(Mostly) micro-hydro
(mostly) in Thailand
Chris Greacen
SEI micro-hydro
Guemes Island
23 Oct 2008
Outline
• Ph.D. topic -- government/village microhydropower in Thailand
• Very Small Power Producer (VSPP)
• Pico-hydros in Thailand
Villagers: ‘our power plant’
Local manufacture
Average cost: micro-hydro vs. grid for 25
years of electricity to a remote household
$1,600
$1,400
$1,200
$1,000
High
Low
$800
$600
$400
$200
$0
Microhydro
Grid
Source: Microhydro data from construction costs of existing microhydro projects from Panya Consultants Co. (1993). Kroonggaan Padtana Fai Faa Palang
Naam Radap Muu Baan (Village Scale Microhydro Development Projects). Bangkok, Thailand, Department of Energy Development and Promotion
Grid costs from Price Waterhouse CoopersPrice Waterhouse Coopers (2000). Review of Electric Power Tariffs National Energy Policy Office of Thailand -- Final
Report -- Annexes H-R. Bangkok, Thailand.
Number of villages served
micro-hydro vs. the grid (as
claimed)
80000
68464
70000
60000
50000
40000
30000
20000
10000
0
59
Micro-hydro (DEDP)
Grid (PEA)
Source: PEA Annual Report 2000; DEDP “mini and microhydopower”
Thailand
topography and
micro-hydro site
locations
How well do micro-hydro installations
work in the field in Thailand?
40
35
No PEA, 3
30
25
20
No PEA, 16
15
PEA arrived, 31
10
5
PEA arrived, 9
0
Microhydro in operation
Abandoned
Of 59 systems installed, less than half still in operation
9/23/01 0:00
9/18/01 0:00
9/13/01 0:00
9/8/01 0:00
9/3/01 0:00
8/29/01 0:00
8/24/01 0:00
8/19/01 0:00
8/14/01 0:00
8/9/01 0:00
8/4/01 0:00
7/30/01 0:00
7/25/01 0:00
7/20/01 0:00
7/15/01 0:00
7/10/01 0:00
7/5/01 0:00
6/30/01 0:00
6/25/01 0:00
Volts ac
Voltage at Mae Kam Pong village
microhydro from 25 June to 23
September 2001
300
250
200
150
100
50
0
300
25
250
20
200
15
150
10
100
Current 1
Current 2
Current 3
Voltage
8/8/01 18:05
8/8/01 12:05
8/8/01 6:05
8/8/01 0:05
8/7/01 18:05
8/7/01 12:05
8/7/01 6:05
8/7/01 0:05
0
8/6/01 18:05
0
8/6/01 12:05
50
8/6/01 6:05
5
Volts
30
8/6/01 0:05
Amps
Mae Kam Pong Microhydro Unit #2 Voltage and
Current (15 minute intervals) 6 Sept to 8 Sept 2001
7000
6000
5000
4000
W a tts
3000
2000
2000
1000
1997
1994
0
2 3 :0 0
1985
2 2 :0 0
2 1 :0 0
2 0 :0 0
1 9 :0 0
1 8 :0 0
1 7 :0 0
1 5 :0 0
1 6 :0 0
T im e o f d a y
Year
1988
1 4 :0 0
1 3 :0 0
1 2 :0 0
1 1 :0 0
1 0 :0 0
9 :0 0
8 :0 0
7 :0 0
6 :0 0
5 :0 0
1991
Hourly load curve, by year from 1985 to 2000. Graph based on an appliance
usage survey of 35 families in Mae Kam Pong village, April and June 2001.
10000
9000
8000
7000
o th e r
W a tts
6000
w a te r b o ile r
ric e c o o ke r
5000
iro n
frid g e
TV
4000
lig h ts
3000
2000
1000
0
1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001
Contribution to evening maximum peak demand by appliance, for the years 1985 – 2001.
Small is beautiful pitiful:
Community Micro-hydroelectricity and the
Politics of Rural Electrification in Thailand
Chris Sangarasri Greacen
ERG – UC Berkeley
Ph.D. colloquium presentation – 4 Dec, 2002
Thanks to…
Ph.D. Dissertation Committee: Dan Kammen, Dick Norgaard, Jeff Romm
Switzer Network Mentors: Jim Williams and Margaret Torn
EPA-STAR Fellowship, Switzer Environmental Fellowship
Summary from the village level:
“it still doesn’t add up”
30
300
25
250
20
200
15
150
10
100
$1,600
+
$1,000
High
Low
$800
$600
-
Amps
$1,200
5
50
0
0
Microhydro
Current 1
Grid
Cost effective rural
electricity
68464
70000
25
60000
Current 3
8/8/01 18:05
8/8/01 6:05
8/8/01 12:05
8/8/01 0:05
8/7/01 18:05
8/7/01 12:05
8/7/01 6:05
8/7/01 0:05
Current 2
Voltage
Resolvable technical
and managerial
challenges
28
30
80000
8/6/01 18:05
$0
8/6/01 6:05
Local integrated
development
benefits
8/6/01 0:05
$200
8/6/01 12:05
$400
21
20
50000
=
+
30000
20000
10000
0
?
15
40000
58
Micro-hydro (DEDP)
10
7
5
0
Grid (PEA)
Rarely
implemented
Microhdyro in
operation
Grid arriving
Using Grid
Existing installations
replaced by grid
Volts
$1,400
1966: USAID plan dismisses
decentralized micro-hydroelectricity
“The view has been advanced by some that the
construction and operation of hydroelectric plants... is
necessary in order to demonstrate the interest of the
Government in the welfare of the people, particularly in the
so-called "sensitive areas" where the very low income
status of the population makes them susceptible to the
propaganda of Asian Communism. Others believe that …
the funds available can be put to better use by building
transmission and rural distribution facilities to bring power
from large, centrally located generation stations which are
…less exposed to damage or destruction by subversive or
enemy action. The team endorses the later option.”
USAID (1966). Thailand Electric Power Supply, US Agency for International
Development, United States Operations Mission.
Very Small Power Producer
(VSPP) Regulations in Thailand
• VSPP forces grid monopoly to accommodate
small, distributed generation
• Streamlined interconnection
• Production is valued at the retail rate (net
metering)… 80% of retail rate for net excess.
• In Thailand
– Cabinet approval 14 May 2002
– 1 MW net export per project
– All renewables
• 2006 expanded
– 1 MW 10 MW net export.
– Feed-in tariffs
Mae Kam Pong, Chiang Mai
DEDE + community
40 kW
About $130,000 cost
Sell electricity to PEA – $13,000/year
Biomass
Biogas
Rice husk fired power plant
Potential
: 7000
MW
Source: Thai
Ministry of
Energy 2003
• 9.8 MW
• Roi Et province
• Average VSPP tariff for biomass:
2.9 baht/kWh (incl. subsidy 0.3
baht/kWh)
Korat Waste to Energy - biogas
• Uses waste water from cassava to make
methane
• Produces gas for all factory heat (30 MW
thermal) + 3 MW of electricity
• 3 x 1 MW gas generators
• Subsidy 0.3 baht/kWh
Reduces air and water pollution
Biogas from
Pig Farms
Produces fertilizer
Produces electricity
8 x 70 kW generator
Ratchaburi
Subsidy: 0.3 baht/kwh
Bangkok Solar 1 MW PV
• Project size: 1 MW
• Uses self-manufactured a-Si
VSPP
summary
June 2008
1000
900
800
700
600
500
400
s o la r
bagas s e
rice h u s k
o th e r b io m a s s (s a w d u s t, p a lm )
m u n icip a l w a s te
300
200
b io g a s
100
w in d
h yd ro
0
se llin g
b io d ie s e l
p e rm issio n
a p p lie d
MW
Pico-hydro projects in Thailand
Village & Year
Turbine
Generator
Regulation
Capacity
Kre Khi village 2003
Chinese turgo
Permanent
magnet
None
500 W
E Wi Jo village 2004
Crossflow
Synchronous
None
1 kW
Mae Sa Pau village 2005
Chinese turgo
Permanent
magnet
None (Nepali
ELC)
1 kW
Huai Krating 2006
Pump as turbine
Induction
Nepali ELC
3 kW
Mor Hti Tha 2007
Chinese turgo
Permanent
magnet
None
1.5 kW
Mae Klang Luang 2007
Vietnamese propeller
Permanent
magnet
Vietnam ELC
200 W
Mae Wei 2008
Pump as turbine
Induction
Thai ELC
3 kW
Mae Klang Luang 2008
Chinese turgo
Permanent
magnet
None
1.5 kW
Surin 2008
Chinese turgo
Permanent
magnet
Thai ELC
1.5 kW
Surin 2008
Vietnamese propeller
Permanent
magnet
Thai ELC
200 W
Betong 2008
Pelton
Induction
Thai ELC
1 kW
E Wi Jo 2004
2 kVA synchronous generator
Crossflow (undershot! lousy ‘nozzle’)
E Wi Jo village microhydro
Estimated power: 0.750 kW
Head: 20 meters
Flow: 20 liters/second
Total installed cost: baht 100,000
Huai Krating Microhydro
2005
3 kW pump as turbine
35 meters head
Pump and motor cost: $750
Controller cost: $500 or so
Huai Krating:
‘pump as turbine’ off-grid induction “C-2C”
3kW
Ballast Load
ELC
Motor Run
Capacitors
in Box
Ballast
Current
10A
15A
380V
6A
235V
C
25μF
2C
50μF
3000W
4 kVA 380V
Total
Current
To
Village
Mor Ti Tah Microhydro
2007
Chinese Turgo
35 meters head
No regulation
Turbine cost: $200
Mae Klang Luang,
Chiang Mai
2007
• Vietnamese propeller
• 200 watts
• Cost: $90 (including
controller)
• (show video)
Laos – low head hydro orgy
Mae Klang Luang 2008
• >500 W
• 3 inch PVC pipe
• Turbine cost: $160
• (show video)
Betong, Yala. Pelton
• Nepali
pelton &
nozzle
• Locally
fabricated
box
• Locally
procured 3
phase
induction
motor
Mae Wei – ‘pump as turbine’ off-grid induction
Mbangamao mill, Tanzania
• pump as turbine – mechanical mill
Thai government solar
home program
203,000 solar home systems
Sustainability challenge
>20% failure rate within first year in Tak
Solar for computer training centers
in refugee camps
•1 kW PV hybrid with diesel generator
•Each powers 12 computers
•7 systems