Transcript Slide 1
2010ESI feedback…eThekwini 08 April 2010 Moses Mabhida Stadium • Stadium completed…hosted several events – Semi-final between Chiefs & Pirates – Capacity of 48,000 at stadium – Fed off grid supply – afternoon match • Pitch lights were switched on at half time • Pitch Lighting – Pitch Lighting not evenly spread along catwalk creates impression that lamps have failed (but not a problem). – Supply to Pitch lighting is fed from the essential supply (Generator) – UPS debate finalised – City to install – arriving 21 April 2010 2015/07/17 2 eThekwini feedback • VOC established at the stadium - no Electricity rep required • Disaster Management JOC – still being equipped. Training of facilities to be done at an alternative (already operational) venue. Electricity rep required at briefings only. • Normal liaison between ESKOM and eThekwini Control Rooms • Regular interaction between 2010 Designated Desk @ eThekwini Electricity and SAC 2015/07/17 3 eThekwini feedback • All Power Supplies to King Shaka Airport energised. Streetlighting installed. • Streetlighting upgrades in vicinity of MM Stadium almost complete • Stadium overlay plans being approved. Overlay electricity supply being provided by City. Event Organiser to pay upfront for installation. • Fan Park/Mile still under construction – Event orgainser appointed 2015/07/17 4 Matches at Moses Mabhida Stadium – – – – – – – 2015/07/17 13 June Germany vs Australia 16 June Spain vs Switzerland 19 June Netherlands vs Japan 22 June Nigeria vs South Korea 25 June Portugal vs Brazil 28 June Second Round Match 7 July Semi Final 2 5 Base Camps • ALGERIA…Zimbali Lodge…Kwa Dukuza • IVORY COAST…Riverside Hotel…eThekwini • GREECE…Beverley Hills Hotel….eThekwini • CAMEROON…Oyster Box Hotel…eThekwini • PARAGUAY…Woodridge Hotel…Eskom 2015/07/17 6 Public Viewing Areas • 2 sites nationally during pool game stages • 4 sites nationally during quarter final stages • All sites for opening and final game Sites in KZN… • Midmar dam…11 June, 25 June, 11 July • Newcastle Stadium…15 June • Qokololo Stadium(Edendale)… 22 June • Steadville – Magubane…26 June • North End Stadium – Matatiele…02 July, 10 July • Marburg Stadium…07 July 2015/07/17 7 ESKOM TX readiness • Maintenance plans on track • EP (Emergency Preparedness) exercise carried out • KZN TX supply transfer limits checked – Eskom TX grid suffices the 2010 challenges – Thermal limitation on Klaarwater/Umgeni and Durban South line internal to eThekwini – High loading at Klaarwater SS additional transformer installed under way 2015/07/17 8 ESKOM DX readiness • Finalisation of PVA and Base Camps will drive final maintenance plan • Security Plan has been conceptualised…Need to formalise links and reporting relationships • IM (Information Management) plan finalised for the Region • Draft for SAC (Situation Awareness Centre) has been completed • Load Shedding schedules finalised • Risk Matrix completed • EP exercise completed 2015/07/17 9