Water ressources system - Kementerian Pekerjaan Umum

Download Report

Transcript Water ressources system - Kementerian Pekerjaan Umum

Delivering Water to West
Jakarta
PALYJA
Presentation to CCF
By Philippe Wind, Technical Director
PALYJA
JUNE 2007
PhW / Palyja / June 07
PALYJA – Water Concession Company
established in 1998 for west Jakarta
• Private company, 50% Suez Environnement, 50% Astra
• Under concession contract with DKI, managed by PAM
• Full scope of service:
– Water treatment, distribution pipes Network, customer
– Deliver water to the people connected
– Standard “air bersi”
• Money collected used to pay all water costs:
– water resources
– operating costs
– Investments
PALYJA employs directly 1400 people, serve 380 000
accounts for around 2,5 million people. Produce 700
000 m3/day to deliver continuous supply at above 7,5 M
of pressure. PALYJA invest around 20 mio USD/year.
PhW / Palyja / June 07
Areas - DKI
PhW / Palyja / June 07
West tarum catchments
PhW / Palyja / June 07
Raw Water Supply from WTC
Cawang =
5.4 m3/s (Average)
4,7 m3/s (dry s.)
RAWWATER
TREATED WATER SOURCES
Bekasi =
19 m3/s (ave~wet s.)
17 m3/s (dry s.)
Cikarang =
26 m3/s (ave~wet s.~dry s.)
2
53 m3/s (Ave ~ wet s.)
50 m3/s (dry s.)
Target supply to PALYJA: 6.2 m3/s
1
PhW / Palyja / June 07
Jatiluhur Dam
West Tarum Canal–Bekasi River
PhW / Palyja / June 07
End of WTC at Cawang Offtake
PhW / Palyja / June 07
Water Resources & PALYJA WTP
Current + options
PhW / Palyja / June 07
WTP
Pipe Network
PhW / Palyja / June 07
Pipes and network
Customers
PhW / Palyja / June 07
Water Shortage in West Jakarta
Water supply by Areas
Network Pressure by Areas
Low Pressure
0 – 0.3
Medium
0.3 – 0.7
Not supplied in the
peak hours
Supplied only few
hours a day
Not supplied, no
water
High Pressure
0.7 – 1.0
PhW / Palyja / June 07
High Pressure
> 1.0
WATER DEMAND deficit and losses
• Current Demand fo JKT
m3/day
: 1.500.000
• Demand satisfaction : 79 %
• Unmeet demand
: 21 %
• Physical Losses
: 25 %
•Commercial losses
: 23 %
• Population growth
: 0.7 % per year
PhW / Palyja / June 07
Current Situation of Water Supply
Water User in PALYJA and TPJ Area :
Description
TPJ
PALYJA
DKI Jakarta
PAM
61,8%
53,7%
57,6%
Pumps
31,7%
37,9%
35,0%
Hydrants
6,5%
8,4%
7,5%
Water sources per Kotamadia year 2005
100%
80%
PAM
60%
Total
100%
100%
Pumps
100%
Hydrants
40%
20%
0%
Selatan
PhW / Palyja / June 07
Timur
Barat
Pusat
Utara
DKI
Current Situation of Water Supply
Pressure at House Connections :
PALYJA
TPJ
Area
Pressure
(bar)
%
North. Western
0 – 0.3
32%
Central Jkt
0.3 – 0.7
26%
Southern Jkt
0.7 – 1.0
42%
Northern Jkt
0 – 0.3
44.6%
Central Jkt
0.3 – 0.7
25.7%
Middle – Part
of Southern Jkt
0.7 – 1.0
29.7%
PhW / Palyja / June 07
Losses and continuity of service
• Commercial losses is a big part of total losses
• Lack of continuity of service strongly degrade
commercial losses as:
– Unhappy customer may seek for illegal connection
– Customer may modify his installation to get more
water and affect or bypass metering
– Management has more difficulties to differentiate
metering and bill anomalies from lack of supply
A minimum pressure above 7,5 M at connection level
will lead to continuous supply and bring strong
improvement in reduction of commercial losses.
PhW / Palyja / June 07
Water Quality and Drinking water
objective
• Drinking water status cannot be fulfilled without the
preliminary conditions :
– Full time pressurized network
– Decrease of physical losses
– Sufficient production facilities in stand-by to
provide treatment process improvement
(All these conditions are related to avoid
contamination of the network)
– Constant raw water quality
PhW / Palyja / June 07
Key issues for future
• estimated 20% water deficit between supply and
demand.
• Reduction of physical losses not enough to cover the
deficit, commercial losses represent water consumed.
• strong need to bring additional water resources to meet
water demand
• Increase in resources will lead to better continuous
supply that will improve quality and reduce losses
• several possibilities to get additional resources to
improve water service and meet demand for Jakarta
PhW / Palyja / June 07
Population demand
Hydrants
+ p - X%/year
Pumps
+ p - Y%/year
+ X%/year
+ p
Domestic connection
Official figure
+ Y%/year
+  LPCD
+ Z%/year
+ p - Z%/year
+  LPCD
Illegal users
Demand satisfied
PhW / Palyja / June 07
Water Demand
2005 Demand Pattern (m3/d)
2012 Demand Pattern (m3/d)
PhW / Palyja / June 07
2022 Demand Pattern(m3/d)
Water Resources potential projects
3
6
2
4
9
5
1
11
10
1.Cisadane Ext 300lps
2.Cikokol Ext 300lps
3.Teluk Naga 300 lps
4.Buaran+P.Gadung Ext 750lps
5.Buaran III 2500 lps
6.North WTP 1000 lps
7.Bogor Spring 1000 lps
8.Ciawi Dam 3000 lps
9.Extension WTC 2500 lps
10.Cisadane II 3000 lps
11. Jatiluhur 7000 lps
7
8
TRANS.PIPA
8
PhW / Palyja / June 07
WTP
Ciliwung
Pejompongan
Pulogadung
Buaran
Bekasi
6.4
4.2
Present
(2007)
Ciliwung
5
Bekasi
20.85
5.25
7.5
5.3
Present and
Future WTC
Raw Water
Abstractions
for PAM
Jakarta (m3)
Mid Term
2008-2010
Ciliwung
5
Bekasi
24.6
6.8
Note: Existing WTP capacities increased
7.5
5.3
Longer Term
(2012 > )
Ciliwung
5
Bekasi
29.8
PhW / Palyja / June 07
Note : * Assumes Buaran III WTP Implemented
12.0*
WEST TARUM CANAL
WTP Pejompongan
6.2 m3/s
WTP Pulogadung
JAKARTA
Pipelines
4.4 m3/s
Projected Separation
Projected
siphon
Cap. 30m3/s
Projected
Separation wall
END
Irrigation Area
17,477 ha
WTC
DesignCapacity
82m3/s
Projected
Projected
Separation Wall
siphon
al
5.5 m3/s
Bendung
Cikarang
Projected
Separation Wall
de
rC
an
WTP Buaran
Existing Cibeet
siphons
Irrigation Area
7,250 ha
Ci
be
et
Fe
e
Bendung
Bekasi
WTC Cap.
21.1 m3/s
Bendung
Cibeet
Ciliwung
Bekasi
Cikarang
Bendung
Curug
Curug Hydraulic
Pumping Station
Design Capacity
17 x 5.5 m3/s
Present Capacity
17 x 3.1 m3/s
ETC
Cibeet
Citarum
PhW / Palyja / June 07
Long term
PhW / Palyja / June 07
Alternative to study
WTP to locate
Tenjo
PhW / Palyja / June 07
SERANG and CILEGON
TANGERANG
TENJO
2.9
※ 5.5
Ciujung River
KSCS 1 : 9.1
P. PANJANG
6.2
6.2
SERPONG
※ 9.1
Ciuyah Tunnel
(Unit : ㎥/s )
Karian Dam (14.6)
WATER SUPPLY PLAN FROM KARIAN DAM
PhW / Palyja / June 07
Investment , legal and
economics
PhW / Palyja / June 07
Contractual Relationship
DPRD
Legislative
DKI Jakarta
Administration
Independent
PAM JAYA
Regulatory
Body
Co-operation Agreement
PALYJA
Transparent
Accountable
Customers
Economics and Tariff
R
General costs
K
FPPR :PAM Jaya,
RB, MOF, DKI
General costs
Financing
(OPEX & CAPEX)
T
C
CAPEX
OPEX
Costs
Water Charge
• Water Charge
Indexation
• Tariff Adjustment
based on
Tagihan
Governor DKI
Air
(Cashflow) Jakarta Decree
(PALYJA’s
Revenues)
Full-cost recovery
T=C+K+R
PALYJA Investments
PALYJA CAPEX BUDGET YEAR 2007
MIS 2%
Studies 3%
Office Equipment
0.4 %
Vehicle 0.2 %
Buildings 2%
Meters 7%
Production 33%
Connections 14%
NRW Action 4%
Distribution Network
15%
Primary Network 20%
PhW / Palyja / June 07
PALYJA : Potential & constraints
Get more Raw Water
Investment
Build pipes,
treatment
Financing cash flows
Operate and maintain
Inflation
Employees, knowledge
Tariff
Provide more water, increase coverage
Improve service, customers satisfaction
Reduce losses
PhW / Palyja / June 07
Manage costs
connections,
Conclusion
PALYJA is planning and implementing
necessary actions to improve service,
quality and coverage for west
Jakarta.
Additional water resources are
necessary but are possible with
involvement of all parties
Continuation of investment is needed
Impact on medium term will be
significant for population health and
well being
PhW / Palyja / June 07
Thank You !