Queries raised by Director (Tariff) on ARR and Tariff

Download Report

Transcript Queries raised by Director (Tariff) on ARR and Tariff

Queries raised by Director
(Tariff) on ARR and Tariff
Application of
CESU for FY 2011-12
on
05.02.2011
•
•
•
Some DISCOMs have proposed to levy Monthly
Minimum Fixed Charge (MMFC) in respect of LT
Industry(S), LT Industry(M), SPP(LT) and PWW(LT)
in terms of KVA. In this connection, CESU may submit
whether the above category of consumers are having
meters with facility of reading in KVA.
Some DISCOms have opted for KVAh billing in place
of existing KWh billing. CESU may submit an
estimation of consumption data with KVAh billing as
well as with KWh billing and the difference thereof and
also the revenue implications.
CESU should submit status of Bachata Lamp Yojana
(BLY) of BEE as directed by the Commission in the last
tariff order with their programme of implementation.
2
• Some DISCOMs have proposed to levy demand charges on
emergency drawal by CGPs of their region apprehending
misuse of Clause 80(15) of the Distribution Code. In this context,
CESU may submit month-wise individual emergency drawal of
CGPs within its area of supply along with their respective rated
capacity of the largest unit.
• CESU has submitted audited accounts for FY 2008-09. The
licensee is required to submit the audited accounts for FY 200910. They should also explain as to why they are lagging in
submission of updated audited accounts.
• CESU should submit month-wise cash flow statement for the FY
2010-11 (actuals upto end of January, 2011) considering the
revenue items only.
• OERC had asked DISCOMs vide letter No.238 dtd.28.01.2011 to
submit the DSM activities to be undertaken by them during
2011-12 alongwith their respective costs and benefits. Nothing
has been received from CESU so far. CESU may submit the
relevant details for FY 2011-12 to the Commission.
3