Transcript Document
Water Services Training Group 13th Annual Conference 10th September 2009 Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Mainstreaming Water Conservation – The Wexford Experience Niall McGuigan Director of Service Wexford County Council Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Phase 1 (’96 – ’00): Ryan Hanley Carl Bro Survey, map, analyse, recommend for County at large. Wexford Town mains replacement (MDS) Gorey Town 1.6km relined, 14.5km replaced – 72% UFW BUT We didn’t keep our data up to date – Bursts, extensions etc Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Phase 2+ (2002 – 2008): 2 Year project (!) Linked with CIS Visited Scottish Water 89 DMA’s 150 loggers, 500 bulk meters on 2,000km pipes (now + 7,500 NDU meters) Telemetry in key locations ALC Hydraulic Models: 7/9 Major Schemes Mains Rehab Report 2008+: and now we’re funding it from revenue, part of cost of water. Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Slide with photo or graph Typical CIS map (also Apas, intranet and internet) Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Local Authority Project Team Project Management Water Conservation Ass't Engineer Water Conservation Grad. Engineer CIS GIS Technician (WTP C'taker) CIS Staff Leakage Tech (plumber) Leakage Tech (plumber) Team A Team B Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Permanent Team EXECUTIVE ENGINEER Conservation Network Mgmt Quality Monitoring Water Conservation, Telemetry Officer Leakage Control Inspector (North) CIS Officer Leakage Control Inspector (South) Wtr Consv’n & Network Mgmt: About €0.5m/year, including equipment maintenance, staff, t&s etc. Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Leak Detection 2005 - 2008 Type of Leak Public Leaks: Repair by Private Leaks: Repair by WCC Developer/Home Owner No. Found No. % No. Repaired Repaired Found No. Repaired % Repaired Consumer Side 178 164 94% 579 536 88% Mains 1,312 1,280 98% 200 194 97% Stoptap 610 593 97% 300 263 87% Supply Side 594 585 98% 103 98 95% Valve/Hydrant 379 355 97% 95 89 94% Totals 3,107 3,020 97% 1,277 1,157 91% Public & Private 4,384 4,177 95% Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 UFW 2000 - 2008 Rural Targets?: 0.4 m3/km/hr (0-5y) 0.3 (5-10y) 0.25 (10-20y) UFW m3/km/hr ± % from 2000 UFW % of flow ± % from 2000 E/C Town 1.19 +16% 45 -18% New Ross Town 0.53 -58% 28 -45% Gorey/Courtown 0.49 -76% 27 -61% Wexford Town 0.68 -65% 26 -48% Gorey Reg. 1.04 +35% 66 0% Small Schemes 0.47 0% 39 -22% South West Reg. 0.23 -21% 31 -39% Fardystown Reg. 0.41 -7% 43 19% Sow Reg. 0.16 -33% 28 -22% South East Reg. 0.27 -36% 36 -38% Averages 0.45 -33% 37 -27% URBAN RURAL Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Active Leakage Control Vs “Do Nothing” WATER DEMAND PROJECTIONS 80000 70000 20,000 m3/day Demand (m3/day) 60000 50000 40000 30000 20000 10000 ALC No ALC 0 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 Year Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Analysis - Sow (rural) •Source vols ok •Poor supply at coast •Established customers •Established UFW •UFW minimal (0.29m3/km/hr) •Pipe bore ok •Hydraulic model •Pipe constraint •Additional coastal source •Link to other reg. scheme •Increase pipe dia •Not a rehab job •Good methodology Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 E/C Blackwater Source Curracloe Wexford Analysis - Gorey Rural •Huge leakage •Every joint •Compound dried out •Terrible level of service •Quantified problem •vfm: joints or pipe? •Replaced 10km •Another 5km now critical •Manoeuvring flows based on modelling. Gorey Courtown Wellfield Reservoir Reservoir Cahore Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Leak Repairs - Mapping Records used for: Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Invoicing 3rd parties Build up database ‘Levels of Service’ Decision making Prioritising work Case for mains rehab Using Leak Records to Build Up a Case for Pipe Rehab – Gorey Regional 57 bursts in 4 years Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Network Mgmt - Modelling 7 major schemes modelled. Fardystown: TW:55m TWL:75m Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Eliminated pump station at Rosslare Harbour €12,500/yr electricity Network Mgmt - Telemetry About 90 monitors 8 principal plants Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Cl resid, pH, Turbidity, NH4, Pumps, Reservoir levels etc. Other key locations Report to Central Control Remote monitoring (& control) by engineers etc Automatic alarm & dial-out Operators help evaluate predetermined responses Reduces reactive and precautionary visits Conservation – Schools & Other Leaflets To each property, to each NDU. Gorey Community School 2004 24 m3/day 15 m3/day (-38%) Cost: €9,000 meters, urinals, push taps, cistern dams Saving 3,200 m3/yr = €9,000 Schools Competition 2008-’09 Get them ready for 2010. 15 schools entered ’08. Prizes for: Lowest av’ge consumption/pupil Most reduction in consumption/pupil Target commercials with advice? Regional Network Mgmt? Rainwater Harvesting? Carlow Co Co pilot 69 litres/hd/day, 2 person house 35 – 60% saving? Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Conservation & Network Mgmt – Cost or Saving for Wxd Co Co? No ALC: 60,900m3/d in 2006 Actual: 43,500m3/d in 2006 Saving: 17,400m3/d Marginal Cost: 12c/m3 Annual Opex saving €762,000 Cost of new 17,400m3/d plant say €6m. WCC 40%, over 10 years= €240,000/year Total Saving Opex + Capex €1m/year Cost of Water Conservation and Network Mgmt: €0.5m/year Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 50000 Demand (m3/d) & No of Connections DEMAND Vs CONNECTIONS 45000 m3/d 40000 +12% 35000 10 Yrs 30000 Customers 25000 +57% 20000 Demand m3/day 15000 Domestic Connections 10000 5000 Linear (Domestic Connections) 0 1996 1998 2000 2002 2004 2006 Linear (Demand m3/day) Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009