Major Projects - PNWA – Pacific Northwest Waterways

Download Report

Transcript Major Projects - PNWA – Pacific Northwest Waterways

2008 PNWA Annual Meeting
New Member Introductions
David Brown, Kennedy Jenks Consultants
John Engber, Strategies 360
Brian Monaghan, Wildlands, Inc.
Kennedy/Jenks Consultants
Kennedy/Jenks Consultants
 Established in 1919 in San Francisco
 One of the first consulting engineering firms
headquartered west of the Mississippi River
 600 employees in 25 offices
Portland Office
 Office started 12 years
ago to serve an existing
client
 Today – full service,
serving both private and
public clients
 Continues to grow – 60+
staff
 High employee retention
Clients
Water Environment
Water
Wastewater
Industrial
Manufacturing
Food & Beverage
Redevelopment
Recycled Water
Transportation
Railroads
Airports
Marine Ports
Federal
NPS, GSA, USFS, Navy,
COE
Port of Tacoma
Blair/Hylebos Redevelopment – Road, Rail, & Infrastructure Project
Stormwater Planning and Design
Woodburn, Oregon Water System
Emergency
Gen erato r
Transform er
Surge
Tank
Well 9
Well House
Treatment
Building
Finished
Water Reservoir
Pressure
Filters (4)
Waste
Solids MH
Backwash
Recovery
Tank
Filter
Drain
Holding
Tank
Water supply, treatment, storage, and distribution
Overflow
Det ention Pond
Boeing Process Facilities
Port of Seattle, STIA
Industrial Waste System (IWS) – Process, Treatment, Trenchless Technologies
Burlington Northern Railway Co.
Pierce County, Washington
Reclaimed Water planning and design
Kern Water Bank Authority
Kern County, California
Expansion of Water Banking Operations
New conveyance structures, turnouts, channel/highway
crossings, pump station, metering structure
Water
Rio Vista Water Treatment Plant
Santa Clarita, California
Water Treatment Planning and Design
3 advanced processes (ozone as primary disinfectant, high-rate
contact clarification, and high-rate filtration) in one efficient, costeffective treatment process
Water
San Francisco International Airport
San Francisco, CA
Utility Tunnel and Infrastructure Improvements
Use of utility corridors to plan and design 8 major underground utility systems
Relocation/design of water distribution, sewer, drainage, natural gas, industrial
waste sewer, telecommunications, diesel fuel, and power systems
Planned facility outage to avoid service interruptions
Reno-Sparks WWTF
Cities of Reno and Sparks, Nevada
Facility Expansion Project
Planning and design of compact, cost-effective, energy-efficient facility expansion to double
capacity from 20 to 40 mgd
Use of advanced treatment processes – PhoStrip for phosphorus removal, and fluidized bed
biological treatment for denitrification
Increased treatment capacity without damage to extremely sensitive downstream ecosystem
Baylands Park
City of Sunnyvale, Santa Clara
County, California
Water Conservation and Reuse
An award-winning, 185-acre recreational facility with water conservation features and potable
and recycled water distribution systems
On-site management of storm water runoff to irrigate freshwater wetlands
Reclaimed water used to irrigate landscape, constructed wetlands, and wildlife habitats
Dulzura Conduit
City of San Diego, California
Restoration of Antiquated Aqueduct System
Renovation/replacement of an 85-year-old aqueduct system through 11 miles of rugged terrain
Restored flow to original 40-MGD capacity (potential expansion to 60 MGD)
50% of original projected capital cost/O&M savings up to $20 million/year
Innovative helicopter construction, use of state-of-the-art materials
Rio Vista Intake Pump Station
Castaic Lake Water Agency
Water Supply Pump Station
Design/construction management of 90 mgd (ultimate 120 mgd) capacity pump station
84” to 102” diameter pipes to convey raw water from Castaic Lake to the Rio Vista WTP
Braced structural steel, moment-resisting frame building designed to withstand seismic forces
Noise attenuating insulation and sound baffles to minimize noise of pumps
McCarran International Airport
Las Vegas, Nevada
Runway Improvements Design
Existing 5,000-foot general aviation runway converted to 9,976-ft.-long commercial runway with
2 parallel taxiways, 4 high-speed taxiways, and 5 cross taxiways
Underground drainage system to provide drainage away from the pavement
Owner-involvement in design team and design decisions
Harbor Island
City of Seattle, Washington
Fast-track Superfund Storm Drain Cleanup
Fast-track cleanup of Harbor Island’s 5-mile network of storm drains
Identification of past and current contaminant sources, storm water sampling, removal of
contaminant sources and storm drain sediments, and follow-up source tracing
Total project cost of $500,000, far less than most Superfund cleanups
Golden Gate Bridge
San Francisco, California
Lead Contamination Removal
Cleanup of historic lead contamination in construction areas to allow seismic retrofit work
Management of remediation of lead-impacted soil under bridge approaches
Review of plans, specs, bids, and contactor submittals, and completion of lead cleanup
activities, soil samples; and paint debris compliance sample and analysis plan