
Level 0: Deliverable at Board Level
We present progress in terms of the Level 0 deliverables
2nd SKADS Workshop 10-11 October 2007
André van Es
DS-1
ASTRON
University of
Manchester
DS-2
Rijks Universiteit
Groningen
ASTRON
INAF-IRA
MPIfR
University of
Manchester
ASTRON
Observatoire de
Paris
INAF-IRA
ASTRON
ASTRON
CSIRO
Oxford
University of
Manchester
Observatoire de Paris
Cambridge
University of Melbourne
ASTRON
Natal University
JIVE
University of Leeds
CSIRO
University of
Cambridge
Swinburne
Chalmers
INAF-IRA
DS-5
CSIRO
Leiden Observatory
DS-6
DS-4
University of
Manchester
Universidad de Valencia
Observatoire
de Paris
DS-3
INAF-IRA
University of
Oxford
Cambridge
University
Observatoire de
Paris
PRAO-LPI
University of Glasgow
University of Adelaide
National
Research
Foundation
FG-IGN
University of
Oxford
CSIRO
National
Research
Council
University of
Cambridge
University of
Orléans
CNRS
OMMIR
Observatoire de
Paris
JIVE
INAF-IRA
MPIfR
Oxford
University
CSIRO
National
Research
Foundation
UMK
University of
Cambridge
Univ. Sydney
DS-7:
University of
Manchester
University of Manchester, Observatoire de Paris
2nd SKADS Workshop 10-11 October 2007
OMMIC
André van Es
Review on deliverables: DS-1
DS1
DS1
DS1
DS1
DS1
Planned
Deliverabl (in
e/
months)
Milestone
No
1.
1-oct-05
2.
1-oct-05
3
1-Nov-05
DS1
DS1
DS1
DS1
DS1
DS1
4
5
6
7
8
9
1-Apr-05
1-Nov-05
1-Apr-06
1-Apr-07
1-Apr-08
1-Apr-09
Achieved
(in
months)
Nov-05
1-jan-06
ongoing
ongoing
30-June06
1-Oct-05
1-Feb-06
4-Sep-06
10-Oct-07
Sep 08
Sep 09
Deliverable/Milestone Name
Organize kick-off
Implement adequate management tools
Continuous coordination and management
Continuous assessment and control
Document on outreach policy
Establish web-page
Document on IPR Policy
SKADS international workshop 2006
SKADS international workshop 2007
SKADS international workshop 2008
SKADS international workshop 2009
2nd SKADS Workshop 10-11 October 2007
André van Es
2nd SKADS Workshop 10-11 October 2007
André van Es
Review on deliverables: DS-2
Nominal
Completion
Date
DS2
1
1-jun-07
DS2
DS2
2
3
1-dec-08
1-jul-08
DS2
4
1-mei-09
Actual/
Planned
Milestone
completion
Date
1-jun-07 Conclusion on Science Drivers
Conclusion on Year in the Life for different SKA
1-dec-08 realizations
1-jul-08 Optimised Configuration for the SKA
Demonstration of new calibration and imaging
1-mei-09 Techniques
2nd SKADS Workshop 10-11 October 2007
André van Es
A Report and Proceedings...
2nd SKADS Workshop 10-11 October 2007
André van Es
Review on deliverables: DS-3
DS3
DS3
DS3
DS3
DS3
DS3
DS3
DS3
1
2
3
4
5
6
7
8
30-jun-08
31-dec-08
30-mei-09
1-jul-07
30-mei-09
30-jun-08
31-dec-08
30-jun-08
Actual/
Planned
completion
Date
31-dec-08
31-dec-08
30-mei-09
1-jul-07
30-mei-09
30-jun-08
31-dec-08
30-jun-08
DS3
DS3
DS3
DS3
9
10
11
12
30-dec-05
30-jun-08
30-dec-07
30-jun-08
30-dec-05
30-jun-08
30-dec-07
30-jun-08
Nominal
Completion
Date
Milestone
Delivery of prototype phase transfer link
Development cost of model for the network
Report on technology roadmapping and costing
Delivery of framework for functional simulator
Report on network achtitecture
Overview reports on site selection
Final reports on site selection
Reports on SKA for the user
Model driven architecture specification of control
and data processing
Report MDA constructs, interfaces and platforms
report on scalable platform specific composition
MDA assessment and scalability recommendations
2nd SKADS Workshop 10-11 October 2007
André van Es
SKADS Design & Costing
Paper (SKA Memo 93)
2nd SKADS Workshop 10-11 October 2007
André van Es
Review on deliverables: DS-4
Nominal
Completion
Date
DS4
DS4
1
2
30-dec-06
30-dec-07
DS4
3
1-jul-07
DS4
DS4
DS4
DS4
4
5
6
7
1-jul-06
1-jul-07
31-okt-07
1-mrt-08
DS4
8
1-jul-07
DS4
DS4
9
10
30-dec-06
29-dec-08
DS4
11
30-jun-09
Planned
Completion
Milestone
done
SiGe band pass filter using PIC technology prototype
31-dec-08 ADC performance evaluation
1-jul-08 Hybrid LNA first devices
1-jul-08
1-jul-08
1-mrt-08
1-jul-08
Inventory of RFI mitigation techniques and applicability to
SKA
Evaluation of impact of moving interference sources on SKA
Characterised antenna element
antenna element with integrated MMIC prototype
1-mrt-08 Simulated Digital beamformer for 2-PAD
done
Prototype low cost SiGe analogue beamformer
2-feb-09 Prototype complete 2-PAD digital tile
30-jun-09
Final reports on semiconductor technologies, RFI mitigation
strategies, antenna element design, digital beamformer design
2-PAD performance (T1-T6)
2nd SKADS Workshop 10-11 October 2007
André van Es
Prototype of Low Cost SiGe
Beamformer
2nd SKADS Workshop 10-11 October 2007
André van Es
Review on deliverables: DS-5
Nominal
Completion
Date
Planned
Completion
DS5
DS5
1
2
30-dec-05
1-mrt-06
30-dec-05
15 May-06
DS5
3
1-jul-06
1-jul-06
DS5
DS5
DS5
4
5
6
1-mrt-07
31-mei-08
1-jan-09
1-okt-07
1-sept-2008
1-jan-2009
Milestone
Completion of System Requirements
Design Review of First Tile
Delivery of first manufactured tile
completion of 10 tile system
completion of first 100 tiles
completion of m anufacturing of all tiles
2nd SKADS Workshop 10-11 October 2007
André van Es
EMBRACE 10 tile prototype
2nd SKADS Workshop 10-11 October 2007
André van Es
Review on deliverables: DS-5
Nominal
Completion
Date
DS5
DS5
1
2
30-dec-05
1-mrt-06
DS5
3
1-jul-06
DS5
DS5
DS5
4
5
6
1-mrt-07
31-mei-08
1-jan-09
Planned
Completion
Milestone
30-dec-05 Completion of System Requirements
15 May-06 Design Review of First Tile
1-jul-06 Delivery of first manufactured tile
1-okt-07 completion of 10 tile system
1-sept-2008 completion of first 100 tiles
1-jan-2009 completion of manufacturing of all tiles
2nd SKADS Workshop 10-11 October 2007
André van Es
Review on deliverables: DS-6
Nominal
Completion
Date
Planned
Completion
DS6
DS6
1
2
1-jul-06
30-apr-07
done
done
DS6
3
31-aug-08
31-aug-08
DS6
DS6
DS6
DS6
DS6
4
5
6
7
8
30-sep-08
30-sep-08
30-sep-08
1-jul-08
30-sep-08
30-sep-08
30-sep-08
30-sep-08
1-jul-08
30-sep-08
Milestone
Design Report on Analog Optical link
Design Report on Analog and digital optical link
Report on data handling for large telescopes
Wide band high dynamic range A/D FX correlator, small
prototype
Software beamforming and multibeaming on BEST-x
Algorithms for RFI mitigation
Calibration methods for large array
report on High sensitivity astronomical tests
2nd SKADS Workshop 10-11 October 2007
André van Es
BEST Report on optical links
2nd SKADS Workshop 10-11 October 2007
André van Es
Review on deliverables: DS-7
Task number
Deliverable Deliverable Name
No
Planned
(in months)
Achieved
(in months)
DS7-T1
1
19
19
DS7-T1
2
22
22
DS7-T1
3
25
25
DS7-T1
4
19
19
DS7-T1
5
22
22
DS7-T1
6
25
25
DS7-T1
7
19
19
DS7-T1
8
22
22
DS7-T1
9
24
25
DS7-T1
10
24
25
DS7-T1
11
24
25
SKADS Quarterly
Report Q4/2006
SKADS Quarterly
Report Q1/2007
SKADS Quarterly
Report Q3/2007
SKADS Quarterly
Report Q4/2007
SKADS Quarterly
Report Q1/2008
SKADS Quarterly
Report Q3/2008
SKADS Quarterly
Report Q4/2008
SKADS Quarterly
Report Q1/2009
2007 Annual
Report to
International SKA
Project Office
2008 Annual
Report to
International SKA
Project Office
2009 Annual
Report to
International SKA
Project Office
2nd SKADS Workshop 10-11 October 2007
André van Es
A Quarterly Report...
2nd SKADS Workshop 10-11 October 2007
André van Es
Updated Plan
Prior to 2nd Annual Report project planning was updated
All Design Studies submitted new milestone/deliverable
table
New milestone dates were discussed and agreed with DS
leaders
SKADS on track to finish on 30th June 2009
2nd SKADS Workshop 10-11 October 2007
André van Es
Deliverables/Milestones planned
(update 2nd annual report)
Level 0 Deliverables
Tot. Nr. of Deliverables
60
50
40
30
20
10
Planned (DoW)
Current Plan
0
0,5
1
1,5
2
2,5
3
3,5
4
Time
2nd SKADS Workshop 10-11 October 2007
André van Es
Next 18 months
(major milestone for each DS)
DS2: Final Report on SKA configurations
DS 3:
– Implementation of Cost and Functional simulator tool
– Selection of networking and computing technologies
DS 4: Completion of 2-PAD design
DS 5: Build and first testing of EMBRACE at Westerbork
and Nancay (100 tiles)
DS 6: BEST demonstrating beamforming and Hl sensitivity
astronomical tests
DS 8 : First iteration of Overall System Design and Project
plan
2nd SKADS Workshop 10-11 October 2007
André van Es
Review on deliverables: DS 8
Design Study 8 produces the major deliverables of the
project (the focal and cohering point of SKADS):
1. Overall System Design
2. Preliminary SKA Plan
3. White Paper for the ISSC
It is the collection of all activities and will show and
establish the direction towards the SKA
2nd SKADS Workshop 10-11 October 2007
André van Es