Transcript Slide 1
WP 3 Case Studies Ed Brinksma AMETIST Task 3.1 Cybernétix Case Study Work has concentrated on the version including faulty cards: verification of proposed solution (LIF and CYR) solution by control synthesis (LIF and CYR) playing-in/playing-out scenarios (WIS) stochastic analysis of faulty production (UT) AMETIST Task 3.2 Terma Case Study Refinement of existing work: extended version (SDRAM details) (AAU) automated resconstruction (Uppaal with bit-state hashing) of manual buffer-size scheduling solution by WIS. (AAU) AMETIST Task 3.3 Bosch Case Study New case study (airbag safety) presented by Bosch in June: KUN and VERIMAG will make very limited investment (+/- 1 PM) for suggesting a first approach. Bosch will study usability of TA technology for safety-critical applications, and test generation. AMETIST Task 3.4 Axxom Case Study Main focus of case study efforts: competitive results on full problem (AAU,KUN,UT,Axxom) work on new version at VERIMAG AMETIST Task 3.5 Miscellaneous Case Studies ASML case study (Uppaal, KUN) biphase mark protocol (Uppaal, KUN) settop box protocol (Uppaal, UT) AMETIST Outlook Quantitative assessment on Axxom case study versions and job-shop scheduling problems, possibly including the Cybernétix case study. AMETIST