Transcript RSRDC
RSRDC UNIT-II JODHPUR ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH JASPAL SINGH ACCOUNTANT SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL KUMAR MATHUR ARE SH. AJIT JAIN ARE SH. SHANTI CHAND ARE SH. MAHENDERA SINGH DEORA ARE (E) SH. SANJAY NARAIN MATHUR JEN Financial Work Load in Unit Rs. 4985.71 Lacs S. No. Name of Work ARE – I SHRI ASHOK KUMAR MATHUR 1 2 ARE – II Client Deptt. A& F Sanction Expenditure till date Balance Work Strengthening & DEV. PAL ROAD MDM CIRCLE BORANADA UIT/JDA JODHPUR UDD/01/07/Dt 2407-07 OF RS. 51.60 CRORE 29.00 CRORE 22.60 Crores INDOOR STADIUM UIT/JDA JODHPUR LT. NO. 1848-56 LACS DT. 23.03.07 RS. 172.40 LACS 108.71 lacs 63.69 lacs 898.05 LACS 776.95 LACS 121.10 LACS Sh.Rakesh Chandra Mathur 1 Constt. Of USQ & LSQ at PTS Jodhpur Police Deptt. (Govt of Raj) 2 Constt. Of LSQ& USQ at RAC Ist Ballalion (Mandore Campus ) Jodhpur Police Deptt. (Govt of Raj) Constt. Of LSQ & USQ at RPTC Jodhpur Police Deptt. (Govt of Raj) 3 Financial Work Load in Unit S. No. ARE – III 1 ARE – IV Name of Work Client Deptt. Rs. In Lacs A& F Sanction Expenditure till date Balance Work OIL India Ltd 850.04 lacs 254.14 lacs 595.90 lacs Sh.Shanti Chand Mathur Construction of OIL HOUSE at Jodhpur Sh.Nirmal Mathur 1 Construction of ROB in lieu of LC No. C-27 at Pali. State Govt.(PWD) 1200.00 lacs 26.36 lacs 1173.64 lacs 2 Residencial Boys School Kenpura Pali. REIS 223.76 lacs 204.17 lacs Work Completed & handed over to client in the month of June 09. State Govt.(PWD) 1000.00 lacs 159.52 lacs 840.48 lacs 250.69 lacs 197.06 lacs Work Completed & handed over to client in the month of June 09. ARE – V 1 ARE – VI 1 ARE – VII 1 Sh.Ajit Jain Construction of ROB in lieu of LC No. 134-B at Abu Road. Sh.Mahendra Singh Deora Elect work of all work of unit II Jodhpur Sh. Sanjay Narain Mathur Residencial Boys School Mandore Jodhpur REIS Important Works Completed during last 5 years Civil and architectural work in superstructure of main power house building at GLTPP BARMER DATE OF START 18-2-05 DATE OF COMP 17-5-06 WORK IS COMPLETED COST OF WORK 449.61 LACS Important Works Completed during last 5 years AREA DEVELOPMENT WORK SUCH AS WATERSUPPLY,SEVERAGE,ROAD AND DRAINAGE WORK IN VARIOUS RESIDENTIAL COLONIES &DEVELOPMENT OF LAND FILL SITES AT JODHPUR PACKAGE JOD-ST-O5 DATE OF START 3-2-03 DARE OF COMP 3-9-06 COST 454.88 LACS Residential Boys School Mandore Jodhpur Total Cost : Location : Date of Start : Stipulated Date of Completion: Expenditure till Date : Likely Completion date : Bottlenecks if any : Rs. 250.69 Lacs Residential Boys School Mandore Jodhpur 27.06.08 26.02.09 Rs. 197.06 lacs Work Completed. Important Works Completed during last 5 years ROB Rashala Road Jodhpur Completion Cost – Rs. 10.14 Crs. Residential Boys School Kenpura Pali. Total Cost Location : : Date of Start : Stipulated Date of Completion: Expenditure till Date : Likely Completion date : Rs. 223.76 Crores Construction of ROB in lieu of LC No. C-27 at Pali. 27.06.08 26.02.09 Rs.204.17 lacs Work is Completed. Indoor Stadium Jodhpur Total Cost : Location : Date of Start : Stipulated Date of Completion: Expenditure till Date : Likely Completion date : Bottlenecks if any : Rs. 172.40 Crores Jodhpur 04.07.07 03.01.08 Rs. 108.71 lacs On the availability of fund Funds are not made available by JDA Strengthening & Dev. Pal Road MDM Circle to Boranada Jodhpur Total Cost : Location : Date of Start : Stipulated Date of Completion: Expenditure till Date : Likely Completion date : Bottlenecks if any : Rs. 51.60 Crores Jodhpur 01.02.09 Rs. 2900.00 lacs On the available of fund Funds are not made available by JDA Construction of LSQ&USQ at PTS Jodhpur Total Cost Location Date of Start Stipulated Date of Completion Expenditure till Date Likely Completion date : : : : : : Bottlenecks if any : Rs. 4.366 Crores RPTC Campus Jodhpur 01.04.08 28.02.09 Rs. 332.03 lacs 31.12.09 Construction of LSQ&USQ at RPTC Jodhpur Total Cost Location Date of Start Stipulated Date of Completion Expenditure till Date Likely Completion date : : : : : : Bottlenecks if any : Rs. 2.35 Crores RPTC Campus Jodhpur 01.04.08 28.02.09 Rs. 244.56 lacs 31.12.09 Construction of LSQ&USQ at RAC Ist Battalion Jodhpur Total Cost Location Date of Start Stipulated Date of Completion Expenditure till Date Likely Completion date :Rs. 2.27 Crores : RPTC Campus & RAC Campus Jodhpur : 25.02.08 : 24.01.09 : Rs. 200.36 lacs : 31.12.09 Bottlenecks if any : Construction of “OIL HOUSE” at Jodhpur Total Cost : Rs. 8.50 Crores Location : Construction of “OIL HOUSE” at Jodhpur Date of Start : 22.07.08 Stipulated Date of Completion : 21.01.10 Expenditure till Date : Rs. 254.14 lacs Likely Completion date : 30.04.10 Bottlenecks if any : 1. Some decisions about RCC designs and finishing work are pending from OIL India Ltd. 2. Approval for subletting of some works like Aluminum and fire fighting is pending 3. Tenders for Electrical and AC works are not finalised. Construction of ROB in lieu of LC No. C-27 at Pali. Total Cost Location : : Date of Start : Stipulated Date of Completion: Expenditure till Date : Likely Completion date : Bottlenecks if any : Rs. 12.00 Crores Construction of ROB in lieu of LC No. C-27 at Pali. 19.10.08 18.10.09 Rs. 26.36 lacs Work is temporarily suspended. Revised A&F is required Construction of ROB in lieu of LC No. 134-B at Abu Road. Total Cost Location : : Date of Start : Stipulated Date of Completion: Expenditure till Date : Likely Completion date : Bottlenecks if any : Rs. 10.00 Crores Construction of ROB in lieu of LC No. 134-B at Abu Road. 12.09.08 11.09.09 Rs. 159.52 lacs 30.06.10 GAD was revised by RAILWAY delayed the work by 2 month . Some qty Steel supplied didn’t confirm to specifications and had to be replaced by supplier three times so work delayed by 3months.. BAR CHART FOR Construction of ROB in lieu of LC No. 134-B at Abu Road. DEC 09 ABUTMENT A2 ABU ROAD SIDE APPROACH ABU ROAD SIDE ABATMENT A1 (AMBAJI SIDE) APPROACH AMBAJI SIDE SERVICE ROAD AMBAJI SIDE SERVICE ROAD ABU ROAD SIDE DRAIN ABU ROAD SIDE DRAIN AMBAJI SIDE WMM, BT ABUROAD SIDE WMM BT AMBAJI SIDE P,A1 SPAN SUPPER STRACTURE P5,A2 SPAN SUPPER STRACTURE ROAD FURNITURE JAN 10 FEB 10 MAR 10 APRIL 10 MAY 10 JUNE 10 Proposed New Works S. No. Name of Work Client Deptt. Mode Estimated Cost 1 ROB Barmer LC-325 State Govt. (PWD) Actual plus GAD under approval THANKS