Elevation
Skilled & quality craftsmanship of Merlin’ tradition to make the complex a symbol of class.
Foundation
Reinforced cement concrete on piles.
Treatment
Anti-termite during various stages of construction.
Walls
External — 10” Brick Wall, including plaster, paint/stone finished.
Internal — 5” Brick Wall with Plaster-of-Paris finish/ Sheer Walls of 3” Thick.
Windows
Heavy Duty Anodized Aluminum windows with glass panes.
Door
Entrance — Panel door with elegant teak finish polish.
Internal — Teak finish Polished designer flush door polished with quality hardware.
Floors
Marble/ Vitrified tiles in entrance and floor lobbies.
Kitchen
Vitrified tiles in internal flat areas.
Granite kitchen platform with stainless steel sink having drain board with
Elevators
Lauret or equivalent brand fittings.
Well decorated lift car of OTIS/ KONE or equivalent brand.
Toilets
Designer ceramic tiles on the walls upto the door height and anti skid
ceramic tiles on floor. Height and anti skid ceramic tiles on floor.
Sanitary Plumbing
Concealed pipeline for hot/cold water, light colored WC & wash Basin of
Hindustan/ Parryware or equivalent brands.
Sanitary Fittings
C.P. fittings of jaquar/ Ess Ess or equivalent brand.
Electrical
PVC conduit pipe with copper wiring, MCB’s/ ELCB’s, modular of best brands Switches with sufficient
power points for necessary gadgets, call bell/telephone/ T.V. points.
Security
Round the clock electronic security & surveillance system with emergency alarm,
fire fighting system etc.
Water supply
24 hours water supply through UG & OH reservoirs with water treatment Plant.
Facilities
Landscaped greenery, children’s play area, swimming pool, gym, A.C. community hall.
• Facilities such as Electronic Surveillance, Intercom, Generator, Water Treatment Plant, Swimming pool,
Membership to The Resident’s Club and separate line for KMC water in Kitchen are free of cost.
See, What the existing customers say ….
PAYMENT SCHEDULE
SL NO.
PERCENTAGE OF
CONSIDERATION
PARTICULARS
1
15%
ON BOOKING / SIGNING OF AGREEMENT
2
15%
ON COMPLETION OF FOUNDATION WORK
3
10%
ON COMPLETION OF 2ND FLOOR CASTING
4
10%
ON COMPLETION OF 4TH FLOOR CASTING
5
10%
ON COMPLETION OF 6TH FLOOR CASTING
6
5%
ON COMPLETION OF 8TH FLOOR CASTING
7
5%
ON COMPLETION OF 10TH FLOOR CASTING
8
5%
ON COMPLETION OF 12TH FLOOR CASTING
9
5%
ON COMPLETION OF BRICK WORK
10
5%
ON COMPLETION OF PLASTERING
11
5%
ON COMMENCEMENT OF FLOORING
12
5%
ON COMMENCEMENT PLUMBING WORK
13
5%
ON POSSESSION
Thank You