Trends & Tools
Results of the PSA Survey 2005
Project Performance Improvement CoP
Augustus 2005
Book: Trends in Project Performance Improvement
Third survey into the PSA solutions market
Previous versions published in 1999 en 2001
The survey:
• 153 suppliers were invited (100%)
• 49 indicated they would participate
and have received the questionnaire (32%)
• 34 questionnaires were sent back (69%)
Questionnaire of over 900 questions!
Based on the PPI Process Reference Model
Six chapters with trends and developments
For each supplier a scorecard
PPI Competence Centre
1
34 scorecards
A scorecard per solution
Four categories:
•
•
•
•
Internal
External
Technical
Functional
PPI Competence Centre
2
Approach
All answers have been analysed and used in this publication. The answers have
been processed as follows:
• Breakdown into process areas and processes based on reference model.
• Each process received weight from 1 to 3, based on the relevance of that process for
the process area as a whole.
• Each question was given a weighting from 1 to 3, based on the relevance of the
question for the process.
• A “B-answer” counted for 4 points a “C-answer” for 1 (the function is only available by
using a custom field). A “N-answer” for 0 points.
Formula for calculating the scores.
• Answer * Question value * Process Value = Score for the question
Allocate resources
3
Reservations that have been made on a role level can be replaced by an
allocation of one or more individual resource by one single action of the
resource manager.
3
When replacing a role allocation, only the resources with that role are
shown in the pick list.
The resource manager can indicate the allocation of a resource on a
project in:
- the average percentage allocated for the lead-time of the project
It is possible to indicate on which specific days of the week a resource is
allocated on a specific project (for instance every Thursday and Friday of
a week).
It is possible to indicate to which allocation percentage the alloction of a
resource should be rounded up (for instance a round up of 25% indicates
that a resource can be planned in intervals of two hours ).
PPI Competence Centre
B
36
3
B
36
2
C
6
B
24
N
0
2
3
3
Some detailed findings (based on average results)
34% offer the functionality to change the start or end date of a project in the portfolio
view. So playing with scenarios (on a project level) is supported by a limited
number of solutions.
48% offer the possibility to use scheduling parameters to determine a programme
planning.
60% support what if planning on a project portfolio level. In 61% of the solutions a whatif planning can be compared with the original plan.
28% supports adjusting a multi-project planning by drag-and-drop.
>90% offer support for multiple rates per resource (cost 94%, billing 92%, internal 82%).
54% offer support for sorting a list of suitable resources by rate.
57% show the results per resource per selection criterion.
57% offer the possibility for the project manager to decide the level of time capturing
(project, phase, task).
Differences show on detailed, more complex questions.
PPI Competence Centre
4
Trends
Trends in the PPI market
Trend – Portfolio Management
Increasing interest in project prioritization. Scenarios are used to decide
on portfolios.
• Surprisingly only 71% supports assigning a priority to a project.
• Priority is used by 48% for planning multiple projects on a programme level.
• 60% supports saving scenarios for later comparison.
Increasing focus on formal business cases before starting a project.
• 65% support planning future cash flows
on a timescale.
Project transparency required on an
enterprise wide level.
• Traffic light reporting is supported
(budget 74%,risk 66%, progress 88%).
• Assigning a project to more than
one programme (by a %) is supported
by 43%.
PPI Competence Centre
6
Trend – Project based working is maturing
Increasing focus on formal programme management methods.
Organizations start to recognize programme management needs a
different approach from project management.
Programme and project manager
are more and more regarded as
a role instead of a post.
Programme Governance Offices
are positioned as line departments.
PPI Competence Centre
7
Trend – Focus on metrics and process management
Metrics to evaluate and manage projects and programmes become
more advanced.
• When planning a new project data from from previous projects can be reused. For
instance the roles needed (74%) and the average experience of the roles (60%).
Organizations are looking for support to register and track PM related
KPI’s.
• KPI’s per resource can be entered in
51% of the solutions.
Tools should support in easily
managing project processes and
procedures.
• 70% have workflow functionality.
• Only 48% offer the possibility to define a
loop in the workflow (which is quite basic).
PPI Competence Centre
8
Trend – Cost focus
Handling of invoices from external resources is changing to make it
cheaper.
• Reversed billing is supported by 63%.
Outsourcing of application management of PSA solutions.
• 88% of the solutions can be used with an Application Service Provider construction.
PPI Competence Centre
9
Scorecards
Scores of our partners
The scores of our partners
Augeo
Assistance
CRM
CRM
VWC
VWC
BDM
80%
PDM
80%
CAM
VWC
80%
CAM
HRM
0%
FAM
RAM
PIM
KDM
PDM
60%
CAM
PDM
40%
20%
HRM
0%
FAM
RAM
PIM
KDM
KDM
RAM
PIM
PEM
BDM
80%
20%
HRM
0%
FAM
PEM
VWC
40%
20%
20%
100%
BDM
60%
PDM
40%
40%
CRM
100%
BDM
60%
60%
CAM
KDM
CRM
100%
100%
Niku
Business Engine
HRM
0%
FAM
PEM
RAM
PIM
PEM
PCM
PCM
PCM
PCM
Solution score
Average score
Solution score
Average score
Solution score
Average score
Solution score
Average score
Mercury
CRM
80%
BDM
VWC
60%
PDM
80%
PDM
20%
20%
HRM
FAM
RAM
PEM
KDM
HRM
FAM
RAM
PEM
PCM
PCM
Solution score
Average score
Solution score
Average score
BDM
CAM
PDM
40%
20%
0%
PIM
80%
60%
60%
40%
0%
VWC
BDM
CAM
40%
PIM
100%
100%
CAM
KDM
CRM
CRM
100%
VWC
Tenrox
Microsoft EPM
PPI Competence Centre
KDM
HRM
0%
FAM
RAM
PIM
PEM
PCM
Solution score
Average score
11
USP and PoI for Assistance
Assistance
Unique Selling Points:
Graphical OBS
A delegate can be appointed for
timesheet approval per part of the
organisation
100% score on administrate ledger
Graphical GUI for creating
workflows
CRM
100%
VWC
BDM
60%
CAM
PDM
40%
20%
KDM
Points for Improvement:
No calendars
No role hierarchy
A project manager cannot execute
what if analysis
It is not possible to drag and drop a
project in a general (overall)
planning
No full text search on documents.
80%
HRM
0%
FAM
PPI Competence Centre
RAM
PIM
PEM
PCM
Solution score
Average score
12
USP and PoI for Augeo
Augeo
Unique Selling Points:
Adjust portfolio planning by drag &
drop
Graphical OBS
CRM
100%
VWC
80%
BDM
60%
CAM
PDM
40%
Points for Improvement:
No internal cost rate for a resource
Changes in a generic calendar do
not effect a resources calendar
No Gantt Chart available via webaccess.
VWC and FAM
20%
KDM
HRM
0%
FAM
RAM
PIM
PEM
PCM
Solution score
Average score
PPI Competence Centre
13
USP and PoI for BEN
Business Engine
Unique Selling Points:
Graphical OBS
A delegate can be appointed for
timesheet approval per part of the
organisation
100% score on administrate ledger
CRM
100%
VWC
80%
BDM
60%
CAM
PDM
40%
20%
Points for Improvement:
No CRM
No KPI’s on resource level
No role hierarchy
No full text search on documents.
KDM
HRM
0%
FAM
RAM
PIM
PEM
PCM
Solution score
Average score
PPI Competence Centre
14
USP and PoI for Clarity
Niku
Unique Selling Points:
Adjust portfolio planning by drag &
drop
A matching percentage per criterion
A delegate can be appointed for
timesheet approval per part of the
organisation
CRM
100%
VWC
BDM
60%
CAM
PDM
40%
20%
KDM
Points for Improvement:
Limited number of project priorities
The project manager cannot
determine the level for time
capturing (project, phase, task)
A document has to be saved
multiple times in database to link it
to more than one object.
80%
HRM
0%
FAM
RAM
PIM
PEM
PCM
Solution score
Average score
PPI Competence Centre
15
USP and PoI for Mercury ITG
Mercury
Unique Selling Points:
A matching percentage per criterion
100% score on (fixed) asset
management
Graphical GUI for creating
workflows
CRM
100%
VWC
80%
BDM
60%
CAM
PDM
40%
20%
KDM
Points for Improvement:
No effective date for a rate change.
It is not possible to request a certain
level of expertise.
HRM
0%
FAM
RAM
PIM
PEM
PCM
Solution score
Average score
PPI Competence Centre
16
USP and PoI for Microsoft EPM
Unique Selling Points:
Microsoft EPM
Document can be added by drag &
drop.
CRM
100%
Points for Improvement:
VWC
No rate per client, no billing rate
No programme level
No ideas
No support for Adapt Portfolio
No end date for a resource
Project ID’s cannot be generated
automatically
A project cannot be set to the state
closed.
It is not possible to drag and drop a
project in a general (overall)
planning.
80%
BDM
60%
CAM
PDM
40%
20%
KDM
HRM
0%
FAM
RAM
PIM
PEM
PCM
Solution score
Average score
PPI Competence Centre
17
USP and PoI for Tenrox
Unique Selling Points:
Tenrox
Adjust portfolio planning by drag &
drop
Rate of a resource can be used as a
matching criterion
Document can be added by drag &
drop.
Graphical GUI for creating
workflows
CRM
100%
VWC
80%
BDM
60%
CAM
PDM
40%
20%
KDM
HRM
0%
Points for Improvement:
FAM
FAM
RAM
PIM
PEM
PCM
Tenrox answered the questionnaire combined
with the possibilities Microsoft EPM offers.
PPI Competence Centre
Solution score
Average score
18
At 50% of your customers the system is implemented by:
- yourself (the supplier or reseller of the system)
- the client themselves
- an implementation partner
- an independent service provider
IT
G
ic
ro
so
ft
Te
nr
ox
M
ur
y
er
c
M
rit
y
la
C
EN
B
A
ug
eo
ce
is
ta
n
ss
A
O
Implementation
ve
ra
l
lA
ve
ra
g
e
Who implements?
73,5%
17,6%
50,0%
2,9%
Luckily most of our partners work for 50% or more of their
implementations with an implementation partner.
PPI Competence Centre
19
Purpose of the survey and the book
Collect and update data about the functional coverage of PSA solutions.
Useful for acquisition and selection projects.
Propagate our thought leadership
To be used in maintaining relations and create new opportunities.
Erwin Dunnink
Project Performance Improvement
Capgemini Nederland B.V.
P.O. Box 2575
3500 GN Utrecht
Mobile + 31 6 1503 0434
[email protected]
PPI Competence Centre
20