Transcript Slide 1
NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO June 2010 TABLE OF CONTENTS SR# DESCRIPTION I. List of NTDC Projects where Financing has been lined up Table-1 II. List of NTDC future projects for which Financing is to be arranged. Table-2 III. List of Power Dispersal Projects for Thermal Power Projects Table-3 IV. List of Power Dispersal Projects for large Hydro Power Plants. Table4 Table-1 LIST OF NTDC PROJECTS WHERE FINANCING HAS BEEN LINED UP S.# Name of Project 1 220 kV Gujrat 2 220 kV Chishtian 3 500 kV New Lahore Expected Estimated Approval Year of Cost Eqt. US$ by Financing commissi(Rs. in in Million ECNEC oning Million) Transformer Capacity (MVA) ASSOCIATED TRANSMISSION LINES 3x250 220 kV Mangla-Ghakkar D/C In/Out at Gujrat (2+2 km) 1966 33 22.10.2007 JICA 2x250 220 kV Vehari Chishtian D/C T/Line. ( 65 km) 2633 44 22.10.2007 JICA 12524 149 PC-I cleared by CDWP on 18.03.2010 JICA 2x750 Two 500 kV S/C T/Lines for In/out of 500 kV Sahiwal – Lahore S/C at Lahore New (15+15 km) Two 500 kV S/C T/Lines for In/out of 500 kV Lahore – Gujranwala S/C at Lahore New (50+50 km) 220 kV D/C T/Line for In/out of 220 kV NKLP-Ghazi Road at Lahore New. (50 km) 220 kV D/C T/Line for In/out of 220 kV NKLP-Wapda Town at Lahore New. (54km) 2011-12 2011-12 2012-13 LIST OF NTDC PROJECTS WHERE FINANCING HAS BEEN LINED UP (Table-1) S.# Name of Project Transformer Capacity (MVA) ASSOCIATED TRANSMISSION LINES Expected Estimated Eqt. US$ Year of Cost Approval in Financing commissi(Rs. in by ECNEC Million oning Million) Two 500 kV S/C T/Lines for In/out of 500 kV Dadu-Guddu circuit No:1 at Shikarpur (20+20 km) 500 kV 4- Shikarpur 2x600 Two 500 kV S/C T/Lines for In/out of 500 kV Dadu-Guddu circuit No:2 at Shikarpur. (22+22 km) 220 kV D/C for In/Out of 500/220 kV Guddu – Sibbi S/C at Shikarpur (50 km) 8049 96 Pc-I Cleared by CDWP on 18.03.2010 JICA 2012-13 Table-1 LIST OF NTDC PROJECTS WHERE FINANCING HAS BEEN LINED UP Name of Project S.# Expected TransforEstimated ASSOCIATED Eqt. US$ Year of mer Cost Approval TRANSMISSION in Financing commissiCapacity (Rs. in by ECNEC LINES Million oning (MVA) Million) - 220 kV D/C T/L for In/out of MansheraIslamabad T/L (40 km) 1090 13 PC-I under ADB Tr-IV preparation 2012-13 2 Source of supply to Hala 6Road Grid Station - 220 kV D/C T/L from T.M Khan Road to Hala Road (30 km) 850 10 PC-I under ADB Tr-iV preparation 2012-13 220 kV Nowshera 2x160 - 830 10 06.02.2008 ADB Tr-iV 2012-13 2X250 220 kV Chakdara – Mardan (85 km) 3270 38 PC-I under ADB Tr-iIV preparation 2013-14 nd 2 source of supply to 5Islamabad University nd 7- 220 kV 8Chakdara Table-1 LIST OF NTDC PROJECTS WHERE FINANCING HAS BEEN LINED UP Transformer S.# Name of Project Capacity (MVA) Augmentation of 500 & 220 kV existing substations 9- ASSOCIATED TRANSMISSI ON LINES Expected Estimated Eqt. US$ Year of Cost Approval in Financing commissi(Rs. in by ECNEC Million oning Million) - 500 kV Rewat 1x750 - 500 kV Sh. Muhammadi 4x250 - 220 kV Mardan 2x250 - 220 kV Burhan 4x250 - 220 kV Bund Rd 4x250 - 220kV Sarfaraz Nagar 3x250 - 220 kV Bahawalpur 2x250 - 500 kV Jamshoro 1x250 - 220 kV Quetta New 1x250 - 4550 54 PC-I under preparation ADB Tr-I (Ext-II) 2012-13 LIST OF NTDC PROJECTS WHERE FINANCING HAS BEEN LINED UP (Table-1) Transfor S.# -mer Name of Project ` Capacity (MVA) 10- 11- 220 kV Mirpur Khas 220 kV Taxila. 12- 220 kV Manshera 13- 220 kV D.M Jamali Interconnection of 1200 MW AES Imported coal 14based Power Plant near Karachi (Part-I) ASSOCIATED TRANSMISSION LINES Expected Estimate Eqt. Year of d Cost Approval US$ in Financing commissi (Rs. in by ECNEC Million -oning Million) 2x160 220 kV D/C T/L from Hala Rd. to .M.Khan Rd. (10 km) In/Out of one circuit of above 220 kV proposed T/L at Mirpur Khas New (70 km). 2900 35 PC-I under preparation ADB Tr-IV 2013-14 2x250 In/Out of 220 kV Burhan - ISPR S/C at Taxila. (6 km) 2160 27 PC-I under preparation ADB Tr-IV 2013-14 2x160 In/out of 220 kV Alai Khawar-Sangjani T/L at Manshera (0.5+.0.5 km) 1079 13 PC-I under preparation Iranian Loan 2013-14 1x160 1x100 in/out of 220 kV Uch-Guddu S/C at D.M. Jamali (5 km) 10 PC-I submitted to GoP PM’s Fund 2013-14 - 500 kV Jamshoro-R.Y.K (535 km) 500 kV Moro-Dadu (55 km) 298 PC-I cleared by CDWP on 18.03.2010 ADB Tr-III 2015-16 857 24078 Table-2 LIST OF NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED SR #. 1- NAME OF NEW SUBSTATIONS ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING 2900 34 2012-13 2975 35 2012-13 2x250 220 kV Gatti - Ludewala D/C In/Out at Chiniot Industrial. (2+2 km) 2380 28 2012-13 2x250 220 kV D/C cable from Shadman to Bund Road (30 km) 4250 50 2012-13 3825 45 T/F CAP. (MVA) 220 kV Chakwal 2x160 2- 3- 4- 5- 7- 220 kV GIS Jhang Rd. Faisalabad 220 kV Chiniot. Industrial 2x250 220 kV Shadman 220 kV D.I Khan 220 kV Gharo 2x250 2x250 ASSOCIATED TRANSMISSION LINES In/out of 220 kV ManglaRewat S/C at Chakwal (50 km) 220 kV Samundri Rd. – Jhang Rd. D/C T/L (40 km) 220 kV D/C T/Line for In/out of 220 kV Chashma Nuclear – Ludewala S/C at D.I Khan (100 km) 220 kV Gharo – T.M Khan Road ((130) 2012-13 4600 54 2012-13 Table-2 LIST OF NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED SR #. NAME OF NEW SUBSTATIONS 8- 220 kV Jhimpir 9- 220 kV Mastung 10- 220 kV Jamrud` 11- 500 kV Faisalabad New ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRD YEAR OF COMMISSIONING 2x250 In/Out of 220 kV Gharo – T.M Khan Road at Jhimpir (65 km) 3200 38 2012-13 2x250 220 KV Mastung Sibbi (120 km) 4100 48 2013-14 2x250 220 kV Jamrud – Sh. Muhammadi (10 km) 1450 17 2013-14 2x750 In/out of 500 kV Muzaffargarh st – Gatti 1 circuit at at Faisalabad new (1+1 km) 6600 78 2013-14 3570 42 2013-14 T/F CAP. (MVA) 2x250 12- 220 kV Faisalabad New – T.T Singh D/C T/Line (70 km) 220 kV M3 Industrial Estate – Faisalabad New (70 km) 220 kV M-3 Industrial Estate 2x250 In/Out of 220 kV Faisalabad New - M3 Industrial Estate at 220 kV Chinot Industrial New (30 km) Table-2 LIST OF NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED SR #. NAME OF NEW SUBSTATIONS 13- 500 kV Peshawar New T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING 5400 64 2014-15 6000 70 2014-15 2700 31 2014-15 430 5 2014-15 1450 17 2015-16 In/out of Tarbela – Sh. Muhammadi at Peshawar New (2+2 km) 2x750 In/Out of 220 kV Sh. Muhammadi-Shahibagh at Peshawar New (5 km) 14- 220 kV Kohat – Peshawar New (50 km) 220 kV Kohat 2x250 15- 220 kV Islamabad I-10 16- Ext. at 220 kV Gujrat 17- 220 kV Kamalabad 2x250 1x250 2x250 220 kV Kohat – Bannu (150 km) In/Out of 220 kV Rewat – Islamabad University D/C at Islamabad I-10 (30+30 km) - In/out of Rewat – Islamabad Peshawar Rd. at Kamalabad (5+5 km) Table-2 LIST OF NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) 18- Ext. at 500 kV Gujranwala 1x600 19- Ext. at 500 kV Lahore New 1x750 20- 220 kV Kamra 21- 220 kV Iqbal Town 22- 220 kV Gujranwala New ASSOCIATED TRANSMISSION LINES - ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING 1700 20 2015-16 2000 24 2015-16 2x250 In/out of 220 kV Tarbela – Taxila at Kamra (5 km) 1300 15 2015-16 2x250 In/Out of 220 kV Lahore – Wapda Town D/C at Iqbal Town (20+20 km) 2150 25 2015-16 2900 34 2015-16 2400 28 2015-16 2x250 In/Out of 220 kV Mangala – K.S.K at Gujranwala New (20 km) 220 kV Nokhar - Gujranwala New (50 kM) 2324- 220 kV Pindi Bhattian 220 kV Head Faqirian 2x250 2x250 220 kV Pindi Bhattian Ind. – Gujranwala (50 km) 220 kV Head Faqirian – Ludewala (60 km) 28 2400 2015-16 Table-2 LIST OF NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED SR #. NAME OF NEW SUBSTATIONS 25- 220 kV Joharabad 26- 220 kV Alizai 27- 2 Source of supply to 220 kV Chakwal substation 28- 29- ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING 2x250 In/out of 220 kV D/C Ludewala –Chashma at Jauharabad (5+6 km) 1450 17 2015-16 2x250 220 kV Kohat – Ali zai D/C (110 km) 3900 45 2015-16 1500 18 2015-16 3825 45 2015-16 1450 17 2015-16 82620 972 T/F CAP. (MVA) nd - nd 2 Source of supply to 220 kV Bhawalpur substation 220 kV Arif Wala - 2x250 ASSOCIATED TRANSMISSION LINES In/out of 220 kV Mangla nd Rewat 2 circuit at Chakwal (60 km) 220 kV R.Y.K – Bahalawlpur D/C T/L (150 km) In/Out of 220 kV Yousafwala – Kassowal D/C at Arifwala (5+5 km) Total: Table-3 POWER DISPERSAL PROJECTS FOR THERMAL POWER PLANTS SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) 1- - 2- Dispersal of Power from Uch-2 - 3- UAE Combined Cycle power plant at GTPS Faisalabad 4- Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING 22270 262 2012-13 220 kV Uch-II – Sibbi D/C (125 km) 3000 35 2012-13 In/out of existing 132 kV T/lines at Proposed power plant 1700 20 2012-13 13778 (PC-I cleared by CDWP on 18.3.10) 170 2015-16 ASSOCIATED TRANSMISSION LINES 500 kV Guddu New PP – M. Garh (256 km) Power Dispersal from 747 MW CCPP at Guddu Interconnection of 1200 MW AES Imported coal based power near Karachi (Part-II) ESTIMATE D COST* (Rs.in Million) 1x160 500 kV switch ing statio n at Matiari 500 kV M. Garh – Sahiwal (212 km) 500 kV S/C T/Line from AES Power Plant to Matiari switching station (200 km) In/Out of 500 kV HubJamshoro S/C T/Line at AES (45+45 km) In/out of 500 kV JamshoroR.Y.K at Matiari (5+5 km) Table-3 POWER DISPERSAL PROJECTS FOR THERMAL POWER PLANTS SR #. 5- 6 NAME OF NEW SUBSTATIONS Interconnection of 1200 MW Engro & 1200 MW PEPCO’s Thar Coal Based Power Plants at Thar Interconnection of 1200 MW Imported coal based PPIB and 1000 MW Imported Coal based PEPCO’s power Plants at Karachi T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING 88400 1040 2015-16 85000 1000 2015-16 Three 500 kV circuits form Thar coal power plants to Matiari (275 km) - 500 kV HVDC Matiari – Lahore/ Faisalabad T/L (1100 km) Terminal Stations at both ends Two 500 kV circuits from Power Plants to Matiari (200 km each) - 500 kV HVDC Matiari – Lahore/Faisalabad T/L (1100 km) Extension of Terminal Stations at both ends Table-3 POWER DISPERSAL PROJECTS FOR THERMAL POWER PLANTS SR #. 7- 8- 9- NAME OF NEW SUBSTATIONS Import of 1000 MW Power from Iran Import of 1000 MW Power from Tajikistan (CASA1000) Dispersal of Power from Chashma. T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING 40120 472 2015-16 16065 189 2015-16 3000 35 2016-17 Two 500 kV HVAC S/C T/Lines from Zahidan to Quetta with series compensation (198 km) Switching station at Zahidan, Quetta and midpoint between Zahidan & Quetta - 500 kV HVDC T/L from Pak-Afghan Border to Peshawar (71 km) 500 kV Converter Station Peshawar 220 kV Chashma New – Bannu (125 km) - In/out of 220 kV D.I. Kahan – Jahurabad S/C at Chashma New (1 km) Table-3 POWER DISPERSAL PROJECTS FOR THERMAL POWER PLANTS SR #. NAME OF NEW SUBSTATIONS 10- Interconnection of 2x1000 MW Nuclear Power Plants at Karachi T/F CAP. (MVA) - ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING Three 500 kV Circuits from Nuclear Plants to Matiari (200 km each) 25500 300 2018-19 299455 3523 Total Table-4 LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS SR #. NAME OF NEW SUBSTATIONS 1- Dispersal of Power from 969 MW Neelum Jhelum Hydro Power Project to Rawat & Gujranwala T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING 19125 225 2015-16 13250 156 2015-16 850 10 2016-17 500 kV Neelum Jhelum – Rawat S/C T/Line (110 km). 500 kV Neelum Jhelum – Gujranwala S/C T/Line (235 km) 500 kV Karot – Lahore New (270 km) 2- 3- Dispersal of Power from Karot HPP Power Dispersal of Munda HPP - - In/Out of 500 kV Neelum Jhelum – Gujranwala at Karot (10 km) In/Out of 220 kV Peshawar – Shahi Bagh at Munda (35 km) Table-4 LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS SR #. 4- 5- NAME OF NEW SUBSTATIONS Dispersal of Power from 1100 MW Kohala Hydro Power Project to Gujranwala Dispersal of Power from Karot HPP (Phase-II) T/F CAP. (MVA) Three 500 kV line bays at Kohala One 500 kV line bay at Gujranwala ASSOCIATED TRANSMISSION LINES ESTIMATED COST* (Rs.in Million) Eqt. US$ in Million 11000 130 REQUIRED YEAR OF COMMISSIONING 500 kV 225 km long Kohala – Gujranwala S/C T/L Two 500 kV T/Lines 15 km each for in/out of 500 kV Neelum Jhelum – Gujranwala at Kohala 2017-18 500 kV Kohala – Karot – Gujranwala (240 km) - In/out of 500 kV Neelum Jhelum – Karot circuit at Kohala (4+4) 11820 139 2017-18 Table-4 LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS SR #. 6- NAME OF NEW SUBSTATIONS Dispersal of Power from 4500 MW Diamer Basha HPP to Lahore with interconnection at Dasu and Gujar Khan T/F CAP. (MVA) 765 kV HVAC substations at Gujar Khan & Lahore with 765/500 kV 3x500 MVA T/Fs 500 MVAR SVC at Gujar Khan ASSOCIATED TRANSMISSION LINES ESTIMATED COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING 113900 1340 2018-19 Three 765 kV HVAC T/Ls from Basha to Gujar Khan (407 km long each) Two 765 kV HVAC T/Ls from Gujar Khan to Lahore (260 km long each) Table-4 LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS SR #. 7- NAME OF NEW SUBSTATIONS Dispersal of Power from 5400 -7000 MW Bunji Hydro Power Project to Lahore with interconnection at Gujar Khan T/F CAP. (MVA) 765 kV HVAC substatin extn at: Basha, Dasu, Thakot, Gujar khan Lahore 765 kV new substation at Bunji. ASSOCIATED TRANSMISSION LINES ESTIMATED COST* (Rs.in Million) Eqt. US$ in Million REQUIREDD YEAR OF COMMISSIONING 126225 1485 2019-20 296225 3485 2 x 765 kV HVAC 110 km long Bunji Basha S/C T/Lines 1x765 kV HVAC 759 km long Bunji – Dasu-Thakot-Gujar Khan-Lahore S/C T/Lines Total PC-I for dispersal of Power from Neelum Jhelum HPP has been approved by ECNEC Studies are being carried out to ascertain the interconnection schemes for the projects at Sr. No: 2 to 7