Mike Adams Test Well - Oilfield Services

Download Report

Transcript Mike Adams Test Well - Oilfield Services

Mike Adams Test Well
Located in Carrollton, Texas,
the Mike Adams Test Well is
designed to be safe,
operationally efficient, and
best in class for downhole
testing of tools for both
vertical and horizontal
applications.
© 2008 Halliburton. All Rights Reserved.
Case Histories
 Challenge
• A major customer needed a means
to test a SmartWell® completion
prior to implementation on a
deepwater project in west Africa.
 Halliburton Solution
• The Mike Adams Test Well simplified
the complexity of the completion
indicating the system would work.
 Benefits
• Provided opportunity for successful
collaboration with customer and
third-party vendors
• Documentation of successful
installation techniques
• Improved deployment techniques
through special installation tools
© 2008 Halliburton. All Rights Reserved.
Case Histories
 Challenge
• Major UK customer required reservoir
management of two zones while maximizing
recovery
 Halliburton Solution
• Well test included an Intermediate Reservoir
Isolation Assembly (IRIA) and an upper
SmartWell® completion system
• IRIA included a VBA packer, 20 ft. PBR, Liquid
Spring device, Twin-Flow Absolute Isolation
System and FS fluid loss tools
 Benefits
• Design modifications for improved handling
methods of long assemblies
• Qualification of IRIA and SmartWell completion
systems to anticipated well conditions
• Validated coiled tubing contingency operations
© 2008 Halliburton. All Rights Reserved.
Case Histories
 Challenge
• Develop a selective completion
system for a major operator in west
Africa to control production from
multiple zones
 Halliburton Solution
• Qualify selective completion system
utilizing WellDynamics infinitely
variable control valves and FS valve
• Qualify contingency operations using
new downhole tractor technology for
tool manipulation
 Benefits
• Optimized CAPEX
• Documented lessons learned and
employee training
© 2008 Halliburton. All Rights Reserved.
Case Histories



Challenge
• Major customer operating in China
wanted to perform four qualification
tests prior to running installations in
their well.
Halliburton Solution
• Performed multiple well tests:
• Verified maximum flow rates for
jetting PoroMax® screens with the
Pulsonix® wash tool
• Qualified functionality and
compatibility of the modified ROC
tool and 13 Cr seal bore
• Functionality test of VersaFlex® liner
hanger system
• Functionality of upper completion
with deep-set SCSSV, IB running
tool, and Ratch-Latch™ System
Benefits
• Improved operational efficiency with no
down time
PoroMax is a registered trademark of Purolator Facet, Inc.
© 2008 Halliburton. All Rights Reserved.
Case Histories
 Challenge
• A major operator tasked Halliburton with the
development, prototype manufacture, and
full-scale system well test of our Enhanced
Single-Trip Multizone (ESTMZ™) system
 Halliburton Solution
• Carrollton Technology and Manufacturing
worked together on an extremely accelerated
schedule to deliver tools
• Successful internal system well test at Mike
Adams Test Well
 Benefits
• Customer recognized Halliburton as
committed to safety (both on the rig and
manufacturing facility)
• Customer views Halliburton to be an expert
in deepwater solutions and an industry
leader in frac tools
© 2008 Halliburton. All Rights Reserved.
Mike Adams Test Well

Features
• Vertical and horizontal wellbore
testing (7400 ft TMD)
• 5000 psi wellhead rating
• Variety of casing configurations
available

Benefits
• Improved job reliability and
reduced operational risks in a lowcost environment
• Results include: Lessons learned,
job process improvements,
training, contingency plans, tool
compatibility checks, and
completion functionality validation
© 2008 Halliburton. All Rights Reserved.
Mike Adams Test Well
For more information
about the Halliburton
Engineering Test Facilities,
please contact your local
Halliburton representative
or email us at
[email protected].
© 2008 Halliburton. All Rights Reserved.