South Hook's Presentation by AbdulRahman Essa Al Mannai at

Download Report

Transcript South Hook's Presentation by AbdulRahman Essa Al Mannai at

Industry LNG Seminar
Institute of Mechanical Engineers
11 February 2009
Abdulrahman Al Mannai
Commercial Manager
Qatargas II Supply Chain
Gas
North Field Gas Production
LNG
Onshore Liquefaction (2*7.8 MTPA Trains)
LNG
Shipping. Q-Flex (~215 km3), Q-Max (~265 km3)
Gas to
Pipeline
Regasification. South Hook can process up to 15.6 MTPA lean LNG (21 bcma gas)
Background – South Hook Terminal
South Hook LNG Terminal Company Ltd is a joint venture between subsidiaries of:
(67.5%)
(24.15%)
(8.35%)
South Hook Facilities designed and constructed in two phases


Each Phase with an annual gas redelivery capability of ~10.5 bcma
To match the capacity of the Qatargas II upstream facilities
SHLNG has been granted exemption from regulated Third Party Access for both phases of capacity and a
duration of 25 years from commercial start date.

Enabled South Hook Gas to purchase all primary capacity for QGII LNG
Industry LNG Seminar – Institute of Mechanical Engineers
3
Commercial Relationships
Qatar
United Kingdom
GAS
LNG
ExxonMobil Gas
Marketing Europe Limited
LNG
GAS
Capacity Timeline
Daily
Interruptible
Capacity
“UIOLI” SHB
Third Party Services
Base
Firm
Redelivery
Capacity
SHG purchased
All Terminal
Firm Capacity
Base
Firm
Redelivery
Capacity
Capacity Sale
Terminal
Operator
Services
South Hook
Bundles
(SHB)
QGII
D-14
SHLNG
SHG
Industry LNG Seminar – Institute of Mechanical Engineers
5
SHG &
Additional
Users
Additional
Users
SHG &
Additional
Users
South Hook Bundles
Berthing slot date
Temporary LNG tank storage space
Redelivery capacity
LNG quality
SHBs can be advertised for re-sale on our
Electronic Bulletin Board
time
capacity




space
Secondary capacity sales will be in the form of
South Hook Bundles (“SHB”) that will specify
time
Industry LNG Seminar – Institute of Mechanical Engineers
6
Terminal Operator “UIOLI” Services
“UIOLI” SHB example 2
LNG Space
LNG Space
“UIOLI” SHB example 1
time
time
Berthing
Berthing
Redelivery profile
•
•
•
•
Advertised on the website 14 days ahead of a berthing slot
Auctioned over 4 days ending 10 days before the berthing slot.
Gas redelivered over a 7 day period
Users apply via EBB.
Industry LNG Seminar – Institute of Mechanical Engineers
7
Redelivery profile
Terminal Operator “UIOLI” Services (cont.)
•
•
•
•
Terminal Operator facilitates the optimisation of unused redelivery capacity
Users allowed to nominate above their firm capacity
Unused redelivery capacity on the day will be recycled and allocated as interruptible
capacity for other Users
Allocation is pro rata to firm capacity rights
Unused capacity
Available
Capacity
Interruptible
Capacity
Aggregate nominations
time
Industry LNG Seminar – Institute of Mechanical Engineers
8
Commissioning Schedule
The first commissioning cargo “Tembek” has left the Arabian Gulf en route for
Milford Haven.
Commissioning is an intensive activity, commercial operations (Phase 1) is
currently forecast to commence in the second half of April


Sendout is under the control of the Terminal Operator during this period
SHLNG will provide schedule updates on its website
Commissioning process ongoing
Industry LNG Seminar – Institute of Mechanical Engineers
9
Application To Become a User
A party will need to apply and be accepted as a User of the terminal
before it can hold capacity.
A Confidentiality Agreement will need to be signed before all other
relevant documents are released
SHLNG to publish the steps required to become a User on its website
during March 2009
www.southhooklng.com
Parties interested in the products and services available from SHG
should contact Donovan Waite, Head of Trading and Business
Development
www.southhookgas.com
Industry LNG Seminar – Institute of Mechanical Engineers
10