No Slide Title

Download Report

Transcript No Slide Title

WG C3-02 : “Sustainable Development
Performance Indicators”
SC C3 reporting
Paris, August 26, 2008
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Scope of Work (ToR content)
• to initiate information exchanges between WG members
concerning Sustainable Development Performance
Indicators,
• to extend the information exchange to TSO not represented
in the WG
• to prepare a general overview of TSO experiences regarding
Sustainable Development Performance Indicators (State of
the Art) (WG goal: 40 pages Technical Brochure),
• to share best practices.
• after this work, Generation Sustainable Development
Performance Indicators will be studied.
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Meetings
• Kick-Off meeting during Paris CIGRE session, on
September 1st , 2004
• 2nd meeting in Curitiba (Brasil) on October 20th,
2005
• 3rd meeting during Paris CIGRE session, on August
28th , 2006
• 4th meeting in Mossel Bay (South Africa) on
October 30th, 2007
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Membership
Mr. Ricardo Furtado
Mrs. Mirian Regini Nuti
Mr. Antonio Negri
Mr Vander Tumiatti
Mr. Shintaro Yokokawa
Mr. Koji Toyama
Mr Francisco Parada
Mr André Vallée then
Glen singleton
Mr. Etienne Serres
Mrs. Fiona Havenga
Michel Nederlandt
Mrs Mercedez Vasquez
Mr Henk Sanders
BRA
BRA
ITA
ITA
JAP
JAP
POR
CAN
EPE
EPE
CESI – Italian Electric Experimental Centre
Sea Marconi Technologies
Kansai Electric Power Company
Kansai Electric Power Company
Rede Eléctrica Nacional
Hydro-Quebec Trans Energie
Regular
Observer
Observer
Regular
Observer
Regular
Regular
Regular
FRA
RSA
BEL
SP
NL
RTE – National Electricity Grid of France
ESKOM Transmission
ELIA
Red Eléctrica de España
Tennet
Regular
Regular
Regular
Corresponding
Regular
Participation :
• SC C3-02: M. DU FOUR (Belgium), M. NAKAGAMI (Japan)
• SC C3 members: Ms BODLUND (Sweden), M. WYSS (Switzerland), M. ENOCH
(Nederland), MARTIN (Australia)
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Achievements
• Analysis of guidelines available at the beginning of the study
– Sustainability Reporting Guideline (Global Reporting Initiative) V2
– Environmental Performance Indicator guidelines for the Australian
Electricity Industry (ESAA)
– Guidance notes on environmental benchmarking indicators for the
electricity sector (EA)
– Sustainability in the Electricity Supply Industry: Phase 1 Report
(WSDBC).
• Analysis of guidelines available issued during the study (late
2006 and early 2008)
– Sustainability Reporting Guideline (Global Reporting Initiative) V3
– GRI Electric Utility Sector Supplement – Draft version (GRI)
– Sustainability Reporting Guidelines & Electric Utility Sector Supplement
Pilot Version
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
References
• GRI V2 as best existing reference but as no
Sector Supplement were available, the WG had
to use others guidelines
• Issue of GRI V3 and a draft of the Electric
Utility Sector Supplement late 2006: Indicators
have to be reviewed, but 90 % of the work can
be considered as valid.
• Issue of a combined version of GRI V3 and the
Electric Utility Sector Supplement beginning
2008.
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
General comments
• Environmental indicators are specific to TSO, and have to
be distinguished from those dealing with generation. For
instance
– Waste (radioactive waste or ashes vs PCB, iron,concrete ...)
– Emissions (NOx, SOx, CO2 vs SF6)
– Significant spills (radioactive leaks vs oil leaks)
Important risk for TSO to have their environmental impacts
hidden by Generation ones.
• Other indicators should apply (Economic and Social)
whatever the company type (TSO, integrated utility,
Genco...)
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Curitiba and Paris Achievements
• Indicators ranking during 2005 Curitiba
meeting in order to focus on the most
important ones:
– Environment: 10 Indicators out 35 GRI Indicators
– Social: 6 Indicators out 49 GRI Indicators
– Economic: 8 Indicators out 13 GRI Indicators
• Final draft report sent in July 2007, describing
in details the indicators, how to measure them,
and examples (GRI V2 compliant...)
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Mossel Bay Achievements
• Analysis of the difference between GRI V2 and GRI
V3:
– Which GRI V2 selected indicators have been modified,
deleted ...
– Which GRI V3 indicators are new and are relevant
• Analysis of the Draft Electric Utility Sector
Supplement
– Which indicators are relevant
• Selection of the new indicators for the final report (6
from the GRI V3, 10 from Draft Electric Utility
Sector Supplement)
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
GRI V2 -> GRI V3 impact on the
previously selected indicators
• Major changes on Economic Indicators
• Small impact on other indicators
• See Excel file “WG GRIV2 selection vs GRIV3.xls
sent in September
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
GRI V2 -> GRI V3 impact on the
previously selected indicators
• GRI V2 Selected Indicators deleted in GRI V3
– GRI V2 EC4 Percentage of contracts that were paid in accordance with
agreed terms => No equivalent
– GRI V2 EN33 Performance of suppliers relative to environment. => No
equivalent.
– GRI V2 EN25 Impacts of activities and operations on protected and
sensitive areas => the information is now captured in other biodiversity
indicators particularly GRI V3 EN12 and 13.
– GRI V2 LA5 Practices on recording and notification of occupational
accidents and diseases => Included in GRI V3 LA7
– GRI V2 PR8 Mechanisms related to customer satisfaction => Included
in GRI V3 PR5
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Environmental Indicators Selection
• New GRI V3 indicator:
– EN18 [Add] ?: Initiatives to reduce greenhouse gas
emissions and reductions achieved
• Draft sector supplement:
– EU14 ?: Percentage of area under Integrated Pest
Management
– EU21 ?: Long-term strategy for managing and eliminating
high level and low level in service PCBs
– EU22 ?: Expected completion date and projected costs of
remediation of all known contaminated sites
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Social Indicators Selection
• New GRI V3 indicator:
– LA12 [Add] ?: Percentage of employees receiving regular
performance and career development reviews
– LA14 [c] ?: Ratio of basic salary of men to women by
employee category
– SO8 [c] ? : Monetary value of significant fines and total
number of non-monetary sanctions for non-compliance
with laws and regulations
– PR9 [c] ? : Monetary value of significant fines for noncompliance with laws and regulations concerning the
provision and use of products and services
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Social Indicators Selection
• Sector Supplement:
– EU25 ?: Participatory decision making processes
with communities and outcomes of engagement
– EU28?: Exposure limit(s) to electric fields (in kV
per m) and magnetic fields (in μT) for members of
the public and employees in the areas in which
reporting organization operates.
– EU29?: Number of injuries and fatalities to the
public including diseases involving utility assets.
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Economic Indicators Selection
• New GRI V3 indicator:
– EC2 [c] ?: Financial implications and other risks and opportunities for
the organization’s activities due to climate change
– EC3 [c] ?: Coverage of the organization's defined benefit plan
obligations.
– EC4 [c] ? : Significant financial assistance received from government
– EC5 [Add] ? : Range of ratios of standard entry level wage compared
to local minimum wage at significant locations of operation
– EC6 [c] ? : Policy, practices, and proportion of spending on locallybased suppliers at significant locations of operation
– EC7 [c] ? : Procedures for local hiring and proportion of senior
management hired from the local community at significant locations of
operation
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Economic Indicators Selection
Sector Supplement:
– EU4 ?: Process and methodologies used to assess existing and future demand,
such as integrated resource planning
– EU5 ?: Planned capacity (MW), dispatching and/or generation mix (MWh)
against projected electricity demand over the long term
– EU6 ?: Approach used for peak load management including load shedding
– EU7 ?: Customer or supply interruptions (as defined by IEEE recognized
standard reliability indicators)
– EU8 ?: Approach to Research and Development (R&D), including R&D goals,
investment mechanisms and processes for implementation
– EU9 ?: Research and Development expenditure by category as a percentage of
total research expenditure
– EU10 ?: Research and Development expenditure as a percentage of net income
– EU12 ?: Transmission and Distribution Loss Factor
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Final Achievements
Indicators selected:
– Environment: 10 Indicators out 30 GRI Indicators +
1 from the draft Electric Utility Sector Supplement +
6 comments
– Social: 8 Indicators out 40 GRI Indicators + 5 from
the draft Electric Utility Sector Supplement + 3
comments
– Economic: 5 Indicators out 9 GRI Indicators + 3 from
the draft Electric Utility Sector Supplement out of 9.
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008
Next steps for WG - proposals to SC C3
• Report approved by the WG members to SC C3 May
2008
• Report submitted to SC C3 chairman for formal approval
by SC C3, May 2008
• Waiting for the approval to go for Electra article
• Extend the work to generation field ??? (Environmental
Indicators)
• WG members are more of the transmission part of the
business  Need for new members from generation (only
two from Brasil and Switzerland since two years…)
STUDY COMMITTEE C3, System Environmental Performance
26 August 2008