Transcript Document
Project Manager’s Report David Britton 31/Jan/2005 D. Britton Outline 1. Project Maps 2. Resources 3. Quarterly Reports 4. Tier-1 Hardware 31/Jan/2005 Project Manager’s Report D. Britton GridPP1 Final ProjectMap Update GridPP Goal Clear To develop and deploy a large scale science Grid in the UK for the use of the Particle Physics community 1 CERN 2 DataGrid 3 Applications In Summary: LCG Creation 1. 1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 WP1 2. 1 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 WP2 2. 2 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 4 Infrastructure 5 Interoperability 6 Dissemination ATLAS 3. 1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 ATLAS/LHCb 3. 2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 3.2.9 LHCb 3. 3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 Tier-A 4. 1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.1.7 4.1.8 4.1.9 Tier-1 4. 2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.2.7 Int. Standards 5. 1 5.1.1 5.1.2 5.1.3 Tier-2 4. 3 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 5. 3 5.3.1 5.3.2 5.3.3 CMS 3. 4 3.4.2 3.4.3 3.4.4 3.4.6 3.4.7 3.4.8 3.4.10 BaBar 3. 5 3.5.2 3.5.3 3.5.4 3.5.6 3.5.7 Testbed 4. 4 4.4.1 4.4.2 4.4.3 4.4.4 4.4.5 4.4.6 UK Integration 5. 4 5.4.1 5.4.2 5.4.3 5.4.4 5.4.5 CDF/DO 3. 6 3.6.2 3.6.3 3.6.4 3.6.6 3.6.7 3.6.8 3.6.103.6.113.6.12 UKQCD 3. 7 3.7.2 3.7.3 3.7.4 3.7.6 Data Challenges 4. 6 4.6.1 4.6.2 4.6.3 7 Resources Presentation 6. 1 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 Deployment 7. 1 7.1.1 7.1.2 7.1.3 7.1.4 All the GridPP1 milestones due by 30/Sep/04 have been successfully completed (88% of the milestones defined in the ProjectMap). Of the remainder, 9 have been deactivated during the project; 14 have been incorporated into the GridPP2 planning; and 3 Tasks are due soon . All 44 of the monitoring metrics were satisfied at the end of the project. Applications 1. 2 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.2.7 1.2.8 1.2.9 1.2.10 Fabric 1. 3 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 1.3.7 1.3.8 1.3.9 1.3.101.3.11 Technology 1. 4 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 1.4.6 1.4.7 1.4.8 1.4.9 Deployment 1. 5 1.5.1 1.5.2 1.5.3 1.5.4 1.5.5 1.5.6 1.5.7 1.5.8 1.5.9 1.5.10 Metric OK 44 Metric not OK 0 31/Jan/2005 WP3 2. 3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.3.7 WP4 2. 4 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.4.7 WP5 2. 5 2.5.1 2.5.2 2.5.3 2.5.4 2.5.5 2.5.6 2.5.7 WP6 2. 6 2.6.1 2.6.2 2.6.3 2.6.4 2.6.5 2.6.6 2.6.7 2.6.8 2.6.9 WP7 2. 7 2.7.1 2.7.2 2.7.3 2.7.4 2.7.5 2.7.6 2.7.7 2.7.8 Tasks Complete 168 WP8 2. 8 2.8.1 2.8.2 2.8.3 2.8.4 2.8.5 3.4.1 3.4.5 3.4.9 3.5.1 3.5.5 3.6.1 3.6.5 3.6.9 3.7.1 3.7.5 Tasks Overdue 0 Other 3. 8 3.8.1 3.8.2 3.8.3 Open Source 5. 2 5.2.1 5.2.2 5.2.3 Worldwide Integration Participation 6. 2 6.2.1 6.2.2 6.2.3 Monitoring 7. 2 7.2.1 7.2.2 7.2.3 Engagement 6. 3 6.3.1 6.3.2 6.3.3 6.3.4 Developing 7. 3 7.3.1 7.3.2 7.3.3 7.3.4 Status Date Metric OK Metric not OK Task complete Task overdue Due within 122 days Task not due soon Not Active No Task or metric Rollout 4. 5 4.5.1 4.5.2 4.5.3 4.5.4 Tasks due in next 90 days 3 Project Manager’s Report 30-Sep-04 Tasks deactivated 20 Navigate up Navigate down External link Link to goals 1.1.1 1.1.1 1.1.1 1.1.1 1.1.1 1.1.1 1.1.1 Change Forms Enacted 7 D. Britton GridPP2 ProjectMap GridPP2 Goal To develop and deploy a large scale production quality grid in the UK for the use of the Particle Physics community K 0. Tier-A H Tier-1 H 1 LCG K Tier-2 1. 1 I K Applications K 1. 2 1. 3 I K 1. 4 2.1 I I I 2.2 K 2.3 K Grid Deployment 2.4 I K 2.5 I K 2.6 Network 31/Jan/2005 I K 3.2 3.3 I K 3.4 I K 3.5 4.1 K 4.2 I K 4.3 K 3.6 Grid Operations H 5 Management K I 5.1 6 External K Planning I K I 5.2 I K 4.4 6.1 K Deployment I 6.2 6.3 I Engagement I K 6.4 Knowledge Transfer I Navigate down External link Link to goals LHC Deployment Project Manager’s Report I Interoperability K UKQCD I I Dissemination Portal PhenoGrid I I SAMGrid CMS I H BaBar LHCb Information & Monitoring K 3.1 Experiment Support 4 Non-LHC Apps Ganga Security K H ATLAS Workload Management K Middleware Support 3 LHC Apps Data & Storage Management Grid Technology K H Metadata Computing Fabric K Deployment 2 M/S/N I Production Grid D. Britton K I H I GridPP2 ProjectMap GridPP2 Goal: To develop and deploy a large scale production quality grid in the UK for the use of the Particle Physics community J 0.1 0.18 0.35 0.52 H Production Grid Milestones 0.2 0.19 0.36 0.53 0.3 0.20 0.37 0.54 0.4 0.21 0.38 0.55 0.5 0.22 0.39 0.56 I 1. 1 I 1. 2 Computing Fabric K I 1. 3 Grid Technology K I 1. 4 Grid Deployment 0.9 0.26 0.43 0.10 0.27 0.44 0.11 0.28 0.45 J Metadata 2.1 J K I H Storage 2.2 K K 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 2.2.8 2.2.9 2.2.10 2.2.11 2.2.12 2.2.13 2.2.14 2.2.15 J Workload 2.3 K 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.3.7 2.3.8 2.3.9 2.3.10 2.3.11 J Security 2.4 K 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.4.7 2.4.8 2.4.9 2.4.10 2.4.11 2.4.12 2.4.13 2.4.14 2.4.15 InfoMon 2.5 K 2.5.1 2.5.2 2.5.3 2.5.4 2.5.5 2.5.6 2.5.7 2.5.8 2.5.9 2.5.10 2.5.11 J Network 2.6 K 2.6.1 2.6.2 2.6.3 2.6.4 2.6.5 2.6.6 2.6.7 2.6.8 2.6.9 2.6.10 2.6.11 2.6.12 2.6.13 31/Jan/2005 0.12 0.29 0.46 H 2 M/S/N J Navigate down External link Other Link 0.8 0.25 0.42 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 2.1.11 2.1.12 Applications K 0.7 0.24 0.41 H 1 LCG K 0.6 0.23 0.40 0.57 K Production Grid Metrics 0.13 0.30 0.47 0.14 0.31 0.48 0.15 0.32 0.49 0.16 0.33 0.50 0.17 0.34 0.51 H 3 LHC Apps J ATLAS 3.1 K 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3.1.11 3.1.12 3.1.13 J GANGA 3.2 K 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 J LHCb 3.3 K 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 3.3.11 3.3.12 3.3.13 J CMS 3.4 K 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 3.4.7 3.4.8 3.4.9 3.4.10 3.4.11 3.4.12 3.4.13 3.4.14 3.4.15 J PhenoGrid 3.5 0.100 0.117 0.134 0.151 0.101 0.118 0.135 0.152 0.102 0.119 0.136 0.153 0.103 0.120 0.137 0.154 J BaBar 4.1 K 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.1.7 4.1.8 4.1.9 4.1.10 4.1.11 4.1.12 4.1.13 4.1.14 J SamGrid 4.2 K 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.2.7 4.2.8 4.2.9 4.2.10 4.2.11 4.2.12 4.2.13 4.2.14 J Portal 4.3 0.105 0.106 0.107 0.108 0.109 0.110 0.111 0.112 0.113 0.114 0.115 0.116 0.122 0.123 0.124 0.125 0.126 0.127 0.128 0.129 0.130 0.131 0.132 0.133 0.139 0.140 0.141 0.142 0.143 0.144 0.145 0.146 0.147 0.148 0.149 0.150 0.156 H 4 Non-LHC Apps H 5 Management J 6 External Project Planning 5.1 K 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 5.1.7 5.1.8 5.1.9 5.1.10 5.1.11 5.1.12 J Dissemination 6.1 J K 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.1.7 6.1.8 6.1.9 Project Execution 5.2 K J 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 5.2.6 5.2.7 5.2.8 5.2.9 5.2.10 5.2.11 5.2.12 5.2.13 5.2.14 5.2.15 Interoperability 6.2 K 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.2.7 6.2.8 6.2.9 6.2.10 6.2.11 6.2.12 6.2.13 K J Engagement 6.3 K 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10 4.3.11 4.3.12 4.3.13 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5 UKQCD 4.4 Knowledge Transfer J 6.4 K J K 4.4.1 4.4.2 4.4.3 4.4.4 4.4.5 4.4.6 4.4.7 4.4.8 4.4.9 K 3.5.1 3.5.2 3.5.3 3.5.4 3.5.5 3.5.6 3.5.7 3.5.8 3.5.9 J 0.104 0.121 0.138 0.155 LHC Deployment 3.6 K 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 3.6.6 3.6.7 3.6.8 3.6.9 3.6.10 Project Manager’s Report 6.4.1 6.4.2 6.4.3 6.4.4 Status Date - 30/Sep/04 Monitor OK Monitor not OK Milestone complete Milestone overdue Milestone due soon Milestone not due soon Item not Active 1.1.1 1.1.1 1.1.1 1.1.1 1.1.1 1.1.1 1.1.1 D. Britton + next 60 Days Update Clear Production Grid Functionality: - Services (CPU, Disk, Tape, Core Services, Operations, Networking, Deployment, Experiment Support, Middleware Support, Grid Support, Scheduling, Monitoring, Security, etc) - Features (Usability, compatibility, interoperability, etc) Scale: - Amount of Disk, CPU, Tape, Bandwidth, etc. - Number of Tier-2’s - Number of users, VO’s supported, etc. Robustness: - Successful participation in Service Challenges and Model tests. - Reliability (job throughput; uptime; response-times) 31/Jan/2005 Project Manager’s Report D. Britton GridPP2 ProjectMap GridPP2 Goal: To develop and deploy a large scale production quality grid in the UK for the use of the Particle Physics community J 0.1 0.18 0.35 0.52 H Production Grid Milestones 0.2 0.19 0.36 0.53 0.3 0.20 0.37 0.54 0.4 0.21 0.38 0.55 0.5 0.22 0.39 0.56 I 1. 2 I 1. 3 Grid Technology K I 1. 4 Grid Deployment 0.10 0.27 0.44 0.11 0.28 0.45 Metadata 2.1 0.12 0.29 0.46 H 2 M/S/N J J K K I H Storage 2.2 K 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 2.2.8 2.2.9 2.2.10 2.2.11 2.2.12 2.2.13 2.2.14 2.2.15 J Workload 2.3 K 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.3.7 2.3.8 2.3.9 2.3.10 2.3.11 J Security 2.4 K 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.4.7 2.4.8 2.4.9 2.4.10 2.4.11 2.4.12 2.4.13 2.4.14 2.4.15 J Navigate down External link Other Link 0.9 0.26 0.43 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 2.1.11 2.1.12 Computing Fabric K 0.8 0.25 0.42 K Production Grid Metrics 0.13 0.30 0.47 0.14 0.31 0.48 0.15 0.32 0.49 0.16 0.33 0.50 0.17 0.34 0.51 H 3 LHC Apps ATLAS 3.1 0.100 0.117 0.134 0.151 0.101 0.118 0.135 0.152 0.102 0.119 0.136 0.153 0.103 0.120 0.137 0.154 0.104 0.121 0.138 0.155 H 4 Non-LHC Apps BaBar 4.1 0.105 0.106 0.107 0.108 0.109 0.110 0.111 0.112 0.113 0.114 0.115 0.116 0.122 0.123 0.124 0.125 0.126 0.127 0.128 0.129 0.130 0.131 0.132 0.133 0.139 0.140 0.141 0.142 0.143 0.144 0.145 0.146 0.147 0.148 0.149 0.150 0.156 H 5 Management 6 External Project Planning 5.1 K Dissemination 6.1 253 Milestones, 112 Monitoring Metrics at present. Work to be done: LCG area to be defined. Production Grid details refined. Some metrics are not yet finalised. Specific risks and dependencies to be included. I 1. 1 Applications K 0.7 0.24 0.41 H 1 LCG K 0.6 0.23 0.40 0.57 InfoMon 2.5 K 2.5.1 2.5.2 2.5.3 2.5.4 2.5.5 2.5.6 2.5.7 2.5.8 2.5.9 2.5.10 2.5.11 J Network 2.6 K 2.6.1 2.6.2 2.6.3 2.6.4 2.6.5 2.6.6 2.6.7 2.6.8 2.6.9 2.6.10 2.6.11 2.6.12 2.6.13 31/Jan/2005 J K 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3.1.11 3.1.12 3.1.13 J GANGA 3.2 K 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 J LHCb 3.3 K 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 3.3.11 3.3.12 3.3.13 J CMS 3.4 K 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 3.4.7 3.4.8 3.4.9 3.4.10 3.4.11 3.4.12 3.4.13 3.4.14 3.4.15 J PhenoGrid 3.5 J 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.1.7 4.1.8 4.1.9 4.1.10 4.1.11 4.1.12 4.1.13 4.1.14 J SamGrid 4.2 K 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.2.7 4.2.8 4.2.9 4.2.10 4.2.11 4.2.12 4.2.13 4.2.14 J Portal 4.3 J J 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 5.1.7 5.1.8 5.1.9 5.1.10 5.1.11 5.1.12 J K 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.1.7 6.1.8 6.1.9 Project Execution 5.2 K J 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 5.2.6 5.2.7 5.2.8 5.2.9 5.2.10 5.2.11 5.2.12 5.2.13 5.2.14 5.2.15 Interoperability 6.2 K 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.2.7 6.2.8 6.2.9 6.2.10 6.2.11 6.2.12 6.2.13 K J Engagement 6.3 K 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10 4.3.11 4.3.12 4.3.13 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5 UKQCD 4.4 Knowledge Transfer J 6.4 K J K 4.4.1 4.4.2 4.4.3 4.4.4 4.4.5 4.4.6 4.4.7 4.4.8 4.4.9 K 3.5.1 3.5.2 3.5.3 3.5.4 3.5.5 3.5.6 3.5.7 3.5.8 3.5.9 J K LHC Deployment 3.6 K 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 3.6.6 3.6.7 3.6.8 3.6.9 3.6.10 Project Manager’s Report 6.4.1 6.4.2 6.4.3 6.4.4 Status Date - 30/Sep/04 Monitor OK Monitor not OK Milestone complete Milestone overdue Milestone due soon Milestone not due soon Item not Active 1.1.1 1.1.1 1.1.1 1.1.1 1.1.1 1.1.1 1.1.1 D. Britton + next 60 Days Update Clear Risk Register R1 R2 R3 R4 R5 R6 R7 R8 R9 R10 R11 R12 R13 R14 R15 R16 R17 R18 R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 R29 R30 R31 R32 R33 R34 R35 R36 R37 R38 R39 R40 R41 R42 Alt-i-r Recruitment/retention difficulties Sudden loss of key staff Minimal Contingency GridPP deliverables late Sub-components not delivered to project Non take-up of project results Change in project scope Bad publicity No publicity External software dependence Lack of monitoring of staff Withdrawal of an experiment Lack of cooperation between Tier centres Scalablity problems Software maintainability problems Technology shifts Repitition of research Lack of funding to meet LCG PH-1 goals Adequate persistency solution not ready Conflicting software requirements Tier-A hardware fails to meet requirements Other Hardware fails to meet requirements Hardware physical risk (large scale) Hardware physical risk (small scale) Hardware procurement problems LAN Bottlenecks Tier-2 organisation fails Tier-2 hardware not used as planned SYSMAN effort inadequate Firewalls interfere with Grid Inablility to establish trust relationships Security inadequate to operate Grid GGF does not establish standards Minimal open source code development Failure of international cooperation e-Science and GridPP divergence Institutes do not embrace Grid Grid is not stable enough for use Delay of the LHC Lack of future funding Network backbone failure Network backbone bottleneck 31/Jan/2005 Li Im Risk Li Im Risk Li Im Risk Li Im Risk Li Im Risk Li 3 2 6 2 2 4 2 2 4 2 2 4 1 4 4 1 3 3 1 3 3 1 3 3 1 2 2 2 2 4 1 2 2 1 3 3 4 2 8 2 4 8 2 3 6 2 3 6 2 4 8 2 3 6 2 1 2 2 3 6 1 4 4 1 1 1 2 2 4 1 1 1 2 2 4 1 3 3 1 3 3 1 1 1 2 3 6 2 4 8 1 4 4 3 2 6 1 2 2 2 2 4 2 3 6 1 2 2 1 4 4 1 4 4 1 2 2 1 4 4 1 2 2 1 3 3 2 3 6 1 3 3 2 2 4 1 3 3 1 3 3 1 4 4 1 3 3 2 3 6 3 2 6 1 3 3 1 3 3 4 1 4 2 2 4 1 3 3 1 1 1 1 4 4 2 2 4 2 2 4 2 1 2 2 2 4 2 1 2 2 3 6 1 3 3 2 2 4 3 3 9 1 2 3 2 6 1 2 1 3 3 1 3 3 2 2 4 1 4 4 2 2 4 0 4 0.4 1 2 2 Im Risk Currently using GridPP1 Register. 13 Changes made: 2 Risks added 5 risks reduced 5 risks increased 1 adjusted 3 2 4 2 Project Manager’s Report 3 4 4 4 2 previously High risks were reduced. R10_GridPP (S.linux) R14_LCG (Stability) 1 risk elevated to High. R32_INF (Security) D. Britton Overview 1. Project Maps 2. Resources 3. Quarterly Reports 4. Tier-1 Hardware 31/Jan/2005 Project Manager’s Report D. Britton GridPP1 Financial Summary RAL University Grants CERN Miscellaneous SLA FY01 SLA FY02 SLA FY03 SLA FY04 £1,522,055 £1,639,723 £1,602,243 £1,778,706 SLA Subtotal Non SLA Issued £4,746,476 Carried forward £143,050 GridPP1 Grants Subtotal Globus Support Grand Total GridPP1 Expenditure Over (under) spend Recoverable costs (estimate) Total GridPP1 funds remaining (estimate) 31/Jan/2005 £6,542,727 £171,911 £4,603,426 £5,666,835 £12,658 £16,997,556 (£2,444) £99,633 £102,077 (Note-1) Balance of £3.6m attributed to GridPP2 (Note-2) To be confirmed by PPARC (Note-3) Dissemination officer Grant (Note-4) Planned. £56,283 EDG cost claim (Note-5) £18,349 (Est.) Institute. £25,000 (Est.) Institute. Project Manager’s Report D. Britton GridPP1 Financial Summary 1/Jan/2005 Applications £2.05m Operations £1.87m No significant changes to categories Tier - 1/A £3.65m CERN £5.67m FY03 hardware spend slipped to FY04 DataGrid £3.65m CERN DataGrid Tier-1/A Tier-2 Applications Operations TOTAL 31/Jan/2005 TOTAL £5,666,835 £3,647,223 £3,654,985 £102,143 £2,051,827 £1,874,543 £16,997,556 FY2001 £0 £561,819 £836,345 £0 £97,403 £417,827 £1,913,394 Breakdown by Financial Year FY2002 FY2003 £907,843 £2,379,162 £1,098,147 £1,272,651 £913,455 £630,552 £0 £24,499 £662,348 £738,856 £431,181 £590,750 £4,012,973 £5,636,469 Project Manager’s Report FY2004 £2,379,829 £714,606 £1,274,634 £77,645 £553,221 £437,786 £5,437,721 D. Britton GridPP2 Financial Summary Jan 2005 LCG-2 Travel Mgr £0.81m Ops £1.00m Tier-1/A Hardware £0.66m £0.82m £2.40m M/S/N Total includes £102,077 carried forward from GridPP1. £2.77m £2.70m £2.86m Tier-1/A Operations £2.99m Applications Tier-2 Operations Category Sub-Cat LCG Tier-1 Staff Tier-1 Hardware Tier-2 Staff Tier-2 Hardware Applications Staff N/M/S Staff Operations Managers Operations Staff Operations Travel Operations Misc GridPP2 Total Total Available Surplus (Deficit) 31/Jan/2005 Funds are fully allocated. Posts iSY 13.5 39.5 19.0 50.2 19.0 14.5 3.4 2.0 50.0 42.6 10.5 5.3 71 198 FY04 FY05 £437,914 £906,278 £700,000 £800,000 £447,783 £813,941 £150,000 £50,000 £313,190 £1,027,785 £458,194 £920,174 £161,910 £319,853 £35,224 £145,994 £131,284 £272,000 £30,000 £40,000 £2,865,499 £5,296,026 Project Manager’s Report FY06 £942,529 £900,000 £1,082,032 £0 £1,072,414 £964,050 £329,170 £150,823 £284,000 £40,000 £5,765,018 FY07 £408,429 £0 £448,302 £0 £450,704 £426,559 £143,529 £64,893 £119,000 £15,000 £2,076,417 Total Cost £0 £2,695,151 £2,400,000 £2,792,059 £200,000 £2,864,093 £2,768,977 £954,463 £396,934 £806,284 £125,000 £16,002,961 £16,002,077 (£884) D. Britton GridPP1 Effort Summary Effort Expected (Months) Effort Delivered Months Fraction Effort funded via SLA ~600 575 96% Effort funded via Grants 795 ~750 94% TOTAL “Unfunded” effort reported on Middleware “Unfunded” effort reported on Applications TOTAL 1395 1325 95% 254 155 409 Approximately 38.7 FTE/year funded in GridPP1 and approximately 48.2 FTE/year effort reported against deliverables. 31/Jan/2005 Project Manager’s Report D. Britton GridPP2 Effort Summary GridPP2 Funding FTE Total Posts Unfilled 18.5 20 1 14.5 18 2 14 21 13 13.5 13.5 2 Work Area Application Interfaces Middleware/Security/Networking Tier-2 Tier-1 EGEE Infrastructure Support Project Management Board 3.4 (Note-3) Operations (Note-4) 2 TOTAL 62.5 Note-1: Note-2: Note-3: Note-4: 6 2 80.5 Other Funding FTE (Note-1) ~10 ~8 (Note-2) 3 9.5 0 0 18 ~30 Not possible to estimate May fall once Tier-2 posts are in place; expected about 4. Reduced from 3.6 in previous planning. Dissemination officer and Production Manager. 62.5 FTE/year (c.f. GridPP1 38.7). Tier-2 hardware posts currently being filled. 31/Jan/2005 Project Manager’s Report D. Britton Outline 1. Project Maps 2. Resources 3. Quarterly Reports 4. Tier-1 Hardware 31/Jan/2005 Project Manager’s Report D. Britton Reporting Lines CB PMB OC Project Manager Application Coordinator ATLAS BaBar GANGA CDF LHCb D0 CMS UKQCD PhenoGrid SAM Tier-1 Manager Tier-1 Staff Production Manager 4 EGEE Funded Tier-2 Coordinators Tier-2 Board Chair Tier-2 Hardware Support Posts Middleware Coordinator Metadata WLMS Data Security Info.Mon. Network LHC Dep. Portal 31/Jan/2005 Project Manager’s Report D. Britton Information Flow Collaboration (Board) ProjectMap PMB (Milestones and Metrics) Quarterly Review Logbook ProjectPlan Oversight Committee (Money and Effort) External Review 31/Jan/2005 Project Manager’s Report D. Britton Quarterly Reports: Effort HW 04Q3 Sup (Live) Post TBD1 CPU Service1 ADS Service1 TBD2 ADS Service2 Deployment Service1 T1 Manager TBD3 TBD4 Disk Service1 Deployment Service2 Expt Support1 Core Service1 Core Service2 Core Service3 TBD5 Operation Service1 Tier-1 GridPP Funded Tier-1 CCLRC Funded T2 Security T2 WLMS(HEP) T2 WLMS(LeSC) T2 Network T2 HP Post T2 Data Man. T2 Data Man T2 VO Man HW Sup (Edin) HW Sup (Glas) HW Sup (Durh) HW Sup (Man1) HW Sup (Man2) 31/Jan/2005 05Q1 05Q2 3.00 05Q30.00 3.00 Imperial CMS 3.00 3.00 3.00 3.00 1.00Frwk Actual Planned Planned Planned Cambridge ATLASActual 0.00 3.00 0.00 3.00 0.00 3.00 1.00 3.00 Actual PhenoGrid0.50 Post 1.00 1.50 3.00 1.50 3.00 1.50 HW Sup (Shef) 1.50 0.00 0.00 0.00 3.00 04Q3 3.00 Applications Total3.00 3.00 3.00 3.00 15.00 3.000.00 52.50 3.000 HW Sup (Impe) 1.00 3.000.00 0.00 0.00 3.00 3.00 GridPP EU Other2.25 Total 1.003.00 Metadata 0.75 (Gla) 1.00 3.00 2.25 3.00 2.25 HW Sup (QMUL) 2.25 0.70 0.70 2.10 2.10 2.10 2.10 Data Storage1 1.00 1.00 3.00 3.00 0.75 HW Sup (RHUL) 0.25 0.75 0.75 0.75 InfoMon 15.00 0.00 19.50 3.00 1.00 3.00 4.50 3.00 3.00 0.00 0.00 0.75 3.00 0.75 HW Sup (Brun) 0.25 0.75 0.75 MetaData 2.00Storage2 0.00 0.00 2.00 0.80 0.80 2.40 Data 2.40 2.40 2.40 WLMS1 (1/2) 0.00 1.50 0.75 1.50 0.75 HW Sup (UCL) 0.25 0.75 0.75 0.00 0.00 3.00 3.00 3.00 Network 0.70 0.00 0.00 0.70 0.50 1.50 3.00 1.50 3.00 HW Sup (Birm) 1.00 3.00 3.00 1.00 1.00 3.00 WLMS2 (1/2) 3.00 3.00 0.50 3.00 Storage 1.00 0.00 0.00 1.00 3.00 Security1 3.00 3.00 3.00 0.00 1.40 0.00 3.00 0.00 ScotGrid T21.00 Coord 0.00 0.00 0.00 Security 0.00 0.00 0.00 0.00 1.00 3.00 Security2 3.00 3.00 3.00 0.00 1.40 0.00 3.00 0.00 NorthGrid T2 Coord 0.00 0.00 0.00 0.50WLMS 1.50 Security3 1.50 1.50 1.50 (1/2) 0.00 0.70 0.00 1.50 0.00 LonGrid T20.50 Coord 0.00 0.00 0.00 0.50 0.00 0.00 0.50 0.50 0.50 1.50 Security4 0.00 1.501/2) 1.50 1.50 (RAL 0.50 1.50 1.50 0.00 SouthGrid T2 Coord 0.00 0.00 0.00 0.00 0.00 0.00 2.10 0.70LCGDep 0.70 2.10 0.00 2.10 2.10 Security5 (RAL 1/2) 0.50 1.50 1.50 Tier-2 GridPP Funded 0.50 14.00 0.00 44.20 0.00 45.00 0.00 45.00 0.00 45.00 0.00 6.80 13.30 0.90 0.30Tier-1 0.30 0.90 6.50 0.90 0.90 RGMA Tech. Man 1.00 1.00 3.00 3.00 Tier-2 Unfunded 24.40 1.00Tier-2 1.00 3.00 0.50 3.00 3.00 3.00 12.00 24.40 36.90 0.50 1.50 3.00 1.50 3.00 RAL LHCb 0.00 0.00 3.00 0.50 1.50 RGMA Cluster 1.50Man 1.50 0.50 1.50 0.00 0.00 0.40 0.40 RMGA QA (1/2) 1.00 0.50 1.50 1.50 3.00 OxfordATLAS Ganga 0.00 0.00 3.00 3.00 0.50 1.50 1.50 1.50 1.50 1.00 3.00 3.00 3.00 3.00 Cambridge Ganga 0.00 0.00 3.00 0.00 Architect 0.00 1.10 1.00CMS1.00 3.00 RGMA 3.00 3.00 1.00 1.10 3.00 RGMA Developer 1.00 1.00 3.00 3.00 3.00 Birmingham Atlas 0.00 0.00 0.00 3.00 3.00 6.50 LHCb 10.50 31.50 0.00 40.50 0.00 40.50 0.00 40.50 0.00 0.00 3.50 3.50 6.80 1.5yr 9.00CMS 9.00 9.00 9.00 9.003.00 Networking1 1.00 3.00 3.00 3.00 3.00 Brunel 0.00 0.00 BaBar 0.00 0.00 0.00 1.00 3.00 Networking2 3.00 3.00 0.70 0.00 3.00 (DL) 1.00 3.00 1.50 3.00 1.50 IC 50% CMS 0.00 0.00 1.50 0.00 Post0.00 0.00 0.30 0.00 CMS 1.50 Portal 1.50 1.50 1.00 0.30 1.50 1.00 3.00 0.00 3.00 1.00 BristolSAM combined 0.00 0.00 0.50 1.50 1.50 1.50 1.50 Portal 1.00 0.00 0.10 1.10 MSN Total0.008.70 10.50 3.000.00 36.50 3.000.00 43.50 3.000 RAL BaBar 0.00 0.50 1.50 1.50 1.50 Grand Total Funded Effort 18.70 3.20 38.00 1.50 127.20 3.000.00 181.50 3.000 Manchester BaBar 0.000.00 0.00 3.000.00 UKQCD 2.00 1.20 1.00 3.00 3.00 3.00 3.00 Imperial D0 SAM 0.000.00 0.00 3.00 3.00 3.00 PhenoGrid 0.00 0.00 3.00 1.00 3.00 0.00 3.00 3.00 Glasgow CDF SAM 0.00 0.00 3.00 3.00 3.00 1.00 Reported 3.00 18.70 3.00 3.00 Total 27.00 37.80 83.50 3.00 Oxford CDF SAM 0.00 0.00 3.00 3.00 3.00 0.00 0.70 1.50 1.50 1.50 Total Expected 38.00 27.00 65.00 Lancaster D0 SAM 0.00 0.00 3.00 3.00 3.00 0.50 1.50 1.50 1.50 1.50 UKQCD Post 1.00 3.00 3.00 3.00 3.00 0.30 Generic 0.33 Fraction 1.00 2.00 1.00 1.00 1.00 49% 100% 128% 0.20 0.17 0.50 0.50 0.50 0.50 LHC Deployment 0.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 Oxford LHCb Metadata 0.00 0.00 3.00 3.00 3.00 1.00Metadata 3.00 1.00 3.00 3.00 3.00 Glasgow Atlas 1.00 3.00 3.00 3.00 3.00 Actual HW SupPlanned (Lanc) 04Q4 Actual Planned Project Manager’s Report D. Britton Quarterly Report: Example Note completed deliverables AND provide a link 04Q3 Comments Note started delayed ChangeForm mustand bepresented completed. Gidon ondeliverables. September 1st.AAttended GridPP11 the following talk: http://www.gridpp.ac.uk/portal/talk_2004.09.13.pdf Provide some details for information. Work started on technical the first deliverable. 04Q4 Comments The first deliverable (4.3.1 “Requirements Capture Document”) has been completed (though some iteration is currently continuing with the Applications Manager) and the present draft version is available at http://www.gridpp.ac.uk/portal/requirements.pdf . Substantial work was done on the second deliverable (4.3.2 “Technical Review Document”) though this was not completed on schedule by Dec 15th. Part of the holdup here is that we would like to liaise with Rob Allen on the technical direction as a reality check and a meeting could not be arranged until early February. Nevertheless, a draft document exists and the technical direction of the project is now being defined (subject to the discussions in February). Specifically, Gidon has established that Apache + mod_gridsite + mod_jk + Tomcat + GridSphere can all work together to provide a portlet inside the GridSphere application to have access to the DN of a user who can only get onto the https using their X.509 CA signed certificate. Gidon has also learnt enough about Java Web Start and JAR signing and ant to be able to get the visual_grid_proxy_init to launch from a jnlp. See http://www.hep.ph.ic.ac.uk/~gidon/ . 31/Jan/2005 Project Manager’s Report D. Britton Outline 1. Project Maps 2. Resources 3. Quarterly Reports 4. Tier-1 Hardware 31/Jan/2005 Project Manager’s Report D. Britton Tier-1 Hardware The issues here are: •The “fair” allocation of Tier-1 hardware •International MOU’s and other less formal commitments •The Disk-CPU balance and the real cost of Tape •The absolute scale. Enter the Spreadsheet 31/Jan/2005 Project Manager’s Report D. Britton Tier-1 Hardware M&O Authors ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Th. Other 2004 2005 2006 2007 2008 6 109 36 45 40 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 2004 1 1 1 1 3 1 1 1 1 0 1 1 0.3 0.3 0.3 0.1 2005 1 1 1 1 2 0.9 0.9 0.9 1 0.9 0.9 1 0.3 0.3 0.3 0.1 2006 1 1 1 1 1 0.8 0.8 0.8 1 0.8 0.8 1 0.3 0.3 0.3 0.1 2007 1 1 1 1 0.5 0.5 0.5 0.5 1 0.5 0.5 1 0.3 0.3 0.3 0.1 2008 1 1 1 1 0.3 0.3 0.3 0.3 1 0.3 0.3 1 0.3 0.3 0.3 0.1 Table of “M&O Authors. Future information sketchy. CB has agreed to provide the “Form-X” information New table will be an FTE count Weights ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Thr. Other 31/Jan/2005 Input Splits ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Thr. Other 2004 2005 2006 2007 2008 Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape 33% 67% 0% 36% 49% 15% 33% 55% 12% 28% 57% 15% 25% 57% 18% 25% 75% 0% 38% 56% 6% 42% 43% 15% 36% 46% 18% 36% 49% 15% 28% 69% 3% 60% 27% 13% 45% 25% 30% 37% 24% 39% 39% 43% 18% 62% 34% 5% 16% 72% 12% 14% 77% 9% 12% 78% 11% 15% 82% 3% 43% 54% 3% 34% 59% 7% 34% 62% 4% 32% 65% 3% 31% 65% 3% 39% 61% 0% 32% 68% 0% 31% 69% 0% 51% 49% 0% 48% 52% 0% 23% 77% 0% 68% 23% 9% 69% 23% 8% 76% 10% 13% 71% 11% 18% 0% 100% 0% 56% 25% 19% 54% 30% 16% 47% 32% 21% 42% 32% 26% 100% 0% 0% 9% 62% 30% 7% 61% 32% 5% 52% 43% 4% 47% 49% 60% 40% 0% 61% 34% 5% 57% 39% 4% 51% 43% 6% 48% 45% 7% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 75% 25% 0% 69% 31% 0% 65% 35% 0% 60% 40% 0% 57% 43% 0% 6% 94% 0% 5% 95% 0% 5% 95% 0% 4% 96% 0% 3% 97% 0% 23% 77% 0% 18% 82% 0% 25% 75% 0% 34% 66% 0% 31% 69% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% September 2004 2005 2006 2007 2008 Shares Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape ALICE 3 12 0 6 16 22 12 31 20 23 64 30 38 97 64 ATLAS 36 237 0 112 339 177 283 462 493 553 960 690 1038 1588 949 CMS 13 72 37 75 68 149 127 111 402 237 207 626 466 572 496 LHCb 36 44 67 21 194 143 42 367 129 78 719 186 189 1173 82 BaBar 68 187 117 78 280 156 90 260 48 95 264 24 106 246 23 CDF 10 36 0 15 66 0 30 105 0 68 91 0 73 89 0 D0 6 44 0 32 22 39 66 35 39 103 19 46 109 19 61 H1 0 76 0 34 31 109 67 59 97 83 77 93 83 71 117 MINOS 17 0 0 3 43 93 5 76 117 9 126 191 13 176 363 SNO 0 0 0 13 15 10 25 27 9 31 36 9 33 35 11 ZEUS 0 73 0 0 121 0 0 191 0 0 231 0 0 214 0 Other Exp. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PhenoGrid 0 6 0 0 11 0 1 19 0 1 37 0 2 58 0 UKQCD 1 10 0 2 20 0 7 32 0 20 55 0 36 88 0 Other Thr. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 191 796 221 392 1224 898 756 1777 1354 1301 2886 1895 2186 4426 2166 Project Manager’s Report D. Britton Tier-1 Hardware M&O Authors ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Th. Other Weights ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Thr. Other 31/Jan/2005 2004 2005 2006 2007 2008 6 109 36 45 40 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 2004 1 1 1 1 3 1 1 1 1 0 1 1 0.3 0.3 0.3 0.1 2005 1 1 1 1 2 0.9 0.9 0.9 1 0.9 0.9 1 0.3 0.3 0.3 0.1 2006 1 1 1 1 1 0.8 0.8 0.8 1 0.8 0.8 1 0.3 0.3 0.3 0.1 2007 1 1 1 1 0.5 0.5 0.5 0.5 1 0.5 0.5 1 0.3 0.3 0.3 0.1 2008 1 1 1 1 0.3 0.3 0.3 0.3 1 0.3 0.3 1 0.3 0.3 0.3 0.1 Table of “Splits”: CPU/Disk/Tape ratio. Future information is sketchy. However, new “approved” information expected from LHC experiments, imminently. Input Splits ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Thr. Other 2004 2005 2006 2007 2008 Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape 33% 67% 0% 36% 49% 15% 33% 55% 12% 28% 57% 15% 25% 57% 18% 25% 75% 0% 38% 56% 6% 42% 43% 15% 36% 46% 18% 36% 49% 15% 28% 69% 3% 60% 27% 13% 45% 25% 30% 37% 24% 39% 39% 43% 18% 62% 34% 5% 16% 72% 12% 14% 77% 9% 12% 78% 11% 15% 82% 3% 43% 54% 3% 34% 59% 7% 34% 62% 4% 32% 65% 3% 31% 65% 3% 39% 61% 0% 32% 68% 0% 31% 69% 0% 51% 49% 0% 48% 52% 0% 23% 77% 0% 68% 23% 9% 69% 23% 8% 76% 10% 13% 71% 11% 18% 0% 100% 0% 56% 25% 19% 54% 30% 16% 47% 32% 21% 42% 32% 26% 100% 0% 0% 9% 62% 30% 7% 61% 32% 5% 52% 43% 4% 47% 49% 60% 40% 0% 61% 34% 5% 57% 39% 4% 51% 43% 6% 48% 45% 7% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 75% 25% 0% 69% 31% 0% 65% 35% 0% 60% 40% 0% 57% 43% 0% 6% 94% 0% 5% 95% 0% 5% 95% 0% 4% 96% 0% 3% 97% 0% 23% 77% 0% 18% 82% 0% 25% 75% 0% 34% 66% 0% 31% 69% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% September 2004 2005 2006 2007 2008 Shares Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape ALICE 3 12 0 6 16 22 12 31 20 23 64 30 38 97 64 ATLAS 36 237 0 112 339 177 283 462 493 553 960 690 1038 1588 949 CMS 13 72 37 75 68 149 127 111 402 237 207 626 466 572 496 LHCb 36 44 67 21 194 143 42 367 129 78 719 186 189 1173 82 BaBar 68 187 117 78 280 156 90 260 48 95 264 24 106 246 23 CDF 10 36 0 15 66 0 30 105 0 68 91 0 73 89 0 D0 6 44 0 32 22 39 66 35 39 103 19 46 109 19 61 H1 0 76 0 34 31 109 67 59 97 83 77 93 83 71 117 MINOS 17 0 0 3 43 93 5 76 117 9 126 191 13 176 363 SNO 0 0 0 13 15 10 25 27 9 31 36 9 33 35 11 ZEUS 0 73 0 0 121 0 0 191 0 0 231 0 0 214 0 Other Exp. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PhenoGrid 0 6 0 0 11 0 1 19 0 1 37 0 2 58 0 UKQCD 1 10 0 2 20 0 7 32 0 20 55 0 36 88 0 Other Thr. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 191 796 221 392 1224 898 756 1777 1354 1301 2886 1895 2186 4426 2166 Project Manager’s Report D. Britton Tier-1 Hardware M&O Authors ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Th. Other Weights ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Thr. Other 2004 2005 2006 2007 2008 6 109 36 45 40 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 2004 1 1 1 1 3 1 1 1 1 0 1 1 0.3 0.3 0.3 0.1 2005 1 1 1 1 2 0.9 0.9 0.9 1 0.9 0.9 1 0.3 0.3 0.3 0.1 2006 1 1 1 1 1 0.8 0.8 0.8 1 0.8 0.8 1 0.3 0.3 0.3 0.1 2007 1 1 1 1 0.5 0.5 0.5 0.5 1 0.5 0.5 1 0.3 0.3 0.3 0.1 2008 1 1 1 1 0.3 0.3 0.3 0.3 1 0.3 0.3 1 0.3 0.3 0.3 0.1 Table of “Strategic Weights.” Previously accounted for movement of M&O authors. Will now show real deviations from “fair-shares” which should be transparent and justifiable. 31/Jan/2005 Input Splits ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Thr. Other 2004 2005 2006 2007 2008 Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape 33% 67% 0% 36% 49% 15% 33% 55% 12% 28% 57% 15% 25% 57% 18% 25% 75% 0% 38% 56% 6% 42% 43% 15% 36% 46% 18% 36% 49% 15% 28% 69% 3% 60% 27% 13% 45% 25% 30% 37% 24% 39% 39% 43% 18% 62% 34% 5% 16% 72% 12% 14% 77% 9% 12% 78% 11% 15% 82% 3% 43% 54% 3% 34% 59% 7% 34% 62% 4% 32% 65% 3% 31% 65% 3% 39% 61% 0% 32% 68% 0% 31% 69% 0% 51% 49% 0% 48% 52% 0% 23% 77% 0% 68% 23% 9% 69% 23% 8% 76% 10% 13% 71% 11% 18% 0% 100% 0% 56% 25% 19% 54% 30% 16% 47% 32% 21% 42% 32% 26% 100% 0% 0% 9% 62% 30% 7% 61% 32% 5% 52% 43% 4% 47% 49% 60% 40% 0% 61% 34% 5% 57% 39% 4% 51% 43% 6% 48% 45% 7% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 75% 25% 0% 69% 31% 0% 65% 35% 0% 60% 40% 0% 57% 43% 0% 6% 94% 0% 5% 95% 0% 5% 95% 0% 4% 96% 0% 3% 97% 0% 23% 77% 0% 18% 82% 0% 25% 75% 0% 34% 66% 0% 31% 69% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% September 2004 2005 2006 2007 2008 Shares Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape ALICE 3 12 0 6 16 22 12 31 20 23 64 30 38 97 64 ATLAS 36 237 0 112 339 177 283 462 493 553 960 690 1038 1588 949 CMS 13 72 37 75 68 149 127 111 402 237 207 626 466 572 496 LHCb 36 44 67 21 194 143 42 367 129 78 719 186 189 1173 82 BaBar 68 187 117 78 280 156 90 260 48 95 264 24 106 246 23 CDF 10 36 0 15 66 0 30 105 0 68 91 0 73 89 0 D0 6 44 0 32 22 39 66 35 39 103 19 46 109 19 61 H1 0 76 0 34 31 109 67 59 97 83 77 93 83 71 117 MINOS 17 0 0 3 43 93 5 76 117 9 126 191 13 176 363 SNO 0 0 0 13 15 10 25 27 9 31 36 9 33 35 11 ZEUS 0 73 0 0 121 0 0 191 0 0 231 0 0 214 0 Other Exp. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PhenoGrid 0 6 0 0 11 0 1 19 0 1 37 0 2 58 0 UKQCD 1 10 0 2 20 0 7 32 0 20 55 0 36 88 0 Other Thr. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 191 796 221 392 1224 898 756 1777 1354 1301 2886 1895 2186 4426 2166 Project Manager’s Report D. Britton Tier-1 Hardware M&O Authors ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Th. Other Weights ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Thr. Other 31/Jan/2005 2004 2005 2006 2007 2008 6 109 36 45 40 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 6 113 47 50 44 20 20 26 13 9 25 0 7 15 0 0 2004 1 1 1 1 3 1 1 1 1 0 1 1 0.3 0.3 0.3 0.1 2005 1 1 1 1 2 0.9 0.9 0.9 1 0.9 0.9 1 0.3 0.3 0.3 0.1 2006 1 1 1 1 1 0.8 0.8 0.8 1 0.8 0.8 1 0.3 0.3 0.3 0.1 2007 1 1 1 1 0.5 0.5 0.5 0.5 1 0.5 0.5 1 0.3 0.3 0.3 0.1 2008 1 1 1 1 0.3 0.3 0.3 0.3 1 0.3 0.3 1 0.3 0.3 0.3 0.1 Input Splits ALICE ATLAS CMS LHCb BaBar CDF D0 H1 MINOS SNO ZEUS Other Exp. PhenoGrid UKQCD Other Thr. Other 2004 2005 2006 2007 2008 Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape 33% 67% 0% 36% 49% 15% 33% 55% 12% 28% 57% 15% 25% 57% 18% 25% 75% 0% 38% 56% 6% 42% 43% 15% 36% 46% 18% 36% 49% 15% 28% 69% 3% 60% 27% 13% 45% 25% 30% 37% 24% 39% 39% 43% 18% 62% 34% 5% 16% 72% 12% 14% 77% 9% 12% 78% 11% 15% 82% 3% 43% 54% 3% 34% 59% 7% 34% 62% 4% 32% 65% 3% 31% 65% 3% 39% 61% 0% 32% 68% 0% 31% 69% 0% 51% 49% 0% 48% 52% 0% 23% 77% 0% 68% 23% 9% 69% 23% 8% 76% 10% 13% 71% 11% 18% 0% 100% 0% 56% 25% 19% 54% 30% 16% 47% 32% 21% 42% 32% 26% 100% 0% 0% 9% 62% 30% 7% 61% 32% 5% 52% 43% 4% 47% 49% 60% 40% 0% 61% 34% 5% 57% 39% 4% 51% 43% 6% 48% 45% 7% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 75% 25% 0% 69% 31% 0% 65% 35% 0% 60% 40% 0% 57% 43% 0% 6% 94% 0% 5% 95% 0% 5% 95% 0% 4% 96% 0% 3% 97% 0% 23% 77% 0% 18% 82% 0% 25% 75% 0% 34% 66% 0% 31% 69% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% September 2004 2005 2006 2007 2008 Shares Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape ALICE 3 12 0 6 16 22 12 31 20 23 64 30 38 97 64 ATLAS 36 237 0 112 339 177 283 462 493 553 960 690 1038 1588 949 CMS 13 72 37 75 68 149 127 111 402 237 207 626 466 572 496 LHCb 36 44 67 21 194 143 42 367 129 78 719 186 189 1173 82 BaBar 68 187 117 78 280 156 90 260 48 95 264 24 106 246 23 CDF 10 36 0 15 66 0 30 105 0 68 91 0 73 89 0 D0 6 44 0 32 22 39 66 35 39 103 19 46 109 19 61 H1 0 76 0 34 31 109 67 59 97 83 77 93 83 71 117 MINOS 17 0 0 3 43 93 5 76 117 9 126 191 13 176 363 SNO 0 0 0 13 15 10 25 27 9 31 36 9 33 35 11 ZEUS 0 73 0 0 121 0 0 191 0 0 231 0 0 214 0 Other Exp. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PhenoGrid 0 6 0 0 11 0 1 19 0 1 37 0 2 58 0 UKQCD 1 10 0 2 20 0 7 32 0 20 55 0 36 88 0 Other Thr. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 191 796 221 392 1224 898 756 1777 1354 1301 2886 1895 2186 4426 2166 Output – guidelines for the User Board within which to perform actual allocation. Output – guidelines within which international MOU’s can be discussed. Note current lack of information on absolute scale. Project Manager’s Report D. Britton Next Steps 1. Replace the MOU Author table with the Form-X information. 2. Update the requested splits for the LHC experiments 3. Determine the absolute shortfall in hardware as a function of time. 31/Jan/2005 Project Manager’s Report D. Britton Conclusions • GridPP1 is complete and a success. • GridPP2 is underway and we are trying to plan for success. • Quarterly reporting is a necessary evil but we make good use of the information gathered to monitor, present and promote the project. • The are many hurdles ahead and we are trying to keep our heads up despite the start of GridPP2. Tier-1 hardware is becoming an issue. 31/Jan/2005 Project Manager’s Report D. Britton Feedback from the OC? Tony 31/Jan/2005 Project Manager’s Report D. Britton Beyond GridPP2 Tony,3 Dave, and Steve circa 2007? coordinators? The LHC experiments computing (GridPP) 31/Jan/2005 Project Manager’s Report D. Britton