ITEC 3010 “Systems Analysis and Design, I”

LECTURE 2: Approaches to System Development

[

Prof. Peter Khaiter

] 1

Lecture Outline

          

Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models Selecting the appropriate model Methodologies of the SDLC Traditional Approach to SDLC Information Engineering Approach to SDLC Object-Oriented Approach to SDLC Rapid Application Development Current trends in the SDLC CASE Tools

2

Systems Development Life Cycle

 Systems development life cycle (SDLC)  Provides

overall framework

systems development process for managing Two main approaches to SDLC

Predictive approach

– assumes project can be planned out in advance 

Adaptive approach

assumes project cannot be planned out in advance – more flexible, All projects use some variation of SDLC 3

Predictive vs. Adaptive Approach to the SDLC

4

Phases in SDLC

    

Project planning

feasibility, plan schedule, obtain approval for project – initiate, ensure

Analysis

– understand business needs and processing requirements

Design

– define solution system based on requirements and analysis decisions

Implementation

– construct, test, train users, and install new system

Support

– keep system running and improve 5

Systems Development Life Cycle

6

Systems Life Cycle

7

Activities of Each SDLC Phase

Predictive or adaptive approach use SDLC

Activities of each “phase” are similar

Phases are not always sequential

Phases can overlap

Activities across phases can be done within an iteration

8

Activities of Project Planning

 Define business problem and scope  Produce detailed project schedule  Confirm project feasibility Economic, organizational, technical, resource, and schedule  Staff the project (resource management)  Launch project  official announcement 9

Analysis Activities

 Gather information to learn problem domain  Define system requirements  Build prototypes for discovery of requirements  Prioritize requirements  Generate and evaluate alternatives  Review recommendations with management 10

Design Activities

 Design and integrate the network  Design the application architecture  Design the user interfaces  Design the system interfaces  Design and integrate the database  Prototype for design details  Design and integrate system controls 11

Implementation Activities

Construct software components

Verify and test

Convert data

Train users and document the system

Install the system

12

Support Activities (SLC, not SDLC)

 Maintain system  Small patches, repairs, and updates Enhance system Small upgrades or enhancements to expand system capabilities  Larger enhancements may require separate development project Support users Help desk and/or support team 13

FIGURE 2-2 The

SDLC Phases.

14

“Waterfall” Approach to the SDLC

15

“Waterfall” Approach

    Each life cycle phase is completed in

sequence

and then the results of the phase flow on to the next phase There is

no going back

once the phase is completed (like a waterfall) or it is extremely difficult to do The key

deliverables

for each phase are typically produced

on paper

(hundreds of pages in length) The decisions made at each phase are

frozen

, i.e. they cannot be changed 16

Overlap of activities

17

“Waterfall” Approach: pros and cons

• •

The two key advantages of the waterfall model:

Identifying system requirements long before programming begins It minimizes changes to the requirements as the project proceeds

The key disadvantages:

• The design must be completely specified on paper before programming begins • A long time elapses between the completion of the system proposal in the analysis phase and the delivery of the system (usually many months or years).

• • A paper document is often a poor communication mechanism, so important requirements can be overlooked in the hundreds of pages of documentation Users rarely are prepared for their introduction to the new system, which occurs long • after the initial idea for the system was introduced.

If the project team misses important requirements, expensive post-implementation programming may be needed.

• A system may require significant rework because of changes in business environment since the time the analysis phase occurred. It means going back to the initial phases and following the changes through each of the subsequent phases in turn.

18

The Parallel Model

   The

Parallel Model

attempts to address the problem of long delays between the analysis phase and the delivery of the system.

Instead of doing the design and implementation in sequence, it performs a general design for the whole system and then divides the project into series of distinct subprojects that can be designed and implemented in parallel Once all subprojects are complete, the final integration of the separate pieces is delivered 19

The Parallel Model

20

Parallel Model: pros and cons

Primary advantages:

 Can reduce the schedule time required to deliver a system  There is less chance of changes in the business environment causing rework

Key disadvantages:

 Still suffers from problems caused by paper documentation  A new problem: sometimes the subprojects are not completely independent; design made in one subproject may affect another and the end of the project may require significant integrative efforts 21

Newer Adaptive Approaches to the SDLC

 Based on

spiral model

Project cycles through development activities over and over until project is complete Prototype created by end of each cycle Focuses on mitigating risk 

Iteration

– Work activities are repeated Each iteration refines previous result Approach assumes no one gets it right the first time There are a series of mini projects for each iteration 22

Spiral Model

      Breaks each project into smaller pieces, each with a different type of risk (Sources of risk: undefined requirements, complex technology, uncertain competitive environment) The project begins in the center of the spiral where project is still small, easy to manage and low in risk Then the project slowly expands The project starts out small, initially handling a few of the risks Then the project expands in next iteration to address more of the risks Eventually the system is completed (all risks addressed)

Advantage:

 The iterative nature and focus on risk reduction 23

The Spiral Life Cycle Model

24

The Model with Iterations Iteration:

the process of looping through the same development activities multiple times, sometimes at increasing levels of details or accuracy   Assumes no one gets the right results the first time Do some analysis, then some design, then some implementation, then do some further analysis, etc until you get it right   

Idea:

not always realistic to complete analysis before starting design Waterfall no longer applies - Phases become blurred Decisions are not frozen at the end of each phase

Applicability:

 Good for projects where requirement specifications are hard to arrive at 25

Iteration of System Development Activities

26

Phased Development Model

     Breaks the overall system into a series of

versions

developed sequentially that are The analysis phase identifies the

overall system concept

requirements into a series of versions . The project team, users and system sponsors categorize the The most important and fundamental requirements are bundled into the first version of the system. The analysis phase then leads into design and implementation, but only with the set of requirements identified for version 1 Once version 1 is implemented, work begins on version 2. Additional analysis is performed on the basis of the previously identified requirements and combined with new ideas and issues that arose from users’ experience with version 1. Version 2 then is designed and implemented, and work immediately begins on the next version. This process continues until the system is complete 27

Phased Model

28

Phased Model: pros and cons

 

Advantages:

Quickly getting a useful system into the hands of users. Although it does not perform all the functions the users need, it helps them sooner to identify important additional requirements

Disadvantages:

first version.

The users begin to work with systems that are incomplete. It is critical to identify the most important and useful features and include them in the 29

Just For Fun

http://www.funnyhumor.com/pictures/206.php

30

Prototyping model

    Performs analysis, design and implementation phases

concurrently

, and all three phases are performed repeatedly in a cycle until the system is completed.

The basics of analysis and design are performed, and work immediately begins on a amount of features

system prototype

(i.e., a ‘quick-and-dirty” program that provides a minimal The first prototype is shown to the users and the project sponsor, who provide comments, which are used to re-analyze, re-design, and re-implement a

second prototype

that provides a few more features This process continues in a system.

cycle

until the analysts, users and sponsor agree that the prototype provides enough functionality to be installed and used. Refinement occurs until it is accepted as the new 31

Prototyping SDLC

32

Prototyping model: pros and cons The key advantages:

• Very quickly provides a system for users to interact with. It reassures the users that the project team is working on the system. The users can interact with the prototype to better understanding what it can and cannot do rather than attempting to understand a system specification on paper.

The major disadvantages:

• Fast-paced system releases challenge attempts to conduct careful, methodical analysis. Often the prototype undergoes such significant changes that many initial design decisions become poor ones. This can cause problems in the development of complex systems because fundamental issues and problems are not recognized until well into the development process.

33

Throwaway Prototyping

    

Similar

of prototypes, however, they are done at a different point in the SDLC to the prototyping model in that it includes the development Has a relatively

thorough analysis phase

that is used to gather information and to develop ideas for the system concept. Many of the features suggested by the users may not be well understood and many technical issues may not be solved.

Each of these issues are examined by analyzing, designing and building a

design prototype

(it is not a working system; it only represents a part of the system that needs additional refinement and it contains only enough details to enable users to understand the issues under consideration) Typically,

several prototypes

are used during analysis and design phase. Each of them is used to minimize the risk of missing of important issues before the real system is built.

Once the issues are resolved, the project moves into design and implementation. At this point, the design prototypes are thrown away, what is a

principal difference

between this model and prototyping, in which the prototypes evolve into the final system 34

Throwaway Prototyping Model

35

Throwaway Prototyping: pros and cons

• Balances the benefits of well-through-out analysis and design phases with the advantages of using prototypes to refine key issues before a system is built.

• It may take longer to deliver the final system as compared with prototyping (as far as the prototypes do not become the final system), but this model usually produces more stable and reliable systems.

36

Criteria for Selecting the Appropriate Model of SDLC

37

Criteria for Selecting

Clarify of user requirements stages of the SDLC. Sometimes the user requirements are unclear or subject to change. Prototyping and throwaway prototyping are more appropriate models for such situations, because they provide prototypes for user to interact with at early Familiarity with Technology When the system will use new technology, which is unfamiliar for the analysts and programmers (e.g. the first Web-based project with Java), it increases the risks. Application of the new technology as early as possible will improve the chance of success. Throwaway prototyping is particularly appropriate for this situation since it explicitly encourages the developers to develop design prototypes for areas with high risks. Phased model is good as well because it creates opportunities to investigate the technology in some depth before the design is complete.

System Complexity Complex systems require careful and detailed analysis and design. Throwaway prototyping is particularly well suited to such situation, but prototyping is not. The traditional structured methodologies can handle complex systems, but without the ability to get the system or prototypes into users’ hands early on, some key issues may be overlooked. Even though the phased model enables users to interact with the system early in the process.

38

Criteria for Selecting

Short time schedules Projects with short time schedules are well suited for RAD models as far as they are designed to increase the speed of development. Prototyping and phases development are excellent choices because they best enable the project team to adjust the functionality in the system. If the project schedule starts to slip, it can be readjusted by removing functionality from the version or prototype under development. The waterfall model is the worst choice, because it does not allow for easy schedule changes.

Schedule visibility One of the greatest challenges in systems development is knowing whether a project is on schedule. This is particularly true of the structured methods because design and implementation occur at the end of the project. The RAD models move many of the critical design decisions to an earlier point in the project to help project managers to recognize and address risk factors and keep expectations in check.

39

Methodologies

Methodologies

Comprehensive guidelines to follow for completing every SDLC activity Collection of models, tools, and techniques 40

Relationships Among Components of a Methodology

41

Models

 Models Representation of an important aspect of real world, but not same as real thing Abstraction used to separate out aspect •

physical

(like a model of an airplane) •

abstract

(e.g. in form of mathematical notation or in graphical form) Models in SDLC are graphical: diagrams and charts Project planning and budgeting aids 42

Some Models Used in SDLC

43

Tools

 Tools Software support that helps create models or other required project components Range from simple drawing programs to complex CASE tools to project management software 44

Some Tools Used in SDLC

45

Techniques

 Techniques Collection of guidelines that help analysts complete a system development activity or task Can be step-by-step instructions or just general advice 46

Some Techniques Used in SDLC

47

Two Approaches to System Development

Traditional approach

Also called structured system development Structured analysis and design technique (SADT) Includes information engineering (IE) 

Object-oriented approach

Also called OOA, OOD, and OOP Views information system as collection of interacting objects that work together to accomplish tasks 48

Traditional Approach

 Structured programming Improves computer program quality Allows other programmers to easily read and modify code Each program module has one beginning and one ending Three programming constructs (sequence, decision, repetition) 49

Three Structured Programming Constructs

50

Top-Down Programming

 Divides complex programs into hierarchy of modules  The module at top controls execution by “calling” lower level modules  Modular programming Similar to top-down programming  One program calls other programs to work together as single system 51

Top-Down or Modular Programming

52

Structured Design

 Technique developed to provide design guidelines What set of programs should be What program should accomplish How programs should be organized into a hierarchy  Modules are shown with structure chart  Main principle of program modules Loosely coupled – module is independent of other modules Highly cohesive – module has one clear task

Structure Chart Created Using Structured Design Technique

54

Structured Analysis

 Define what system needs to do (processing requirements)  Define data system needs to store and use (data requirements)  Define inputs and outputs  Define how functions work together to accomplish tasks  Data flow diagrams (DFD) and entity relationship diagrams (ERD) show results of structured analysis 55

Data Flow Diagram (DFD) Created Using Structured Analysis Technique

56

Entity-Relationship Diagram (ERD) Created Using Structured Analysis Technique

57

Structured Analysis Leads to Structured Design and Structured Programming

58

Weaknesses of the Structured Approach

• Techniques address some but not all of the activities of analysis and design • Techniques make system development not enough formal (not like an engineering discipline) but rather like an art.

• analysis) to the structure chart (in structured design) did not work well in practice.

• The transition from the data flow diagram (in structured data modeling using structure chart and ER diagram were more important than modeling of processes (using dataflow diagrams) • rather than data the central focus of the system • • However, the structured approach overall still made processes Many felt a strategic planning technique needed to be included in the approach to determine which systems to be built and to provide some initial requirements.

As an alternative: information engineering.

59

Information Engineering (IE)

     Focus on strategic planning to identify all the organization information needs (the application architecture plan), data modeling, and automated tools More focused on data itself than the structured approach. But just as the structural approach includes data requirements, IE includes processes, too The processing model of information engineering, the

process dependency diagram

, is similar to a data flow diagram, but it focuses more on which processes are dependent on other processes and less on data inputs and outputs Provides more complete life cycle support through the use of an integrated CASE tools (help to automate systems development; final program code can be generated automatically by the CASE tools) Became popular on large-mainframe systems in the 1980’s, less used in the 1990’s on smaller desktop systems (but concepts still used by planning and emphasis on data modeling) 60

Structured Approach and IE

 Both approaches define information system requirements, design and construct information systems by looking at processes, data and the interaction of these two  Industry merged key concepts from structured development and information engineering approaches into

traditional approach

 An

object-oriented

technology provides a completely different perspective 61

Object-Oriented Approach

 Completely different approach to information systems  Views information system as collection of

interacting objects

that work together to accomplish tasks Objects – things in computer system that can respond to messages Conceptually, no processes, programs, data entities, or files are defined – just objects  OO languages: Java, C++, C#, .NET, VB 62

Object-Oriented Approach to Systems

63

Object-Oriented Approach (continued)

 Object-oriented analysis (OOA) Defines types of objects users deal with Shows use cases are required to complete tasks  Object-oriented design (OOD) Defines object types needed to communicate with people and devices in system Shows how objects interact to complete tasks Refines each type of object for implementation with specific language of environment  Object-oriented programming (OOP) Writing statements in programming language to define what each type of object does 64

Class Diagram Created During OO Analysis

65

SDLC Variations

 Many variations of SDLC in practice Based on variation of names for phases No matter which one, activities/tasks are similar  Some increase emphasis on people User-centred design, participatory design Socio-technical systems  Some increase speed of development Rapid application development (RAD) Prototyping 66

Rapid Application Development Rapid application development

variations of SDLC (RAD) is one of the Aims to speed up the development process. Emerged in the 1990s as an attempt to address both weaknesses of the waterfall development: long development times and the difficulty in understanding a system from paper based description.

Methods:

• Tries to speed up the activities in each phase (e.g. speeding the analysis phase by scheduling intensive meetings of key participants to get information gathered and decisions made rapidly) • Using iterative development (e.g., spiral life cycle model) to speed up the process of getting to design and implementation • It improves understanding of the system requirements • Building prototypes of the system during analysis and design phases. Using

CASE

(computer-aided system engineering)

tools

to speed up the analysis, design and implementation phases 67

Current Trends in Development

 More adaptive approaches The Unified Process (UP) Extreme Programming (XP) Scrum  Details on each in Chapter 17 68

The Unified Process (UP)

       Object-oriented development approach Offered by IBM / Rational Booch, Rumbaugh, Jacobson Unified Modeling Language (UML) used primarily for modeling UML can be used with any OO methodology UP defines four life cycle phases Inception, elaboration, construction, transition Defines workflows within each phase: business modeling, requirements modeling, analysis and design, implementation, testing, development, configuration and change management, and project management Involves roles of: designer, use case specifier, systems analyst, implementer, architect 69

Unified Process Life Cycle

70

The Unified Process (UP) (continued)

 Reinforces six best practices Develop iteratively Define and manage system requirements Use component architectures Create visual models Verify quality Control changes 71

Extreme Programming (XP)

 Recent, lightweight, development approach to keep process simple and efficient  Describes system support needed and required system functionality through informal user stories  Has users describe acceptance tests to demonstrate defined outcomes  Relies on continuous testing and integration, heavy user involvement, programming done by small teams 72

Scrum

 For highly adaptive project needs  Respond to situation as rapidly as possible  Scrum refers to rugby game Both are quick, agile, and self-organizing  Team retains control over project  Values individuals over processes 73

Computer-Aided System Engineering (CASE) Tools

      

CASE tools

are software tools designed to help systems analyst complete development tasks The CASE tool contains a database of information called a repository The

repository

stores information about the system, including models, descriptions, and references that link the various model together Information stored in repository can be used in a variety of ways by the development team Every time a team member adds information about the system, it is immediately available for everyone else CASE tools can check the models to make sure they are complete and follow the correct diagramming rules CASE tools can check one model against another to make sure they are consistent 74

Visual Modeling Tool Repository Contains All System Information

75

CASE Tools: Examples

Microsoft Visio

• a drawing tool suitable for about any system model • • comes with a collection of drawing templates (incl. symbols used in a variety of business and engineering applications: flowcharts, DFDs, ERDs, UML diagrams) provides only a limited repository for storing definitions and descriptions of diagram elements, but not a complete repository for a system development project.

76

Visio for drawing a variety of diagrams and charts

77

CASE Tools: Examples (cont’d)

Oracle Designer

• a tool set for recording definitions and automating the rapid constructions of flexible, graphical

client-server applications

• • • • integrated with Oracle Developer (a tool for creating GUI applications) includes a

complete repository

, diagramming and code-generating capabilities an integrated CASE tool that supports

traditional approach

to system development (process modeler, function-hierarchy diagrammer, data flow diagrammer, entity-relationship diagrammer) Design Transformer and Design Editor produce diagrams along with the database and application logic 78

Oracle Designer: Front Panel screen

79

Oracle Designer: Entity Relationship Diagrammer

80

CASE Tools: Examples (cont’d)

TogetherSoft

• The most recent concept of

round-trip engineering

• • • allows synchronizing the graphical models (such as class diagram) with generated program code (automation in both directions – round trip). If the program code is changed, the class diagram is updated and contra versa, if the class diagram is changed, the program code is updated. Together uses UML diagrams with several different programming languages 81

Together showing a class diagram with synchronized Java source code

82

CASE Tools: Examples (cont’d)

Embarcadero Describe

• a new product that include modeling and round-trip engineering features • • provides flexible UML modeling capabilities for analysis and design provides round-trip engineering with several Java development tools (JBuilder and Sum Forte) 83

Embarcadero Describe with visual modeling and round-trip engineering

84

Readings

Today’s lecture: Chapter 2 – “Approaches to System Development” For next lecture: Chapter 3 – “The Analyst as a Project Manager” 85