DESIGN AND APPLICATION OF THE POWER PLANT
PERFORMANCE MONITORING AND EVALUATION SYSTEM
(PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI 1
(PERİDSİS)
Customer Foundation:
ELECTRICITY GENERATION COMPANY (EÜAŞ)
Administrator Foundation:
YILDIZ TECHNICAL UNIVERSITY (YTU)
Executive Foundations:
YILDIZ TECHNICAL UNIVERSITY (YTU)
TUBITAK-MAM
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI 2
(PERİDSİS)
Support Program :
TUBITAK 1007
Public Institutions Research Funding
Program
Start date
01.03.2011
Ending date
01.03.2013
Project duration
24 Months
Project budget
2.636.627 TL
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI 3
(PERİDSİS)
WHAT IS PERFORMANCE MONITORING SYSTEM?
Performance monitoring system of power plant states evaluation of plant
production capacity and efficiency with measured data at that time.
Performance monitoring is a system which shows decrease of plant’s and
equipment performances to the operator.
GAZ TÜRBİNİ
Beklenen
Performans
Beklenen
Değer
Gerçek
Performans
Anma
Değeri
MWe
Ölçülen
Değer
T ölçülen
T ref
Giriş Sıcaklığı
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI
(PERİDSİS)
AIM OF THE PROJECT
Aim of this project is to design of a power plant performance monitoring and
evaluation system and to implement it to a plant.
Power plant performance monitoring and evaluation system monitors
mechanical, hydraulic and thermodynamic parameters, which are measured
and affects of them to the plant’s performance. System also compares the real
performance of the plant with the reference performance criterias.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI 5
(PERİDSİS)
AIM OF THE PROJECT
• To inform the operator about the real performance levels of the equipments
by using the data taken from monitoring and evaluation system of the
plant’s .
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI 6
(PERİDSİS)
AIM OF THE PROJECT
• To diagnose the problems about the power
plant performance.
• To determine the parameters that cause
degradation of the performance.
• To
represent
fast,
easy and
human
independent solutions to the operator.
• To help the operator for generating a
planned maintenance program on the
equipment basis.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI 7
(PERİDSİS)
AIM OF THE PROJECT
• To determine the causes of possible boiler pipe deformations and to
increase the power production ability of the plant.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI 8
(PERİDSİS)
AIM OF THE PROJECT
• To create an infrastructure for designing of local power plant monitoring
system that is possible to apply for all plants.
• To maintain a local performance monitoring system which will be installed
by Turkish companies.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI 9
(PERİDSİS)
SCOPE OF THE PROJECT
• To design a local monitoring and evaluation system for Ambarlı Combined
Cycle and Yatağan Coal Fired Power Plants.
• To implement this system to Ambarlı Combined Cycle Power Plant.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI10
(PERİDSİS)
SCOPE OF THE PROJECT
• Investigating of available performance monitoring systems all over the
world.
• Investigating the relevant standards.
• Preparing the simulations of the power plants.
• Determining the equipment which affect the performance and their effect
45
levels.
10
5
49
Ara
Kızdırm
a
OBT
35
ABT
34
2
11
3
42
4
12
6
7
8
4
9
46
30
28
55
47
43
29
52
1
44
12 ata Kol.
46
Kazan
48
31
13
27
Gland
Buharları
YBT
6
14
32
7
8
33
9
41
26
23
24
22
21
20
19
15
16
18
39
36
37
38
25
40
17
51
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI11
(PERİDSİS)
SCOPE OF THE PROJECT
• Determining the performance of equipment at different working conditions
• Developing an economic model which calculates the cost of the degradation
of equipment and all plant.
• Investigating the existing measurement devices and their locations, and
determining the need of new measurement tools.
• Determining the locations of new measurement tools and planning of their
installations.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI12
(PERİDSİS)
SCOPE OF THE PROJECT
• Investigating the causes of the boiler pipe failures and increasing the power
production ability of the plant.
• Preparing a software that will help the operator. This software will;
– show and compare the expected performance of equipment and overall
plant.
– show the reasons, effects and possible solutions that causes
degradation of the equipment.
– calculate the cost of degradations.
• Installing, testing, calibrating and submitting of the developed performance
monitoring system to the Ambarlı Combined Cycle Power Plant.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI13
(PERİDSİS)
OUTPUTS OF THE PROJECT
Outputs of the projects:
• Design of the power plant performance monitoring and evaluation system
• Software of the power plant performance monitoring and evaluation system
• Application of the power plant performance monitoring and evaluation system
• The essential specification for the installation of the system
• Design guide and algorithms of the monitoring system
• List of the parameters that affect the plant performance and their impact
analyses.
• Economic analysis for performance degradation of the equipment.
• Deformation analysis of boiler pipes.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI14
(PERİDSİS)
OUTPUTS OF THE PROJECT
• Designed system will;
– monitor of the power plant with real time graphics.
– maintain possibility of performance monitoring on the basis of
equipment to the operator.
– compare the existing performance with expected performance.
– Diagnose and give the solution offers before the problems come into
existence in the plant.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI
(PERİDSİS)
CONTACT:
Assoc. Prof. Dr. Hasan Hüseyin ERDEM
YILDIZ TECHNICAL UNIVERSITY
DEPARTMENT OF MECHANICAL
ENGINEERING
Beşiktaş/İSTANBUL
Tel: +90 212 3832907
e-mail: [email protected]
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI
(PERİDSİS)