S2E Meeting on 07.04.2013 Yauhen Kot Plans for March 2013 and Achieved Progress 1. Track 250pC and 500pC within the same optics and RF parameters. establish suitable bunch distributions for lasing: 25% 100% 2. Check Lasing of these Bunches: 0% 50% 3. Internal report about S2E Simulations for XFEL for pair 250/500pC: 0% 20% 500pC. Combined WP with 250pC. Summary After S2E 500pC. Combined WP with 250pC. Single Laser and Solenoid. At s=1630m 1.4 slice emittance hor. mm mrad slice emittance vert., mm mrad Current, kA/5 slice energy spread, MeV 1.2 Emittance x 𝟒. 𝟖𝟔 ∙ 𝟏𝟎−𝟕 Emittance y 1.37 ∙ 10−6 1 a. u. 0.8 Peak Current 5.2 kA Mismatch x 1.016 Mismatch y 1.061 0.6 0.4 0.2 0 -50 -40 -30 -20 -10 m 0 10 20 30 40 500pC. Combined WP with 250pC. Longitudinal Phase Space After S2E 500pC. Combined WP with 250pC. Longitudinal Phase Space Final Energy, GeV 17.44 de/e 17.435 17.43 𝟐. 𝟖𝟒 ∙ 𝟏𝟎−𝟒 Bunch length rms 1.304 ∙ 10−5 m Bunch length rms 43.47 fs 17.425 17.42 17.415 -30 -20 -10 m 0 10 20 500pC. Combined WP with 250pC. SASE Simulations 500pC. Combined WP with 250pC. Single Laser and Solenoid. At s=1630m 1.4 slice emittance hor. mm mrad slice emittance vert., mm mrad Current, kA/5 slice energy spread, MeV 1.2 1 0.8 a. u. 45 m of bunch simulated beginning after first 11m 0.6 0.4 0.2 0 -50 Maximum Power along Undulators -40 -30 -20 -10 m 0 10 20 Maximum Power along Bunch 30 40 250pC. Combined WP with 500pC. Summary After BC2 250pC. Combined WP with 500pC. Summary at s=391.38m 1.6 Emittance x 3. 𝟒𝟓𝟕 ∙ 𝟏𝟎−𝟕 Emittance y 1.714 ∙ 10−6 1.4 1.2 1 0.8 0.6 Peak Current 7.8 kA Mismatch x 1.007 Mismatch y 1.039 0.4 0.2 0 -30 -25 -20 -15 -10 -5 0 5 10 15 20 250pC. Combined WP with 500pC. Longitudinal Phase Space After BC2 de/e 2.285 𝟐. 𝟖𝟗 ∙ 𝟏𝟎−𝟑 Energy, GeV 2.29 Bunch length rms 0.730 ∙ 10−5 m Bunch length rms 24.33 fs 2.295 2.3 2.305 2.31 -25 -20 -15 -10 -5 m 0 5 10 15 Difficulties - Different chirp for 250pC and 500pC at entrance BC2 250pC vs Reference 2315 2310 2305 2300 2295 2290 2285 2280 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 x 10 -4 Plans for the Next Month A. Finish this work: 1. Track 250pC and 500pC within the same optics and RF parameters. establish suitable bunch distributions for lasing: 25% 100% 2. Check Lasing of these Bunches: 0% 50% 3. Internal report about S2E Simulations for XFEL for pair 250/500pC: 0% 20% B. To be discussed - implement back the gaussian laser …