STATUS OF CARLSBORG SEWER
PROJECT
Carlsborg Community Advisory Council
Bob Martin
June 6, 2013
UPDATE SINCE LAST CCAC MEETING
• Conditional Approval of Facility Plan by Ecology
• The PUD Board has decided to withdraw from most
aspects of the project.
• The PWTF loan has been executed and assigned to
the County.
• Wastewater treatment and reuse in Sequim
Reasons to Consider Treatment in
Sequim:
• Sufficient excess capacity exists at Sequim WRF.
• Only minor upgrades to Sequim collection system needed
to accommodate Carlsborg flow.
• Less than 3 miles of 6” force main needed to connect.
• “State of the Art” facility producing Class A reclaimed
water.
• Good record of consistently meeting permit standards.
• Sequim aggressively pursuing utilization of reclaimed
water.
• Resolves siting issues in Carlsborg.
• Cost Savings
Preliminary Sequim Cost Proposal
1. Capacity Cost: Proportionate Share of
depreciated cost of shared treatment
facilities (Approx. $1.2-1.5 million for 20-year
Carlsborg flow projection.
2. Treatment O&M: $0.01 per gallon
3. Collection system O$M: $2.12 per foot on
approx. 15,000 feet of shared sewer lines
4. 10-15% surcharge on Treatment & Collection
O&M
Present Worth – 20 Years
(X $1,000)
Cost Component
Facility Plan
(Carlsborg Rx)
Sequim Treatment
& Reuse
Capital Cost – Rx and Reuse
$ 5,860
$ 3,460
Carlsborg Collection
$ 9,719
$ 9,719
$0
$ 532
Subtotal: Capital Cost
$ 15,579
$13,711
O&M Present Worth – 20 yr
$ 5,750
$ 4,577
Total Present Worth
$21,329
$18,288
Expansion Cost
Notes: 1) Assumes constant 2012 dollars and 0% discount.
2) Assumes Purchase of 20-Year Capacity in two increments.
Carlsborg – Initial
Sequim WRF - 2011
Source: Comparison of Costs for Wastewater Management
Systems Applicable to Cape Cod, Barnstable County Wastewater
Cost Control Task Force, April 2010.
UPDATE SINCE LAST CCAC MEETING
• Conditional Approval of Facility Plan by
Ecology
• The PUD Board has decided to withdraw from
most aspects of the project.
• The PWTF loan has been executed and
assigned to the County.
• Wastewater treatment and reuse in Sequim
• Evaluation of conveyance route to Sequim
Sequim Conveyance Options
1.
2.
3.
4.
5.
Crossing at RR Bridge
Old Olympic Highway
Directional Drilling
Crossing at SR 101 Bridge
Utility Bridge
Conveyance Options
UPDATE SINCE LAST CCAC MEETING
• Conditional Approval of Facility Plan by Ecology
• The PUD Board has decided to withdraw from
most aspects of the project.
• The PWTF loan has been executed and assigned
to the County.
• Wastewater treatment and reuse in Sequim
• Evaluation of conveyance route to Sequim
• Request for Proposals for Engineering Consultant
RFP WORK TASKS
1. Design the initial Carlsborg Collection System
RFP WORK TASKS
1. Design the initial Carlsborg Collection System
2. Amend the Facility Plan to reflect treatment
and reuse in Sequim
3. Evaluate options and costs for expansion of
the PUD Carlsborg Water system to the entire
UGA
NEXT STEPS:
• Connection Policies and Costs – Priority
• Inter-local Agreement between County and
City of Sequim
• Design Conveyance system to Sequim
• Construction – completion by end of 2015
Project Timeline
Carlsborg Sewer System Draft Timeline - Updated 4/24/13
Shared resp.
County
Consultant
Contractor
Task #
J
F
M
1
PUD/CO ILA
2
Sequim/Co ILA
3
RFP
A
M
2013
J
J
A
ECY
S
O
N
D
J
F
M
A
M
2014
J
J
A
S
O
N
D
J
F
M
2015
A M
J
J
A
Finished 3/18/13
Develop final city cost proposal
Design Carlsborg Collection System
Ad/Award
4
Amend Facility Plan
ECY Review
Select Conveyance Route
5
6
7
8
9
Evaluate Reuse Options
ECY Review
Design conveyance or Carlsborg Rx, Incl. Sequim
Connection Policy/Fees & Sewer Use Ordinance
user fee ordinance
Bid/ Award
Const. collection System
Bid/Award
Const Conveyance/Carlsborg Rx - finish Nov.