Transcript FY01 - VLHC
f FARDOG 04JAN01 • Discussion of FY01 Budget and Goals for RF Structures D. Finley / Fermilab FARDOG / January 4, 2001 1 f FY01 LC R&D Goals / Technical Division • RF Structure Factory • Make first Fermilab Xband structure • • • • • • • • • • • Have made, now send, 20 disks to SLAC • • • Need expertise from BD and TD Using expertise from INR Collaboration (see later slide) Now have BD Network Analyzer from BD (Thanks, John) Need a second NA bySEP01 (Peter?) Full Size Furnace by SEP01 (we hope) Baby Furnace (~120K$) by APR01 • • • Finish four prototypes Measure with mostly existing equipment Take over some motion control development Understand beam alignment requirements First, we do RF QA on them SLAC provides couplers etc and assembles into a complete structure “Same as” SLAC / Robertson model Make two entire “20 cell” structures • aka “1st Fermilab Xband structures” To get on SLAC “High Power Testing” List, need to “Show me the structure!” IB5 CDR w/ FESS • • • Magnets • • By about mid-March01 or so (we hope) (See below also) Get first furnace operating • • Collaboration High Gradient Tests Occupy IB4 SW Corner Finish RF QC Lab • • • $25K from RAT, $25K from TD Assembly Line for beam line units Not necessarily “NLC Project” building … could instead be for additional space needed for ongoing TD activities D. Finley / Fermilab FARDOG / January 4, 2001 2 f Industrial Building 4 (IB4) Notes: 1. Southwest Corner is lower right of picture 2. RF structure work - Uses all of SW corner (2 clean rooms, rf lab, work area, furnace area) - Shares QC Laboratory for mechanical QC - Shares Machine Shop 3. This is not an optimum arrangement for the work flow for making structures 4. “Beam Line Unit” Assembly area would occupy most (if not all) of IB4 D. Finley / Fermilab FARDOG / January 4, 2001 3 f IB4 SW Corner Copper parts go in … structures come out Note: Furnace area is large enough for baby furnace … full size furnace is mounted over Clean Room B (the one on the left) D. Finley / Fermilab FARDOG / January 4, 2001 4 f INR Collaboration (Troitsk, Russia) • Reference: Finley to Yarba 12/20/00 email “INR and TD” • Item 2: In support of understanding structure vacuum • • Item 1: In support of the RF QC Lab • Gennady Romanov (TD Guest) coordinating the setting up of the RF QC Lab • • What is to be done in IB4? • • • Short stack and full length structure measurements plunger and bead pull techniques • • • • • How fast does the gas move? Which direction? How long does it take to pump down so that processing can continue? FY01 New Guests • • • • with Ding Sun (BD), Tug Arkan, Brian Smith, Evgueni Borissov(TD) • To be done at INR Develop realistic and useful computer codes Start with 1.8 meter RDDS as specific example at appropriate level of detail Example: Model the time development of the vacuum after a discharge and outgassing Gonin: rf calculations to help understand measurements Khabibulin: improve throughput (aka automation) 3rd person: Brazing Small piece of hardware from INR D. Finley / Fermilab FARDOG / January 4, 2001 5 f FY01 LC R&D Goals for TD / Background • • Top Down • • $195K Salaries, $70K M&S $540K Salaries, $495K M&S • • • • Make Structures so that SLAC can do High Gradient tests on them Integrate into ETF • $735K Salaries, $565K M&S Caution: November 2000 obligations already close to linear budget for FY01 … Develop funding “understandings” • Integrate into SLAC tests • Sum • • • RF Structures (RAT) • • (see slide from LaDaune T.) Update multi-year plan Magnets (MAT) • • • Budget $1.3M ~100K$ TD Equipment for Baby Furnace “Small%” FTEs not charged to LC R&D? • Have made no changes in TD reporting yet, small changes might be needed. ~$75K TD Equipment for 2nd Network Analyzer ~$600K Full Size Furnace - NIU funds • • Will force 1 structure / month issue Will force “beam line unit” issues into the open Integrate into Industry • • Need to determine appropriate strategy for scaling up industrialization issues Need to determine sensible role for SBIRs Note on throughput: R&D needs about 1 structure / month Project production rate is ~ 6 structures / day D. Finley / Fermilab FARDOG / January 4, 2001 6 f TD NLC R&D Budget Report November 2000 17% of Year Passed YTD Cost Cat Budget Actual Oct Nov Dec Jan 1YA PERSONNEL COSTS 735.0 106.7 50.0 56.7 1YB MATERIALS & SERVICES 565.0 71.4 32.7 38.7 Total: 1,300.0 178.1 82.7 95.4 0.0 0.0 Code Cost Cat Budget YTD Actual TD-E&F NLC Magnet R&D 4MAT 1YA PERSONNEL COSTS195.0 1YB MATERIALS & SERVICES 70.0 Total: 265.0 Oct Nov 30.0 20.9 50.9 15.8 15.6 31.4 14.2 5.3 19.5 TD-E&F NLC Structures R&D 4RAT 1YA PERSONNEL COSTS540.0 76.7 1YB MATERIALS & SERVICES 495.0 50.5 Total: 1,035.0 127.2 34.2 17.1 51.3 42.5 33.4 75.9 Dec 0.0 0.0 Jan 0.0 0.0 Feb Mar 0.0 Feb 0.0 0.0 Apr 0.0 Mar 0.0 0.0 May 0.0 Apr 0.0 0.0 0.0 Open Comm Open Open Cost + Chg Prior Comm Comm in Comm Jul Aug Sep Year Curr Mo Prev Mo (% Spent) 0.0 0.0 15% 59.2 74.9 61.0 15% 0.0 0.0 0.0 59.2 74.9 61.0 15% Jun Open Open Comm Comm Prior Curr Year Mo Jun 0.0 May 0.0 0.0 Jul 0.0 0.0 D. Finley / Fermilab FARDOG / January 4, 2001 0.0 0.0 Aug 0.0 0.0 Sep Open Comm Prev Mo Cost + Chg in Comm (% Spent) 0.0 0.0 0.0 4.6 4.6 2.2 2.2 15% 36% 21% 0.0 59.2 59.2 70.4 70.4 58.8 58.8 14% 12% 13% 7 FY01 TD LC R&D FTEs Projected K$ Actual K$ FTEs by month 10 8 6 FTE Projection 4 Actual FTE 2 Month 01 pSe 1 M ay -0 1 Ju l-0 1 -0 n- 01 0 Ja ov -0 N Se p- 00 Au g01 Ju n01 Ap r-0 1 Fe b01 0 De c00 -0 0 800 700 600 500 400 300 200 100 0 O ct YTD K$ FY01 TD LC R&D Salaries M ar f FY01 TD LC R&D FTEs and Salaries Month Plan on FY01 Salaries = $735K Start with 5.42 FTE at FY00 End Plan to add ~ 0.3 FTE / month through August 2001 Have 8.72 FTE at FY01 End D. Finley / Fermilab FARDOG / January 4, 2001 8 f Preliminary FY01 TD LC R&D Projection M&S by month FY01 TD LC R&D Projection beyond Nov00 160.0 140.0 120.0 100.0 80.0 60.0 40.0 20.0 0.0 4.0 Assumed MAT Monthly Average without items below 15.0 Assumed RAT Monthly Average without items below Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 120.0 RAT Feb Baby Furnace 75.0 RAT Jun Network Analyzer 25.0 RAT Apr FESS CDR 5 is done (put all costs here) Month • 45.0 RAT Sep Contingency including travel 30.0 MAT Sep Contingency including travel Note: Oct Nov are history D. Finley / Fermilab FARDOG / January 4, 2001 9 f FY01 LC R&D … Waiting in the Wings • • • • • • • • • • … at least not under TD leadership ~ 0.5 FTE Beam Line Unit Design • • • • • • • Unit = “rf structures and a magnet” on a support girder Unit is “repeated” throughout linac Need final structure design (Q: “Are there three or four per unit?) “Generic design” for support girder is not appropriate ~1 FTE Parametric Study on Bonding • $100K M&S estimate “Windowtron” = single cell (or less) rf breakdown studies led by SLAC Grew out of breakdown workshop Miss opportunity for more global involvement (CERN, Cornell, Fermilab) Moderately Damped Design • • • Windowtron R&D $75K to $150K M&S estimate initiated in FY00 when RDDS structure design was thought to be final ...but is actually premature at this time “Parametric Study” = systematically map out costs of producing disks vs required performance of bond joints but will need to be done to determine a defensible cost estimate of the full linac … once a structure design has been determined settle the issue of brazing vs. bonding Equipment, equipment, equipment ... • • optical measurements (>~ $200K) laser interferometer for magnet measurements (~$150K) D. Finley / Fermilab FARDOG / January 4, 2001 10