Transcript sparc t5-4

1
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Optimizing Workloads with
the SPARC T5, the World’s
Most Powerful Processor
Robert Qiu
Randal Sagrillo
Program Agenda
 SPARC T5: Worlds Faster Microprocessor
 Optimizing Database Workloads
 Optimizing Java Workloads
 Optimizing Application Workloads
 For More Information
3
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
The following is intended to outline our general product direction. It is intended
for information purposes only, and may not be incorporated into any contract.
It is not a commitment to deliver any material, code, or functionality, and should
not be relied upon in making purchasing decisions. The development, release,
and timing of any features or functionality described for Oracle’s products
remains at the sole discretion of Oracle.
4
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
The World’s Fastest Processor: Oracle T5
T5-8 Runs Applications 5X Faster than T4-4
T5 Improvements
 2X cores
 2X threads
 2.5X memory bandwidth
 2X cache
System Improvements
 5X memory bandwidth
 4X I/O bandwidth
 2X memory capacity
 5X application performance
5
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
T5: 18 World Record Enterprise Benchmarks
 #1 TPC-C: fastest database server
 #1 SPECjbb 2013: fastest Java server
 #1 SPECjEnterprise 2010: fastest middleware server
 #1 SPEC CPU 2006: fastest raw processor performance
 #1 SAP-SD: fastest SAP 8-processor server
 #1 Siebel: fastest CRM server
As of June 10, 2013
6
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
See benchmark disclosure slide
Optimizing Database
Workloads
7
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
SPARC T5: Best for Data Warehouse Workloads
World Record Data Warehouse single-system performance
3TB TPC-H
chip,core
Database
QphH
$/QphH
Avail
SPARC T5-4
4, 64
Oracle 11g
409,722
$3.94
09/24/13
Oracle M9000
64, 256
Oracle 11g
386,478
$18.19
09/22/11
SPARC T4-4
4, 32
Oracle 11g
205,792
$4.10
05/31/12
IBM Power7 780
8, 32
Sybase
192,001
$6.37
11/30/11
• 3TB TPC-H: SPARC T5-4 is 2.1x faster than 8-chip Power7
• SPARC T5: 4.3x faster per chip, 1.6x better $/perf, & faster per core than IBM
• SPARC T5-4 6% faster M9000-64, Over 4x better price/performance
8
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
See benchmark disclosure slide
SPARC T5: Best for OLTP Workloads
World Record OLTP single-system performance
Server
Oracle SSC
IBM Power
780
Oracle T5-8
IBM p595
Oracle X4800
Cisco UCS
IBM Power
780
so,core
27n x 4ch
3n x 8ch
8, 128
32, 64
8, 80
2, 16
2, 8
Processor
SPARC T3
3.86 Power7
3.6 SPARC T5
5.0 Power6
2.4 Xeon E7
2.9 E5-2690
4.14 Power7
SW
Oracle 11g
DB2 9.7
Oracle 11g
DB2 9.5
Oracle 11g
Oracle 11g
DB2 9.5
tpmC $/tpm
C
30.2 $1.01
M
10.3 $1.38
M
8.55 $0.55
M
6.0M $2.81
5.0M $0.94
1.6M $0.47
1.2M $0.69
• World record single-system TPC-C 8,552,523 tpmC
• SPARC T5-8 delivers 3.1M IOPs from storage
• SPARC T5 2.4x faster per chip performance than IBM configuration
• 3-node IBM p780 (24 total chips at 10.3M), Oracle has 2.5x better $/tpmC
• SPARC T5 5x better response time than IBM p780 cluster (New Order 90%)
9
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
See benchmark disclosure slide
Telecommunications Provider
SPARC T5 and Oracle Solaris Improves Database Performance
COMPANY
•
One of the largest mobile telephony providers in
their region in Europe
•
Seeking to reduce reduce data center
complexity and cost, and increase subscriber
performance
RESULTS
•
Baseline equivalent tested Oracle SPARC T5-4
on a 6 CPU to 6 CPU basis compared to
existing IBM platform
•
1.1x improvement in I/O intensive query run
times
•
1.1x improvement in CPU intensive query run
times
•
1.1x improvement in merge query run times
OPPORTUNITY
• SPARC T5-4 with Oracle Solaris offers proven
higher performance and lower TCO than
existing IBM platform running Oracle Enterprise
Database 11gR2
SPARC T5-4
• Improve customer response times with higher
performance I/O, CPU, and query response
times
10
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Existing Platform
Telecommunications Provider
SPARC T5 and Oracle Solaris Significantly Reduce Total Cost of
Ownership
SPARC T5-4
IBM Power 795
Significant reduction in
Oracle core software
licensing costs
1.1x Improved Oracle Enterprise
Database 11gR2 Response
Times
Total Cost of Ownership Comparison
SPARC T5-4 to IBM Power 795 (both 64 cores)
Installed Base
Proposed
Total 5 Year TCO ($000)
IBM Power 795 SPARC T5-4
Hardware Acquisition
$
$
149
Hardware Service
$
1,957 $
98
Software Licensing/Service $
3,322 $
830
Power and Cooling
$
81 $
12
Floor Space
$
24 $
2
Integration
$
$
7
$
5,384 $
1,098
Net TCO Difference
5x Lower
System Configurations:
SPARC T5-4 SPARC T5 3.6GHz 1024GB 4 chips 64 cores
POWER 795 POWER 7 4.0GHz 512GB 8 chips 64 cores
11
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
European Hospital Organization
4x performance gain with no change to applications
COMPANY
RESULT
• Largest hospital organization in region
• Consolidate existing servers, improve performance
• Installed base of M5000 systems running Solaris 10
Chose SPARC T5-4 and Solaris 10 for best
combination of acquisition cost and
price/performance
• Achieved goal of providing the maximum
performance required at 4x existing platforms
• Lower cost to acquire than similarly positioned
IBM/AIX offering
• No application change required for DB2: no
patching, no porting, no recompile, just drop-in
replacement due to Solaris application
compatibility
OPPORTUNITIES
• Deliver 2x immediate performance gain with upside for 4x
improvement over time
• Lower cost of acquisition than IBM Power 7+ systems
• Next generation platform for DB2
SOLUTION
• Selected SPARC T5-4 servers running Solaris 10
• Solaris compatibility for applications ensures more rapid
transition
Performance
SPARC T5-4
SPARC M5000
12
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
SPARC M5000
SPARC T5-4
European Hospital Organization
Lower cost of acquisition and better price/performance than IBM
SPARC T5-4 #1
SPARC T5-4 #2
Oracle Solaris 10
Oracle Solaris 10
Oracle Solaris 10
IBM DB2

SPARC T5-4
SAN Storage
Increased Performance by 4X
Rapid time to Adoption
13
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Top Optimizations for Database Workloads
Beyond Instance Tuning and SQL Tuning
 Maximize memory available for SGA (Buffer Cache)
– Convert slower Physical I/O to Faster Logical I/O
 Use current and latest versions of Oracle Database and Oracle Solaris
– Automatic application of Critical Thread processing for LGWR and LMS
 Take care with virtualized I/O
– Direct I/O, Split Bus, SR-IOV better performance than Shared or Guest I/O
14
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Optimizing Java and
Middleware Workloads
15
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
SPARC T5: Best for Application (Java) Server
Better System and Processor Performance, Lower Cost
3.4x
50
40
30
20
10
0
Oracle T5-8
[email protected]
Bigger is better
16
IBM 780
[email protected] GHz
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
SPECjEnterprise®2010 Results per socket
SPECjEnterprise®2010 (thousands)
60
Processor Performance
System Cost
SPARC T5 vs. POWER7+
Eight-Socket Systems Comparison
$1,000
7,500
19%
7,000
6,500
6,000
5,500
5,000
$800
3.6x
$600
$400
$200
$0
SPARC T5-8
Bigger is better
System Cost in Thousands
System Performance
Eight-Socket Systems Comparison
IBM Power 730+
Oracle T5-8
Smaller is better
See benchmark disclosure slide
IBM 780
SPARC T5 Best for Java (SPECjbb2013 Multi-JVM)
World Record 2-chip on new realistic enterprise Java benchmark
30,000
SPARC T5
40,000
SPECjbb2013 per-chip
SPARC T5 1.9x faster HP x86
 SPARC T5 1.9x faster than HP E5-2690
 SPARC T5 2.23x faster than HP E7-4870
 IBM Power7+ only publishes SPECjbb2005,
SPEC retiring old benchmark in July 2013
Westmere
Xeon E7
SPARC T4
Sandy Bridge
10,000
Xeon E5-2690
20,000
0
SPARC T5-2 HP ML350p SPARC T4-2 HP DL980
17
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Application Server
Multi-JVM results
Processor
Max
jOPS
Crit
jOPS
HP DL980 G7 8-chip
2.4GHz E7-4870
106,141
23,268
SPARC T5-2 (2-chip)
3.6GHz SPARC T5
75,658
23,334
HP DL560p 4-chip
2.7GHz E5-4650
67,850
16,199
HP ML350p 2-chip
2.9GHz E5-2690
40,047
12,566
SPARC T4-2
2.85GHz SPARC T4
34,804
10,101
benchmark
See benchmarkSee
disclosure
slidedisclosure slide
Core Banking Applications
SPARC T5-8 Delivers Throughput for Core Banking Application
COMPANY
•
Large Oracle SPARC installed base financial
institution software ISV
•
Requirement to reduce data center costs and
consolidate platforms
•
Minimize risk and complexity by leveraging
Oracle Solaris operating system
RESULTS
•
8x price/performance advantage over IBM Pure
Flex
•
6x performance increase based on utilization
•
4x higher performance per core
•
4x additional agents supported
•
1.3x better application response times
OPPORTUNITY
• Characterize SPARC T5-8 as their new midrange system with proven performance against
IBM
• Replace IBM Pure Flex with T5-8 for higher
performance and better response times
Performance/Core
CPU Utilization
Price/Performance
SPARC T5
IBM
18
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
0
5
10
Core Banking Applications
SPARC T5-8 Delivers Throughput for Core Banking Application
IBM Pure Flex
SPARC T5-8
Oracle Solaris 11
6x Performance increase
4x better performance per core
30% faster response times
19
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Superior Scalability
and Virtualization
Optimizing Java/Application Server Workloads
Use Scheduling Class and Memory Placement to Improve Efficiency
 Host Oracle WebLogic server instances on separate Oracle Solaris
Zones
– Improves consolidation efficiency.
 Bind each zone to a separate processor set.
– Reduces memory access latency and contention.
– Use default processor set for network and interrupt handling.
 Run application servers in FX (Fixed Execution) scheduling class
– Reduces frequency of context switches.
20
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Optimizing Application
Workloads
21
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
SPARC T5 Best for Oracle Siebel
SPARC T5 & Solaris10 setting world records, beating IBM Power7
 #1 Oracle Siebel's PSPP benchmark Call
 Two IBM Power 750 app tier only
supported 21,000 users
– SPARC T5 1.9 faster per chip than
Power7
 SPARC T5-2 333,339 transactions/hr
10,000
10,000
# users per chip
Center & Order Management
 Two SPARC T5-2: 40,000 users App server
8,000
Siebel PSPP
Benchmark
(per chip)
6,000
5,250
4,000
2,000
– IBM was at 176,185 transactions/hr
 sub-second online response time
22
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
0
SPARC T5
See benchmark disclosure slide
IBM Power7
SPARC T5 Best for Oracle JD Edwards
SPARC T5-2 batch+online World Record, beats IBM Power 770
Batch performance
198.5
JD Edwards
Benchmark
Online+Batch
 #1 Oracle JD Edwards DIL benchmark
 SPARC T5-2: 6.1x faster per chip on batch
than IBM Power7 on concurrent online+batch
– SPARC T5 (2-chip, 32core) is also 3.1x faster
per core than Power7
– IBM Power 770 (4-chip 32core) batch at 65
65.0
UBE/min
 SPARC T5-2 12k online users interactive
matches IBM Power 770
SPARC T5-2
23
IBM Power7
4chip
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
– SPARC T5-2 sub-second response online
See benchmark disclosure slide
Financial Services Provider
SPARC T5-8 and Oracle Solaris Beats IBM Power 780 in Real-time
Streaming
RESULTS
COMPANY
•
International financial services provider
optimizing datacenter with Oracle SPARC
•
Testing SPARC T5-8 as a new mid-range
system with high scalability
•
6x larger available CPU headroom
•
5x space reduction based on rack unit capacity
•
7x lower server cost based on comparative
server pricing
OPPORTUNITY
• Proven faster real time streaming performance
with SPARC T5-8 over IBM Power 780
• Opportunity to displace IBM Power systems
Performance/Core
CPU Utilization
based on price/performance superiority
Price/Performance
SPARC T5
IBM
24
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
0
5
10
Financial Services Provider
SPARC T5-8 and Oracle Solaris Advantage Over IBM Power 780
Scalability of Oracle Solaris/SPARC
and superior virtualization with
Solaris Zones
IBM Power 780
SPARC T5-8
Oracle Solaris 11
5x Reduction in Footprint
7x Reduction in Costs
25
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Superior Scalability
and Virtualization
US Insurance Claims Company
Over 150x Faster Claims Processing with No Application Changes
COMPANY
RESULT
• North American company specializing in third-party
SPARC T5 and T4 servers with Oracle Solaris 10
delivered outstanding performance and will enable
rapid adoption into data center
• SPARC T4-4 systems tested at Oracle Solution
Center processed claims over 150x faster than
existing V890 system
• V890 system processed 83 claims in an hour vs.
8,000 claims per hour on SPARC T4-4. SPARC T5-4
expected to do 2x more than T4-4
• Oracle Solaris 10 compatibility ensures project will
be completed within 6-8 week deadline
administration of insurance claims
• Claims application runs with Oracle Database on Sun Fire
V890 systems with Oracle Solaris 10
• Recent acquisitions of smaller companies growing the
volume of claims processing required
OPPORTUNITIES
• Evaluating new SPARC T4 and SPARC T5 systems to improve
performance and capacity of claims processing
• Minimize risk in transition from existing platforms
• Tight timeline due to rapid integration of acquisitions
SOLUTION
• Selected SPARC 3 T5-4 and 6 T4-1 servers running Oracle
Solaris 10
26
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Claims Processed Per Hour
SPARC V890
SPARC T4-4
SPARC T4-4
SPARC V890
US Insurance Claims Company
Oracle SPARC and Solaris Deliver Massive Performance Improvement
SPARC T5-4 #1
SPARC T5-4 #...
6X
Claims Processing
Application
3
Claims Processing
Application
SPARC T4-1
App Server
SPARC T4-1
Oracle Solaris 10
Oracle Database 11gR2
Internal Claims Processing
Application

SPARC T5-4
SPARC T4-1
T5-4
T4-1
App Server
Oracle Solaris 10
Oracle Solaris 10
SAN Storage
Dramatic Peformance Improvement
6-8 Week Time to Production
27
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
European Hosting Service Provider
50% faster single thread performance with no migration effort
COMPANY
RESULT
• European hosting provider delivering core banking
Selected SPARC T5-2 and Oracle Solaris 10 due to
superior price/performance over IBM and minimal
risk in migration
• SPARC T5-2 systems delivered between 27% up to
50% better single thread performance over M8000
• Lower cost to operate via reduced power/space
and cooling over M8000
• Financial ISV working on port to Solaris 11 – will
upgrade hosting offering when support complete
• Other business units at hosting company now
evaluating SPARC T5
platform services to multiple regional banks
• Financial banking application running with Oracle Database
• Installed base of M8000 systems competing against IBM
Power 7+ platforms
OPPORTUNITIES
• Deliver at least 25% single thread performance increase
• Better price/performance over IBM solutions
• Minimize migration effort from existing compute standard
SOLUTION
• Selected SPARC T5-2 servers running Solaris 10
• Solaris compatibility ensures no migration effort when
moving applications from SPARC/Solaris
28
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Single Thread Performance
SPARC M8000
SPARC T5-2
SPARC T5-2
SPARC M8000
European Hosting Service Provider
50% faster single thread performance with no migration effort
SPARC T5-2 #1
SPARC T5-2 #2
Financial Banking
ISV Application
Financial Banking
ISV Application
Oracle Solaris 10
Oracle Solaris 10
Oracle Solaris 10
Oracle Database 11gR2
Financial ISV Application

SPARC T5-2
SAN Storage
Low Risk Migration
Faster Single Thread Performance
29
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Optimizing Application Workloads
Without Application Rewrite
 Use Solaris Zones and OVM for SPARC
– Greatly increase platform and application efficiency
 Use Oracle Solaris Zone Clusters
– Greatly increase availability of your applications
 Use guidelines for Oracle Optimized Solutions
– Workload specific tuning, sizing and testing results for the real world
30
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Next Steps
31
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Oracle Optimized Solutions by Workload
Enterprise
Applications
Middleware
Oracle E-Business Suite
PeopleSoft HCM
Siebel CRM
2X lower TCO than IBM
11X faster, ½ the cost of IBM
2X business operations than IBM
JD Edwards EnterpriseOne
Agile PLM
3.5X faster than IBM
36% Lower TCA than IBM
Oracle Unified
Directory
3X greater scale
Systems
Infrastructure
32
5X better TCO than EMC
Symmetrix VMAX
WebCenter Portal
WebLogic Server
11X faster than x86
servers
4X faster encryption than
x86
6X better $/perf than
IBM
Oracle Database
2X faster and 36% lower TCO
than IBM
Enterprise Cloud Infrastructure
2X lower TCO than HP/VMware and IBM
Power/PowerVM
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
7X Faster Queries
4X Faster Data Loading
WebCenter Content
Lifecycle Content Management
Data Management
SAP
Enterprise Database Cloud
4X better price/performance
than IBM
Backup and Recovery
5X less cost & faster than Symantec
Optimized Solutions Optimize for Workloads
Database, Middleware and Applications
 For more information on workload optimization using Oracle Optimized
Solutions: www.oracle.com/optimizedsolutions
 For more information on SPARC T5: www.oracle.com/sparc
 For more information on the Oracle Solution Center:
www.oracle.com/osc
33
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
34
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
35
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Required Benchmark Disclosure Statement
Must be in SPARC T5 & M5 Presos with Benchmark Results (1 of 2)
Copyright 2013, Oracle &/or its affiliates. All rights reserved. Oracle & Java are registered trademarks of Oracle &/or its affiliates.Other names may be trademarks of their
respective owners..
TPC Benchmark C, tpmC, and TPC-C are trademarks of the Transaction Processing Performance Council (TPC). SPARC T5-8 (8/128/1024) with Oracle Database 11g Release
2 Enterprise Edition with Partitioning, 8,552,523 tpmC, $0.55 USD/tpmC, available 9/25/2013, New Order 90th% Response Time 0.410sec. IBM Power 780 Cluster (24/192/768)
with DB2 ESE 9.7, 10,366,254 tpmC, $1.38 USD/tpmC, available 10/13/2010, New Order 90th% Response Time 2.10 sec. IBM x3850 X5 (4/40/80) with DB2 ESE 9.7, 3,014,684
tpmC, $0.59 USD/tpmC, available 7/11/2011. IBM x3850 X5 (4/32/64) with DB2 ESE 9.7, 2,308,099 tpmC, $0.60 USD/tpmC, available 5/20/2011. IBM Flex x240 (2/16/32) with
DB2 ESE 9.7, 1,503,544 tpmC, $0.53 USD/tpmC, available 8/16/2012. IBM Power 780 (2/8/32) with IBM DB2 9.5, 1,200,011 tpmC, $0.69 USD/tpmC, available 10/13/2010.
Source: http://www.tpc.org/tpcc, results as of 3/26/2013.
 SPEC and the benchmark name SPECjEnterprise are registered trademarks of the Standard Performance Evaluation Corporation. Results from www.spec.org as of 3/26/2013.
SPARC T5-8, 57,422.17 SPECjEnterprise2010 EjOPS; SPARC T4-4, 40,104.86 SPECjEnterprise2010 EjOPS; Sun Server X2-8, 27,150.05 SPECjEnterprise2010 EjOPS; Cisco
UCS B440 M2, 26,118.67 SPECjEnterprise2010 EjOPS; IBM Power 780, 16,646.34 SPECjEnterprise2010 EjOPS. IBM PowerLinux 7R2, 13,161.07 SPECjEnterprise2010
EjOPS. SPARC T3-4 9456.28 SPECjEnterprise2010 EjOPS. SPARC T5-8 (SPARC T5-8 Server base package, 8xSPARC T5 16-core processors, 128x16GB-1066 DIMMS,
2x600GB 10K RPM 2.5. SAS-2 HDD, 4x Power Cables) List Price $268,742. IBM Power 780 (IBM Power 780:9179 Model MHB, 8x3.86GHz 16-core, 64x one processor
activation, 4xCEC Enclosure with IBM Bezel, I/O Backplane and System Midplane,16x 0/32GB DDR3 Memory (4x8GB) DIMMS-1066MHz Power7 CoD Memory, 12x Activation of
1 GB DDR3 Power7 Memory, 5x Activation of 100GB DDR3 Power7 Memory, 1x Disk/Media Backplane. 2x 146.8GB SAS 15K RPM 2.5. HDD (AIX/Linux only), 4x AC Power
Supply 1725W) List Price $992,023. Source: Oracle.com and IBM.com, collected 03/18/2013. SPEC and the benchmark name SPECjEnterprise are registered trademarks of the
Standard Performance Evaluation Corporation. Results from www.spec.org as of 5/1/2013. SPARC T5-8, 27,843.57 SPECjEnterprise2010 EjOPS; IBM Power 780, 10,902.30
SPECjEnterprise2010 EjOPS. Oracle server only hardware list price is $298,494 and total hardware plus software list price is $1,565,092 http://www.oracle.com as of 4/24/2013.
IBM server only HW list price is $835,555 and HW+SW cost of $2,174,152.00 and BM PowerLinux 7R2 server total hardware plus software cost of $819,451.00 based on public
pricing from http://www.ibm.com as of 4/24/2013.
SPEC & the benchmark name SPECjbb are registered trademarks of Standard Performance Evaluation Corporation (SPEC). Results as of 3/26/2013, see http://www.spec.org
for more information. SPARC T5-2 75,658 SPECjbb2013-MultiJVM max-jOPS, 23,334 SPECjbb2013-MultiJVM critical-jOPS. Sun Server X2-4 65,211 SPECjbb2013-MultiJVM
max-jOPS, 22,057 SPECjbb2013-MultiJVM critical-jOPS. Sun Server X3-2 41,954 SPECjbb2013-MultiJVM max-jOPS, 13,305 SPECjbb2013-MultiJVM critical-jOPS. SPARC T42 34,804 SPECjbb2013-MultiJVM max-jOPS, 10,101 SPECjbb2013-MultiJVM critical-jOPS. HP ProLiant DL560p Gen8 66,007 SPECjbb2013-MultiJVM max-jOPS, 16,577
SPECjbb2013-MultiJVM critical-jOPS. HP ProLiant ML350p Gen8 40,047 SPECjbb2013-MultiJVM max-jOPS, 12,308 SPECjbb2013-MultiJVM critical-jOPS. Supermicro X8DTN+
20,977 SPECjbb2013-MultiJVM max-jOPS, 6,188 SPECjbb2013-MultiJVM critical-jOPS. HP ProLiant ML310e Gen8 12,315 SPECjbb2013-MultiJVM max-jOPS, 2,908
SPECjbb2013-MultiJVM critical-jOPS. Intel R1304BT 6,198 SPECjbb2013-MultiJVM max-jOPS, 1,722 SPECjbb2013-MultiJVM critical-jOPS, HP DL980 G7 106,141
SPECjbb2013-MultiJVM max-jOPS, 23268 SPECjbb2013-MultiJVM critical-jOPS.
37
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.
Required Benchmark Disclosure Statement
Must be in SPARC T5 & M5 Presos with Benchmark Results (2 of 2)
Copyright 2013, Oracle &/or its affiliates. All rights reserved. Oracle & Java are registered trademarks of Oracle &/or its affiliates.Other names may be trademarks of their
respective owners..
Two-tier SAP Sales and Distribution (SD) Standard Application benchmarks SAP Enhancement package 5 for SAP ERP 6.0 as of 3/26/13:SPARC M5-32 (32 processors, 192
cores, 1536 threads) 85,050 SAP SD users, 32 x 3.6 GHz SPARC M5, 4 TB memory, Oracle Database 11g, Oracle Solaris 11, Cert# 2013009. SPARC T5-8 (8 processors, 128
cores, 1024 threads) 40,000 SAP SD users, 8 x 3.6 GHz SPARC T5, 2 TB memory, Oracle Database 11g, Oracle Solaris 11, Cert# 2013008. IBM Power 760 (8 processors, 48
cores, 192 threads) 25,488 SAP SD users, 8 x 3.41 GHz IBM POWER7+, 1024 GB memory, DB2 10, AIX 7.1, Cert#2013004. Two-tier SAP Sales and Distribution (SD) Standard
Application benchmarks SAP Enhancement package 4 for SAP ERP 6.0 as of 4/30/12:IBM Power 795 (32 processors, 256 cores, 1024 threads) 126,063 SAP SD users, 32 x 4
GHz IBM POWER7, 4 TB memory, DB2 9.7, AIX7.1, Cert#2010046. SPARC Enterprise Server M9000 (64 processors, 256 cores, 512 threads) 32,000 SAP SD users, 64 x 2.88
GHz SPARC64 VII, 1152 GB memory, Oracle Database 10g, Oracle Solaris 10, Cert# 2009046. SAP, R/3, reg TM of SAP AG in Germany and other countries. More info
www.sap.com/benchmark
 SPEC & benchmark names SPECfp, SPECint are registered trademarks of the Standard Performance Evaluation Corporation. Results as of March 26, 2013 from www.spec.org
and this report. SPARC T5-8: 3750 SPECint_rate2006, 3490 SPECint_rate_base2006, 3020 SPECfp_rate2006, 2770 SPECfp_rate_base2006; SPARC T5-1B: 467
SPECint_rate2006, 436 SPECint_rate_base2006, 369 SPECfp_rate2006, 350 SPECfp_rate_base2006. IBM Power 780 8-chip 3.92GHz: 2640 SPECint_rate2006. IBM Power
710 Express 1-chip 3.556GHz: 289 SPECint_rate2006.
TPC-H, QphH, $/QphH are trademarks of Transaction Processing Performance Council (TPC). For more information, see www.tpc.org, results as of 6/7/13. SPARC T5-4
409,721.8 QphH@3000GB, $3.94/QphH@3000GB, available 9/24/13, 4 processors, 64 cores, 512 threads; SPARC T4-4 205,792.0 QphH@3000GB, $4.10/QphH@3000GB,
available 5/31/12, 4 processors, 32 cores, 256 threads; SPARC Enterprise M9000 386,478.3 QphH@3000GB, $18.19/QphH@3000GB, available 9/22/11, 64 processors, 256
cores, 256 threads; SPARC Enterprise M9000 198,907.5 QphH@3000GB, $15.27/QphH@3000GB, available 12/9/10, 32 processors, 128 cores, 128 threads; IBM Power 780
QphH@3000GB, 192,001.1 QphH@3000GB, $6.37/QphH@3000GB, available 11/30/11, 8 processors, 32 cores, 128 threads; HP ProLiant DL980 G7 162,601.7
QphH@3000GB, $2.68/QphH@3000GB available 10/13/10, 8 processors, 64 cores, 128 threads. ; HP ProLiant DL980 G7 158,108 QphH@10000GB, $6.49/QphH@10000GB
available 4/15/13, 8 processors, 80 cores, 160 threads.
38
Copyright © 2013, Oracle and/or its affiliates. All rights reserved.