ITER The past, present and future 1985 to 2007 Garry McCracken What is ITER? • ITER is a design for a nuclear fusion experiment to demonstrate the feasibility of a fusion power plant. • First proposed as a collaboration between the US and the Soviet Union by Ronald Reagan and Mikhail Gorbachev at a Summit meeting Geneva 1985 • The experiment is jointly funded by China, Europe, India, Japan, Korea, Russia and the US representing more than half the population of the world What is Nuclear Fusion? • Nuclear fusion is the reaction between two nuclei to form a larger one. When the mass of the product nucleus is less than the mass of the two original nuclei the excess mass is released as energy + 4 MeV + 3.3 MeV » + 17.6 MeV + 18.3 MeV Key reaction Nuclear Fusion Power Plants • Assuming that the problem of plasma confinement would be solved the design of fusion power plants was considered very early in the international fusion program • A patent for a fusion power plant was filed in 1946 by GP Thomson and M Blackman of Imperial college London. • In the 1950’s Lyman Spitzer at Princeton NJ considered the design of a fusion reactor • In the late 1960’s after the success of the Soviet tokamaks there were many attempts to design tokamak reactors, particularly in the US and the UK Conceptual fusion reactor Fusion Reactor Lithium Lithium blanket Primary Fuels Deuterium D+T plasma Tritium Deuterium Tritium Reprocessing of gases Helium + hydrogen w aste gases Vacuum Exhaust Gases -Deuterium, tritium hydrogen , helium Electricity grid Heat exchanger Turbine Steam Generator G enerator Attempts to produce fusion power on earth • Fusion reaction occur in the sun because gravity holds the reacting particles close enough together for the reaction to occur • On earth man first succeeded in producing the reaction in the hydrogen bomb in 1952 This destructive approach is of no use for generating useful power • Instead we have tried to produce the reaction in a controlled manner by using magnetic and electric fields. Experiments started in the late 1940’s and have continued to the present day. • Early successes were the Soviet tokamaks (1960’s) • The first demonstration of controlled DT fusion reactions was in 1991 on the European tokamak JET. About 1 MW was produced for aver 1 second Tokamak Principles Confinement is produced by the combination of toroidal field produced by external coils and a poloidal field produced by a current in the plasma Experimental fusion power production JET and TFTR have demonstrated fusion reactions. The maximum power achieved was 16 MW The value of Q=Power out/power in =0.6 Q in ITER is planned to be 10 The INTOR programme • INTOR was the first international attempt to design a fusion reactor • In the late 1970’s 3 large tokamaks were being designed JET, TFTR and JT60 • IAEA proposed a workshop in Vienna with US, USSR, JA and EU • This defined a reactor design with S/C magnets, T breeding, remote handling and materials testing, 1980 • DESIGN had R=5m, a=1.2m Ip=8-10 MA Scaling confinement time from experiments to ITER Origins of ITER • Velikhov, Gorbachev and Mitterand • Regan -Gorbachev summit, Geneva Nov 1985 • Japan and Europe invited to join a 4 party programme to build a reactor • IAEA invitation to Vienna workshop March 1987. Report produced and Joint Working site at Garching(Germany) agreed President Reagan, Gorbachev Geneva Summit, 1985 Designing ITER • Conceptual design 1988-90 • Engineering design 1992-94 (Rebut) • Engineering design 1994-98 (Aymar) • Redesign 1998-2001 (Aymar) Problems over siting design team • 3 sites proposed • Japan Naka (External components) • Europe Garching, Germany (Internal comp.) • USA San Diego (Integration) Three joint sites agreed. This led to a complicated structure and a lot of travelling Engineering Design 1992-94 Director Paul-Henri Rebut (centre) Deputy directors(from left) Valery Chuyanov (RF), Michel Huguet (EU) Ron Parker (US), Yasuo Shimomura (JA) Robert Aymar Director (1994-2003) Comparison of JET and ITER JET is the largest presently existing tokamak JET R=3m Ip=4MA ITER R=6.2m Ip=15MA Central Solenoid Nb3Sn, 6 modules The 2001 ITER design Cryostat 24 m high x 28 m dia. Toroidal Field Coil Nb3Sn, 18, wedged Vacuum Vessel 9 sectors Poloidal Field Coil Nb-Ti, 6 Major plasma radius 6.2 m Port Plug heating/current drive, test blankets limiters/RH diagnostics Plasma Volume: 840 m3 Plasma Current: 15 MA Typical Density: 1020 m-3 Typical Temperature: 20 keV Fusion Power: 500 MW Machine mass: 23350 t (cryostat + VV + magnets) - shielding, divertor and manifolds: 7945 t + 1060 port plugs - magnet systems: 10150 t; cryostat: 820 t Seven Large Projects to study manufacturing • • • • • • • Central solenoid coil (Nb/Sn S/C) L1 Toroidal field coil (Nb/Sn S/C) L2 Sector of the vacuum vessel L3 Blanket module L4 Divertor cassette L5 Blanket remote handling system L6 Divertor remote handling system L7 Magnets and Structures Superconducting. 4 main subsystems: •18 toroidal field (TF) coils produce confining/stabilizing toroidal field; •6 poloidal field (PF) coils position and shape plasma; •a central solenoid (CS) coil induces current in the plasma. •correction coils (CC) correct error fields due to manufacturing/assembly imperfections, and stabilize the plasma against resistive wall modes. Vessel, Blanket and divertor The double-walled vacuum vessel is lined by modular removable components, including blanket modules, divertor cassettes, and diagnostics sensors, as well as port plugs for limiters, heating antennae, diagnostics and test blanket modules. All these removable components are mechanically attached to the VV. The total vessel/in-vessel mass is ~10,000 t. These components absorb most of the radiated heat from the plasma and protect the magnet coils from excessive nuclear radiation. The shielding is steel and water, the latter removing heat from absorbed neutrons. A tight fitting configuration of the VV to the plasma aids passive plasma vertical stability, and ferromagnetic material “inserts” in the VV located in the shadow of the TF coils reduce toroidal field ripple and its associated particle losses. Safety and Environmental Characteristics •ITER will be a precedent for future fusion licensing •Work towards internationally accepted basic principles and safety criteria for fusion energy •Interact with regulatory experts to ensure ITER options can be licensed in any Party Parameters of the ITER designs Conceptual ŅFinalÓ (1990) (1998) P lasma major radius (m) 6.0 P lasma width at mid-plane (m) 2.15 Elongation (rat io of plasma height to width) 1.98 Toroidal field on plasma axis (T) 4.85 Nominal maximum plasma current (MA) 22 Nominal fusion power (MW) 1000 Pulse length more t han (s) 200 Number of toroidal field coils 16 2 Neut ron wall loading (MW/m ) 1.0 Divertor double 8.1 2.8 1.6 5.7 21 1500 1000 20 1.0 single Redesign (2001) 6.1 2.0 1.7 5.3 15 500 400 18 single The Rebut design in 1994 had 24 field coils but was otherwise similar to the 1998 design Political aspects • 1998-2001 US withdrawal, no site offered • June 2001, Canadian site proposed • June 2002 JA offers Rokkasho, EU offers Caderache and Vandellos -- now 4 sites! • EU withdraws Vandellos, CA withdraws • Jan 2003 China joins, US rejoins, KO joins • Washington meeting to decide site ends in stalemate • 2003-2006 Battle between EU and JA for site Proposal for a broader approach Agreement on the Caderache site Signing the treaty, Paris, 21 November 2006 The ITER buildings today Cadarache, near Aix-en-Provence, France ITER collaboration •For its size and cost and the involvement of virtually all the most developed countries, •representing over half of today world’s population ITER will become a new reference • term for big science projects. •The ITER project is one of the world’s biggest scientific collaboration. The ITER organization ITER Director-General Dr Kaname Ikeda (Japan) Deputy Director General and Project construction leader Dr Norbert Holtkamp EU Deputy Director Generals Gary Johnson US Tokamak Kim KO, Engineering, Fuel cycle Carlos Alhedre EU Safety, Environment Valery Chuyanov RF Fusion Science Wang CN Administration, Finance Dhijaj Bora (IN) Control Diagnostics and Heating Proposed ITER Site Layout Staff Planning Staff Ramp Up IO Team 700 600 Number 500 400 Sum PPY: 1800 Sum Support: 2760 Sum Total 300 200 100 0 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Calendar Year Indicative Construction Schedule Fig .I-4 .2 -1 Overa ll Co nstructio n Schedule NSSR RE GU L AT ORY A PPR OVAL Construction A greement SITE LIC ENSE M onths C ONSTR UC TION LIC ENSE 12 0 24 36 48 60 72 84 96 108 EX C AVATE CONST RUC T I ON Purcha s e orde r B UILD TOKAM AK B U ILDING HV A C ready SITE FAB R IC ATION B UILD IN G OTHER B UILDIN GS PFC s ite fabrica tion build. TO KAM AK ASSEM B LY C omplete VV torus Pla ce firs t TF/VV in pit Ins ta ll cryos ta t bottom lid Complete B lanket/ Divertor Installation Ins ta ll C S Pla ce low er PFC SY STEM STA R TUP & TESTING ST ART UP & COM M I SSI ONI NG INTEGR ATED C OM M ISSIO NIN G C omplete lea k & pres s ure te s t M agne t excitation 1ST PLASM A PR OCURE M E N T PR OC UR EM ENT O F M AGNETS Firs t purc ha s e order PFC fa b. s tart TFC fa b. s ta rt La s t PFC complete C S fab. s ta rt La s t TFC comple te P ROC URE ME N T OF V V S E CTORS , B LA NK E T & D IV E RTOR VV 1s t Sec tor La s t VV C S fab. comple te Indicative Operation Schedule C ons tr uc tio n Phas e 1st yr 2nd yr 3rd yr 4th yr 5th yr 6th yr 7th yr 8th yr 9th yr 10th yr M i le Stone Firs t Plas ma Install ati on & Commi ssioning Bas ic Ins talla tion - Commissioning Full Fie ld , C ur rent & H /C D Pow er Sho rt D T Bur n Q = 10, 500 MW Q = 10, 500 MW , 400 s Full No n-indu c tiv e C ur rent D riv e For ac tiv ation ph as e - Achieve good vacuum & wall condition For hig h duty oper ation U pgr ade H Plas ma Phase D Phase Firs t D T Pla sma Phase O peration - Machine commissioning with plasma - Heating & CD Expt. - Reference scenarios with H Equi val ent Number of Burn P ulses (500 M W x 440 s*) Low D uty D T - Development of full DT high Q - Developmentt of non-inductive operation aimed Q = 5 - Start blanket test 1 750 1000 - Improvement of inductive and non-inducvtive operation - Demonstration of high duty operation - Blanket test 1500 2500 3000 0.006 MW a/m2 F luence** Blanket Test H igh D uty D T - Commissioning w/neutron - Reference w/D - Short DT burn Sys tem C heckout and C ha ract reriz ation - Electro-magnetic test - Hydraulic test - Effect of ferritic steel etc. - Neutronics test - Validate breeding performance 3000 0.09 MW a/m2 Performance Te st - Short-time test of T breeding - Thormomecanics test - Preliminary high grade heat generation test, etc. - On-line tritium recovery - High grade heat generation - Possible electricity generation, etc. * The bu rn time of 440 s inc ludes 40 0 s flat top and eq uiv alent time w hic h additio nal flux is c ounted dur ing ramp- up and r amp-d ow n. ** Av er age Fluenc e a t Firs t W all (N eu tr on w all load is 0.56 MW/m2 in a v era ge and 0.77MW /m2 at outboa rd midplane.) Why is ITER important? Features •Virtually inexhaustible power •No CO2 emissions •High energy density fuel –1 gram D-T = 26000 kW·hr of electricity (~10 Tonnes of Coal !!) •Inherently Safe Controllability –low fuel inventory, ease of burn termination, self-limiting power level –No chain reaction to control –low power and energy densities, large heat transfer surfaces and heat sinks Issues •Fusion reaction is difficult to start and maintain –High temperatures (Millions of degrees) required –Technically complex & LARGE devices are required The Broader Approach • During the JA-EU discussions over ITER site a “Broader Approach” was suggested. • This now has 3 parts – International Fusion Irradiation Facility (IFMIF) – International Fusion Research Centre – Advanced S/C tokamak at Naka Japan The research centre will work on DEMO Provisional future programme year 0 5 2005 Todays expts. 10 2010 upgrade, construct ITER 20 2020 H&D operation construction low-duty D-T operation 35 2035 2040 40 45 2045 2050 TBM: checkout and characterisation high-duty D-T operation second D-T operation phase TBM performance tests & postexposure tests blanket optimisation plasma performance confirmation EVEDA (design) 30 2030 plasma issues licensing IFMIF 25 2025 operate technology issues (e.g. plasmasurface interactions) mobilisation 15 2015 construction single beam plasma optimisation operation: priority materials other materials testing materials characterisation materials optimisation construction phase 1 DEMO(s) conceptual design engineering design blanket design licensing operation phase 1 blanket construction phase 2 blanket design licensing phase 2 blanket construction &installation operation phase 2 licensing design confirmation plasma confirmation Commercial Power plants conceptual design engineering design licensing construction operate Project Schedule (2006) LICENSE TO CONSTRUCT ITER IO 2005 2006 2007 Bid 2008 TOKAMAK ASSEMBLY STARTS 2009 2010 2011 2012 2013 2014 2015 2016 EXCAVATE Contract TOKAMAK BUILDING OTHER BUILDINGS Construction License Process First sector Complete VV TOKAMAK ASSEMBLY Install PFC cryostat MAGNET Bid Install CS COMMISSIONING Vendor’s Design Contract VESSEL Complete blanket/divertor Bid Contract PFC TFC CS fabrication start First sector Last TFC Last sector Last CS Cryoplant buildings Magnet power convertors buildings The ITER site The Hot cell Tokamak building Tritium building Cooling towers The site will cover about 60 ha, with buildings over 170m long