Transcript Slide 1

2010ESI
feedback…eThekwini
08 April 2010
Moses Mabhida Stadium
• Stadium completed…hosted several events
– Semi-final between Chiefs & Pirates
– Capacity of 48,000 at stadium
– Fed off grid supply – afternoon match
• Pitch lights were switched on at half time
• Pitch Lighting
– Pitch Lighting not evenly spread along catwalk  creates impression that
lamps have failed (but not a problem).
– Supply to Pitch lighting is fed from the essential supply (Generator)
– UPS debate finalised – City to install – arriving 21 April 2010
2015/07/17
2
eThekwini feedback
• VOC established at the stadium - no Electricity
rep required
• Disaster Management JOC – still being
equipped. Training of facilities to be done at
an alternative (already operational) venue.
Electricity rep required at briefings only.
• Normal liaison between ESKOM and
eThekwini Control Rooms
• Regular interaction between 2010 Designated
Desk @ eThekwini Electricity and SAC
2015/07/17
3
eThekwini feedback
• All Power Supplies to King Shaka Airport
energised. Streetlighting installed.
• Streetlighting upgrades in vicinity of MM
Stadium almost complete
• Stadium overlay plans being approved.
Overlay electricity supply being provided by
City. Event Organiser to pay upfront for
installation.
• Fan Park/Mile still under construction
– Event orgainser appointed
2015/07/17
4
Matches at Moses Mabhida
Stadium
–
–
–
–
–
–
–
2015/07/17
13 June Germany vs Australia
16 June Spain vs Switzerland
19 June Netherlands vs Japan
22 June Nigeria vs South Korea
25 June Portugal vs Brazil
28 June Second Round Match
7 July Semi Final 2
5
Base Camps
• ALGERIA…Zimbali Lodge…Kwa Dukuza
• IVORY COAST…Riverside
Hotel…eThekwini
• GREECE…Beverley Hills Hotel….eThekwini
• CAMEROON…Oyster Box
Hotel…eThekwini
• PARAGUAY…Woodridge Hotel…Eskom
2015/07/17
6
Public Viewing Areas
• 2 sites nationally during pool game stages
• 4 sites nationally during quarter final stages
• All sites for opening and final game
Sites in KZN…
• Midmar dam…11 June, 25 June, 11 July
• Newcastle Stadium…15 June
• Qokololo Stadium(Edendale)… 22 June
• Steadville – Magubane…26 June
• North End Stadium – Matatiele…02 July, 10
July
• Marburg Stadium…07 July
2015/07/17
7
ESKOM TX readiness
• Maintenance plans on track
• EP (Emergency Preparedness) exercise carried out
• KZN TX supply transfer limits checked
– Eskom TX grid suffices the 2010 challenges
– Thermal limitation on Klaarwater/Umgeni and Durban South line internal to eThekwini
– High loading at Klaarwater SS  additional transformer installed under way
2015/07/17
8
ESKOM DX readiness
• Finalisation of PVA and Base Camps will drive final
maintenance plan
• Security Plan has been conceptualised…Need to formalise
links and reporting relationships
• IM (Information Management) plan finalised for the Region
• Draft for SAC (Situation Awareness Centre) has been
completed
• Load Shedding schedules finalised
• Risk Matrix completed
• EP exercise completed
2015/07/17
9