KMG Drilling Presentation 2010

Download Report

Transcript KMG Drilling Presentation 2010

Upstream Business Unit
ROMPETROL DRILLING & WORKOVER
2010
1
Drilling & Workover Division
Rompetrol Drilling & Workover Division (RDW) is a member of:
• International Association of Drilling Contractors (IADC) since 1985
• Romanian Association of Drilling Contractors (RADC).
RDW, implemented an integrated management system for quality
assurance, environmental protection and HSE, according to ISO
9001-2008, ISO 14001-2004 and OHSAS 18001-2007.
Drilling & Workover Division
Services Portfolio
•
•
•
•
•
•
•
•
•
•
Drilling oil, gas and water wells.
Well completion and workover.
Running casing and tubing strings.
Mudlogging services.
Mud engineering and consultancy for drilling and workover.
Refurbishing and maintenance of rigs.
Equipment and tools rental.
Pumping, testing operations and water wells sand cleaning.
Rig management.
Manpower provider.
Drilling & Workover Division
Brief History
• Over 35 years of experience in providing cost effective,
expert labor and professional services to the international
oil and gas industry.
• Over 550 wells drilled in Syria, Algeria, Egypt, Iraq,
Jordan, Libya, Sudan, Greece.
• Over 210 workovered wells in Libya.
• Mudlogging services in Holland, Tunisia, Moldova,
Denmark, Hungary, Bulgaria, Libya, Offshore Black Sea,
Romania.
• Consultancy for drilling and workover in Algeria, Iraq,
Jordan, Greece, Ecuador, India, Libya.
• Consultancy for mudlogging in Kazakhstan, Senegal,
United Kingdom, Sudan, Armenia.
Drilling & Workover Division
Drilling and Workover Achievements
Clients and Partners
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
SONATRACH , Algeria
GENERAL PETROLEUM CO, Egypt
IRAQ NATIONAL OIL COMPANY
SYRIAN PETROLEUM CO
SOUTH OIL CO. , Iraq
NATURAL RESOURCES AUTHORITY, Jordan
REPSOL OIL OPERATIONS, Libya
KUWAIT OIL CO
PETROLEUM PRODUCTION & UTILIZATION PROJECT, Sudan
HELLENIC PETROLEUM, Greece
DATALOG TECHNOLOGY LTD., North Sea
LASMO GRAND MAGHREB, Libya
VEBA OIL OPERATIONS, Libya
BOSNA-S OIL SERVICES, Libya
PETROPRODUCCION, Ecuador
YPC, Yemen
ONGC, India
Drilling & Workover Division
Locations
TRIPOLI Headquarters
KREMCO K160 Rig
AWBARI Base &
KREMCO K100 Rig
TW 125 Rig
Drilling & Workover Division
Drilling & Workover Assets
Depth
Description
Work
over
Drilling
Maximum
Hook
Load
m
m
tons
350
FA - 25
Manufacturer
Present
location
20
UPET Romania- 1985
Libya
KREMCO
100
3,650
2,000
100
National Oilwell - DRECO
- CANADA - 1998
Libya
KREMCO
160
6,000
2,500
160
National Oilwell - DRECO
- CANADA - 1997
Libya
TW 125 CA - A6
4,800
2,200
125
UPET Romania – 2005 2006
Libya
WILSON 42
B 500
6,000
2,000
157
WILSON - USA
Ecuador
WILSON 42
B 500
6,000
2,000
157
WILSON - USA
Ecuador
COOPER
550 LTO
6,000
2,000
150
COOPER - USA - 1989
Ecuador
Offshore
Mudlogging
Unit
1 unit
Datalog Technology
Romania
Onshore
Mudlogging
Unit
2 units
Datalog Technology
Romania and
abroad
Drilling & Workover Division
Drilling equipment capabilities
Description
Depth
Work over
Drilling
Maximum
Hook Load
m
m
tons
350
20
FA - 25
KREMCO 100
3,650
2,000
100
KREMCO 160
6,000
2,500
160
TW 125 - CA - A6
4,800
2,200
125
WILSON 42 B 500
6,000
2,000
157
WILSON 42 B 500
6,000
2,000
157
COOPER 550 LTO
6,000
2,000
150
Kremco 100
Kremco 160
TW 125 – CA – A 6
Drilling & Workover Division
Mudlogging equipment capabilities
Drilling parameters Monitoring
• User configurable displays
• User configurable screen plots
• User configurable charts
•
•
•
•
•
•
•
•
•
•
Database Reporting
Automatic time and depth databases
User configurable logs
Export to remote QLOG databases
ASCII export to 3rd party databases
Real time monitoring and historical
record of over 300 parameters
All rig parameters and functions
Hydraulics
Trip monitoring
Pore pressure
Geological parameters such as normalized gas
LWD-MWD Data importing
Drilling & Workover Division
Mudlogging screen
Drilling & Workover Division
Operations and work experience
Item
Denomination of project/ contract
Client
Completion period
1
Drilling 2 wells with one F – 320 – 3 DH rig, maximum
depth 5,000 m.
SYRIAN PETROLEUM CO.
Damascus-SYRIA
1975 - 1977
2
Drilling 180 onshore oil wells with10 (ten) F –320 – 3 DH
rigs, maximum depth 5,000 m.
SONATRACH - Algiers,
ALGERIA
1976 - 1984
3
Drilling 22 onshore oil wells with one F –320 – 3 DH rig,
maximum depth 3,500 m
GENERAL PETROLEUM CO.
Cairo - EGYPT
1981 - 1987
4
Drilling onshore oil wells with 4 (four) F –200 – 2 DH rigs,
maximum depth 2,500 m
IRAQ NATIONAL OIL CO.
Baghdad - IRAQ and NORTH
OIL COMPANY - Kirkuk IRAQ
1982 - 1990
5
Drilling onshore oil wells with 2 (two) F –320 – 3 DH rigs
(maximum depth 5,000 m) and work over services with 2
(two) F – 100 – DH rigs
SOUTH OIL CO. Basrah IRAQ
1982 - 1990
Drilling & Workover Division
Operations and work experience – cont’d
Item
Denomination of project/ contract
Client
Completion
period
6
Drilling works with two F200 – 2 DH rigs
DEP GREECE
1976 - 1982
1986 - 1990
7
Drilling works with one F - 125 rig
DEP GREECE
1982 - 1984
8
Mud logging operations with one DATALOG mud logging
unit
NATIONAL WORKOVER AND
DRILLING CO
Tripoli, LIBYA
1996
9
Association contract for carrying out work over
operations in Ecuador with 3 work over rigs
GEOPETSA S.A., Quito, ECUADOR
1996 – until now
10
Mud logging operations in Holland with one mud logging
unit type DATALOG
DATALOG Technology Ltd. UK
1996
11
Mud logging operations in Moldova
DATALOG Technology Ltd. UK
1996
12
Mudlogging operations in DENMARK with one mudlogging
unit type DATALOG.
DATALOG Technology Ltd., UK
October 1998
January 2002
Drilling & Workover Division
Operations and work experience – cont’d
Item
Denomination of project/ contract
Client
Completion period
13
Drilling 3 water source wells & 2 exploratory wells with
KREMCO K160 rig, with the depth range of 1,200 m to
1830 m.
REPSOL OIL OPERATION,
Tripoli, LIBYA
Dec.24, 2000 –
Sept.30, 2001
14
Drilling 3 water wells & worked over 2 water wells with
KREMCO K 160 rig, with the depth of 600 m.
LASMO GRAND MAGHREB
LTD.,
Tripoli, LIBYA
April 21, 2002 – June
21, 2002
15
Drilling & completion of ground beds for cathodic
protection system, 5 wells with FA 25 rig, with depth of
230 m.
BOSNA - S OIL SERVICES
Co., Tripoli, LIBYA
2002
16
Work over services performed with KREMCO K 100 rig
with depth of 2,150 m.
REPSOL OIL OPERATIONS,
Tripoli, LIBYA
January 24, 2002
In progress
17
Drilling of 6 water wells with T 50 rig, with maximum
depth of 600 m.
TASHRIKIAT EL YANABIA,
Tripoli, LIBYA
Started in December
2001 –
May 2003
18
Work over services performed with KREMCO K 160 at
wells with total depth of 4,500 – 5,000 m
VEBA OIL OPERATIONS,
Tripoli, LIBYA
Started in 28 February
2003;
In progress
19
Running casing services, as Baker Oil Tools
Subcontractor
Repsol Oil Operations &
REMSA
Started in November
2005;
In progress
Drilling & Workover Division
Operations and work experience – cont’d
Item
Denomination of project/ contract
Client
Completion
period
20
Mudlogging services with Rompetrol’s unit
STERLING RESOURCES, UK
2005
21
Mudlogging services with Rompetrol’s unit
EXXOIL, Tunisia
2005
22
Mudlogging services with Rompetrol’s unit
TOREADOR RESOURCES
CORPORATION, USA
2006, now in
progress
23
Manpower Consultancy Agreement to provide Data
Engineers and Mudloggers on Saturn Jack Up
DATALOG Technology Ltd. UK
2005-2008
24
Mudlogging services with own units
OMV Petrom; Ascent Resources;
2008-now in
progress
Drilling & Workover Division
Quality Policy Statement
• For the achievement of the goals and objectives, established through
the contract and the company status, DRILLING & WORKOVER
DIVISION management aims to consolidate the leader position in
performing drilling & work over services and other special operations
at the oil, gas and water wells and also as a reliable partner for its
traditional clients from the country and from abroad. In this meaning,
we aim to act for:
• Anticipation and fulfilment of the client’s requirements, as well as
overcoming their expectations each time.
• Permanent improvement of the working way in order to deliver the
best products and services, fast and with efficient costs compared to
those of our competitors.
• For that matter we promote a quality policy that aims:
• Process management, focusing on results and permanent
improvement, with accent on the client-supplier relationship.
• Measuring and monitoring the satisfaction degree of our clients,
regarding the products/services that we give, thus being always
prepared to act towards the increasing of their satisfaction.
Drilling & Workover Division
Strengths
• Strong relationship with our customers.
• Highly professional, competent and motivated
staff.
• Perform quality drilling, workover and oilfield
services at competitive prices.
• Sustainable policy of investments to upgrade the
rigs and related equipment.
• ISO 9001, ISO 14001 and OHSAS 18001
certification.
Drilling & Workover Division
Future Plans
• To continue and develop the relationship with the
traditional clients, making efforts to continuously
improve our performance;
• To earn new clients through our excellent
performance, quality and safe services;
• To upgrade our fleet with new rigs, in order to satisfy
the market demands.