Jordan water company(miyahuna)
Download
Report
Transcript Jordan water company(miyahuna)
Content:
Brief on Jordan water company(miyahuna)
WSP in Jordan (National vision)
Importance of WSP in Miyahuna
Zai water supply System
Zai –Dz12 supply system WSP development steps
Outcomes, lessons learned and overcome constrains &
difficulties
WSP future in Miyahuna
Jordan Water Company – Miyahuna was established in 2007 as
limited liability company in accordance to companies law No .
22 for 1997 .
Miyahuna is fully owned bay Water Authority of Jordan (WAJ).
Roles and responsibilities are regulated within an assignment
agreement, approved by Jordon Cabinet (Decision No 3175
dated 9/1/2007) for duration of 99 years
Miyahuna provided water & wastewater services to (2.6) million
citizens .
Water Quality
Miyahuna laboratories holds both national
accreditation (JAS) and international accreditation
(UKAS) according to ISO 17025 /2005.
(101) chemical ,physical & microbiological tests are
applied at Miyahuna central labs in 2011.
The percentage of compliance in 2011 for
microbiological tests is 99.9% ,physical & chemical
tests comply with Jordan water standards for
drinking water .
Miyhuna Water Resources
ZAI W ate r Tre atme nt
Plant
41%
Exte rnal Source s
7%
W e lls & O the r
Tre atme nt Plants
26%
Zara De salination Plant
26%
WSP in Jordan
National vision
Miyahuna participate in WSPs as apart of
Jordan vision to implement the concept
Water Safety Plan In Jordan
National vision
In 2006 Jordan was chosen as the first country from the Eastern
Mediterranean Region to develop a demonstration project for WSP
with WHO support
MoH , WAJ and Miyahuna considered the WSP as a sustainable
quality management approach for the continuous delivery of safe
drinking water.
All related bodies agreed to develop the WSP at (Wadiessir)to
be piloted to other water supplies in Jordan in fulfillment of the
national Vision “for full implementation of water safety
plan in all water supply systems in Jordan
In 2012 five demonstration WSPs were Developed in
different area which was one of several activities of a Joint
Program (JP) named “Adaptation to Climate Change to
Sustain Jordan’s MDG Achievements,” launched by four UN
agencies working in Jordan, namely UNDP, WHO-CEHA,
FAO, and UNESCO. The JP aims at protecting human health
against water
MIYAHUNA participated in development WSP for Zai
Water Treatment Plant System and one of distribution zone
in Amman(DZ12)(project under progress) .
Other utilities participation:-
Importance of WSP in Jordan
&Miyahuna
Project objective
Importance of adaptation WSP in
Jordan &Miyahuna
In addition to the general benefits of WSP .
Jordan is one of the fourth poorest country in the world with
respect to drinking water resources .
In Amman governorate the water resources available is
149(lt/cap/day) while the amount of water delivered to the
domestic consumers is 79( lt/cap/day ) .
Many of raw water resources are out side the country which need
more concentration in identifying the risks and decide a
preventive measures .
High Cost of water production and distribution mainly within
miyahuna service area(1USD/M3) .
SO ..Efficient water resources utilization is a must ,WSP consider
as one of the important tool to increase the efficiency of water
supplying system and providing the customer s with a safe water.
Zai water supply System
Why Zai Water System & Distribution Zone
(DZ12 ) ?
Zai Treatment Plant is largest source of water in Amman capital city
and it’s the largest water treatment plant in Jordan(250,000 m3 /day).
40% of Amman governorate water from Zai in addition to 50% of Balqa
Governorate.
Raw water sources of Zai system are out side the country while raw
water quality fluctuating increasing the quality hazards .
DZ12 is part of 44 water distribution zone in Amman and its included in
the plan to have more comprehensive pilot plans ,able to be expanded
to cover Miyahuna service area .
Zai –Dz12 supply system
WSP development steps
Documentation
WSP Development
steps
Preparatory steps
Description of water supply system
System assessment
Determine existing control measures
Prioritize risks
Identify additional or improved control measures
Validation
Supporting programs
Identify hazards
Controlling hazards
Implement and maintain control measures
Establish operational monitoring
Define corrective actions
Verification and auditing
7/17/2015
19
Scope of the Water Safety Plan at Zai Water System
(Boundary identification)
Zai WTP System
was selected in
addition to
water
Distribution
Zone No 12 (DZ
12) Amman
Water Safety Plan Work Boundaries
The WSP Boundaries were Defined and consisted of the following :
Responsibilities & contribution in management
of water supply
1. WAJ : is responsible to ensure that drinking water
distributed to consumers is safe and complies with the
Jordanian Standards.
2. MOH : is responsible by law for conducting surveillance
programs on all types of drinking water to ensure its
safety and compliance with national health standards
and it is empowered with authority to prevent
distribution of unsafe water.
3. Miyahuna : is responsible for treating water and
wastewater and producing water that complies with the
Jordanian Regulations and Standards.
7/17/2015
22
DZ 12 Zone
Hazard list :
EXPOSE Example:
EXPOSE Example Con’t:
EXPOSE Example Con’t:
Improvement Plan:
Improvement Plan Con’t:
Outcomes, lessons learned and
overcome constrains &
difficulties
Outcomes of Zai WSP
The product is :
A Full WSP developed covering all aspects of the supply chain
from the catchment until the customers tap.
A national & local reference WSP document in both languages
Arabic & English developed to be used and circulated to the rest
of the Kingdom and for Miyahuna.
The beginning of building capacity ( national WSP experts).
Circulate the experience to more staff at all levels through
conducting awareness presentations for related parties.
Learned Lessons and Benifits
Drinking water safety plan is important to confirm
Miyahuna interests and high culture, to ensure pumping
water complying with water specifications.
Better understanding of the Zai-DZ12 chain water supply
deeply and effectively through:
1. Full organized Documentation of a comprehensive and
integrated water system in all its parts.
2. Highlighting the risk areas and weaknesses in the water
system.
3. Direct Zai-DZ12 concerns to improve the system.
Achieve cooperation between all related bodies contribute
to the management of the water supply.
Improved communication and collaboration between WSP team
members.( WSP is not additional work but a new way of planning and
undertaking current work, change attitude by staff) and stakeholders(
understand their ability to influence the outcomes)
Increased awareness, knowledge, and understanding( management
procedure, identify gaps)
Increased acceptance of WSP methodology
Increased capacity building and training within the company ( staff &
management)
Improved management of water supply system (learn to know your
system)
Improved documentation and implementation of SOPs
Improved monitoring (operational & verification)
Butter traging of investment
Overcome Constrains& Difficulties
1. Large volume of work ,which requires more time and effort
to accomplish the requirements of the plan.
Activate Team work
Organizing the work load of WSP team
Ongoing institutional support and
high management commitment.
2. Lack of knowledge of risks assessment and management
WHO suported the project technically by holding three technical
training workshops the first in ( 25-29 September 2011 under the
name “ Advocacy and training “by Oliver Schmoll & Bettina
Ricket) the second in(13-17 November 2011 under the name “
System Assessment and operational Management” by Bettina
Ricket) the third in( 15-19 January 2012, under the title “System
Validation” by Oliver Schmoll & Bettina Ricket)
Technically & Professionally supported by WSP facilitators
(external advice and review)
Initial training at all staff levels by (design training programme for
the 11 modules to prepare and implement WSP by Riyada)
3. Overlapping roles and lack of clarity in the responsibilities
of the Parties on the management of water supply system.
Achieve and improve cooperation and communication between
all related bodies contribute to the management of the water
supply (catchment to consumer)
4. Team work
Technical WSP team with robust mandate from management:
Strong leadership
Regular meetings
Ongoing institutional support
Steering committee support
5. Out of date for some procedures and documents & Lack of
accurate maps
Formalize and organize procedures
Gaps’ identified in System documentation
To be incrementally addressed in future updates
6. Obtaining information on the various plan requirements
from the competent authorities.
Activating team work
Team Wide and Different expertise
Authorization to contact
Steering committee follow up
Identifying and engaging external stakeholder
WSP future in Miyahuna
Zai system WSP is an important step
towards expanding WSP in all Miyahuna
supplying systems within Miyahuna
service area and the other water utilities .
WSP Policy Statement Jordan Water Company-Miyahuna
Miyahuna water company is seeking to provide the customers under its
jurisdiction with safe water at all times by adopting the world best
management practices namely; the Water Safety Plan framework as required
by the World Health Organization (WHO) Guidelines for Drinking –Water
Quality issued in 2011and in accordance to the concepts enclosed in the
WHO, IWA Manual / Step-by-step risk management for drinking-water
suppliers.
The company Goals are:
1-Adopt the preventative drinking water quality management system that relies
on risk identification, assessment and management along the water supply
chain from catchment to consumer in close collaboration with the
concerned stake holders.
2-Incremental scale up in the adoption of WSP framework in accordance with
the company’s priorities and allocated resources until all the water supply
systems operated by the company are managed in accordance to the WSP
approach.
Future Steps :
1- Assigning new team including a project coordinator and
documentation administrator
2- Prepare a plan for review and implementing WSP (Zai –
Dapouq DZ12)
3- Monitoring and evaluation of WSP (Zai –Dapouq DZ12)
4- Prepare a plan for expansion in implementation of WASP
Concept
5- Regular meetings for the team
Thank You