Summary
The intention of this presentation is to
provide viewers a general understanding
of the program,
For more specific information, viewers
should visit the website and download
the SGIP Handbook.
Overview
SGIP is a statewide program, initiated by
Assembly Bill 970 and modified in 2004 by
AB1685.
Provides incentive funding for distributed
generation technologies, including:
Micro-turbines
Photovoltaic (solar power)
IC engine generators
Fuel cells
Wind turbines
Overview
SGIP was originally a four year program
(2001 - 2004), then was extended thru
2007.
Incentives reserved up to 12 months
Reservations granted first come, first
served
No Double-Dipping:
Single projects are not allowed to receive
incentives from more than one source: SCE,
SoCalGas, PG&E, SDREO or CEC.
Overview
Four administrators:
SoCalGas
Southern California Edison (SCE)
Pacific Gas & Electric (PG&E)
San Diego Regional Energy Office (SDREO)
Who is Eligible?
Customers of SoCalGas, SCE, PG&E,
SDG&E (IOUs)
ESCO’s, with clients (at host sites
above)
Customers served by both municipal
utility and IOU:
LADWP & SoCalGas
IID and SoCalGas
Incentives
Incentives are based technology &
Incentive Level:
Level 1, Level 2, Level 3R, Level 3N
Levels defined on following pages
Each Level has its own funding limits
Incentives are based on:
$/kw basis
Incentive funding from other sources may
reduce the SGIP incentive (see Handbook
for further details)
Incentives – Level 1
Incentive
Levels
Eligible
Technologies
Incentive
Offered
($/Watt)
Minimum
System
Maximum
Size
System Size
Maximum
Incented System
Size1
Level 1
Renewable fuel
cells
$4.50/W
30 kW
5 MW
1 MW
Level 1
Photovoltaics
$3.50/W
30 kW
5 MW
1 MW
Level 1
Wind Turbines
$1.50/W
30 kW
5 MW
1 MW
Up to 25% of fuel may by be Non-Renewable (fossil fuel). Data measured, collected & reported to
CPUC every 6 months.
Incentives – Level 2
Incentive
Levels
Level 2
Eligible
Technologies
Non-Renewable
fuel cells
Incentive
Offered
($/Watt)
$2.50/W
Minimum
System
Maximum
Size
System Size
None
5 MW
1. These technologies must install waste heat recovery.
2. These technologies must meet a set of reliability criteria requirements.
Maximum
Incented System
Size
1 MW
Incentives – Level 3-R
(Renewable Fuel)
Incentive
Levels
Eligible
Technologies
Incentive
Offered
($/Watt)
Minimum
System
Maximum
Size
System Size
Maximum
Incented System
Size
Level 3-R
Renewable fuel
micro-turbines
$1.30/W
None
5 MW
1 MW
Level 3-R
Renewable fuel IC
engines and Large
gas turbines
$1.00/W
None
5 MW
1 MW
1. Up to 25% of fuel may by be Non-Renewable (fossil fuel). Data measured, collected & reported to
CPUC every 6 months.
Incentives – Level 3-N
(Non-Renewable Fuel)
Incentive
Levels
Eligible
Technologies
Incentive
Offered
($/Watt)
Minimum
System
Maximum
Size
System Size
Maximum
Incented System
Size
Level 3-N
Non-renewable &
waste gas fuel
micro-turbines
$0.80/W
None
5 MW
1 MW
Level 3-N
Non-renewable &
waste gas fuel IC
engines and Large
gas turbines
$0.60/W
None
5 MW
1MW
1.
2.
These technologies must install waste heat recovery and meet emission criteria.
These technologies must meet a set of reliability criteria requirements.
Project Eligibility
Eligible
Equipment/site connected to the grid
Offset a portion, if not all, of site’s electric
load
Must serve on-site electric load
Not Eligible
Wheeling electricity
Sites with interruptible electric service
Over the fence applications
Equipment Eligibility
Eligible
Equipment must be
new and permanent
Projects < 5,000 kW
Customer’s side of
the utility meter
Not Eligible
Demonstration units
Backup generation
equipment
Equipment intended
to wheel power
Diesel fired
equipment
Thermal load
equipment
Absorption chillers
Thermal storage
Batteries
Other Incentive Funding
Funding from only 1 SGIP Administrator
per project allowed
Combined incentive cannot exceed out-of-pocket
expenses
Funding is allowed from other programs, however
the SGIP incentive shall be reduced
When other incentives are involved, the SGIP
incentive will be reduced by the following
percentage:
Level 1
50%
Level 2
60%
Level 3-R
60%
Level 3-N 70%
Incentive Example
Assumptions:
Level-1, 80 kW, PV
Other funding - $80,000 (80 kW/ $80,000 = $1.00/W)
Incentive by kW:
Other funding = $1.00/W
Reduction of SGIP Incentive = 50% of $1. 00 = $0.50
Incentive - $3.00/W (SGIP - $3.50 less $0.50) +
$1.00 (other) = $4.00/W
The Funding Process
Steps by Applicant / Host
Steps By SoCalGas (Administrator)
Step 1 - Applicant
Submitting an Application
Complete Reservation Request Form with original
signatures
System description
SoCalGas bill
Electric utility bill w/ peak kW
Estimated installed cost
Sizing calculations
Spec Sheets
If applicable –
Waste heat calculations
Reliability criteria
Renewable Fuel Report
Waste gas Report
Step 2a - SoCalGas
SoCalGas reviews application package
for:
Completeness
No Double-dipping
Customer status
Sizing
Overall eligibility
Step 2b - SoCalGas
Completed applications receive
Conditional Reservation Letter to
Applicant stating:
Reservation #
Funding amount
60-Day Project Advancement Date
Project Completion Date
Project size & technology
Project location
Step 2c – SoCalGas
Incomplete applications:
Request additional / missing documentation
Applications not meeting eligibility
requirements receive letter denying
access to the program
Step 3 - Applicant
60-Day Project Advancement
Proof of:
submittals:
Air quality permit application
Utility interconnect application
P.O. or contract for major equipment
Project Cost Breakdown
Standard SGIP Contract with original signatures
Certificates of insurance – (Host & Applicant)
Renewable Fuel Affidavit (if applicable)
Waste Gas Affidavit (if applicable)
Step 4 - SoCalGas
Review of 60-Day Project Advancement
documents
Incomplete: documents will be requested
by Administrator
Complete: Administrator mails letter
confirming reservation
Step 5 - Applicant
App./Host submits Claim Form with:
AQ permit to operate (if applicable)
Letter from utility authorizing host to parallel
Final building inspection report
Final Project Cost Breakdown & Affidavit
Proof of Payment
Proof of Warranty
AQ District Determination of net benefit (3-W)
Substantiation of Load (future load projects)
Planned Maintenance Letter (L-3 > 200kW)
Step 6 - SoCalGas
SoCalGas reviews Claim Form package for
completeness
Incomplete: documents will be requested by
Administrator
Complete: schedule a site inspection for
verification
Check is sent to Applicant/Host after site
verification and Claim Package has been
certified
More Information?
Go to:
www.socalgas.com/business/selfgen/
Program Handbook
Forms
Instructions
Spreadsheets
Project Cost Breakdown
Waste heat analysis
E-mail: [email protected]
Questions?
Questions can be emailed to:
[email protected]