Intro to xxx

Download Report

Transcript Intro to xxx

COMPANY INTRODUCTION AND OPERATION
Prepared by:
Eng. Abdul Rasool H. Nouri
General Manager
Plant on Jebal Ali Free Zone South on Plot # 20909
Tel : 00971 4 8865551
Dir : 00971 4 8865553
Fax: 00971 4 8865552
E-mail: [email protected]
Introduction to Gulf Petro Gas
Entry/ Exit Procedures at GPG Plant
•Communicate your arrival time to concerned GPG staff prior
arrival.
•Ring bell & identify yourself upon request.
•Automatic door lock shall be opened from switch at office.
•Register details in Visitor log Book at reception upon entry/exit.
•Site Induction Training shall be given recorded & registered.
Operation GPG plant – Organization Chart
GM
Eng. Abdul Rasool Nouri
Plant Ops Manager
Ahmed Abood
Coordinator
Emran
Plant administrator
Jackuilin
QC/lab in charge
Jenivas
Accountant
Faris
Plant Supervisor
NoorNabi
Operator
Harun
Operator
Mohd
Operator
Fabi
Operator
Kumar
Operator
Sasi
Operator
Saleem
GPG Plant - Facility Details & Volumes Cap.
*Area
 8200 sq. mtrs
*Facilities
 Bitumen Storage – 3.5 KT
 Truck Loading Gantry –3 Nos
 Output points- 5 Nos
 Laboratory
 Maintenance Block
 Road Bitumen Tanker -25Nos
 Weighbridge – 100 Tones
 Heating system
MAINT. BLOCK
ROAD TANKERS
HEATING SYSTEM
Truck Loading Gantry
*Volumes Planned for YR.2009
 Bitumen 60 Kt
Weighbridge
General Overview – Plant Facilities
•Office Block:
•toilet
•emergency exits
•Canteen Block
•Guardhouse:
•security checks
•entry passes
•Loading Gantry:
•Bitumen
Tank Farms
Office Block
•Tank Farms:
•Bitumen
Bitumen Road Tankers
Laboratory and canteen
GPG’s Operation Diagram
Bitumen Cargo
( by vessel ) having
quality certificate from origin
Yes
Meets spec
Drown random samples
for quality reconfirmation
by third party
Vessel Discharge
Via
Loading gantry
Into
road tankers
GM
No
(recovery Plan)
Rejected
Sales throughputs measured
by GPG’s weighbridge
GPG’s quality
reconfirmation
Bitumen trucks
discharged
into
GPG’s storages
Trucks receipt
at
GPG plant
General Overview – Plant Facilities
Gpg Office block
45 T road tankers
Laboratory and canteen
Heating sys. And pump station