Transcript ELTI - ECB
Case studies from Slovenia ‘The Geothermal Heat Pumps market in Central & Eastern Europe’ Evgen Torhač Project manager Bratislava, 12.11.2007 Introduction • • • • • 17.7.2015 2 Nafta Geoterm profile Current status in Slovenia Lendava geothermal city – project example HTH pump Future development Nafta Geoterm (NG) Profile • NG is a daughter company of Nafta Lendava, with extensive experience in exploration of underground resources since 1945; • Located in north-eastern Slovenia rich with geothermal energy potential • A key player for the further development of geothermal field in this part of central & eastern Europe 17.7.2015 3 NG strategic activities • Increasing the proportion of production and use of environment-friendly geothermal energy with: – direct use of geothermal water and – increasing the efficiency with Heat Pumps • Providing Turn-key solutions on the field of geothermal energy exploration and its utilization • The future built on – Exploring – Developing – Deploying 17.7.2015 4 Bringing clean energy to your house! Development in Slovenia • A lot of potential for direct use, especially northeastern part of Slovenia – 45 MWt installed at 27 locations • GSHP installed – 2,33 MWt • GHP installed – 3,94 MWt • Geothermal system utilization increased substantially in last three years (no official data available yet) • Utilization not optimal with regards to the potential available! 17.7.2015 5 Source: Proceedings World Geothermal Congress 2005 Current situation in Slovenia HEALTH RESORTS AND RECREATION CENTERS (24 loc. – 17,6 MWt) INDUSTRIAL APPLICATIONS: • GREENHOUSES (12,7 MWt) • OTHER (1 MWt) DISTRICT HEATING SYSTEMS (4 loc. – 7 MWt) 17.7.2015 6 Lendava Geothermal city • • • • • • 17.7.2015 7 Production geothermal well Le-2g Geothermal - gas boiler house Surface heat conducting system Injection geothermal well Le-3g Surface injection system Monitoring system Surface heat conduction system PRIMARY CIRCUIT: PIPELINE DIAMETER 150 mm PIPELINE LENGTH 2000 m SECONDARY CIRCUIT: PIPELINE DIAMETER 150 m 17.7.2015 8 PIPELINE LENGTH 1200 m Facts and figures • • • • Fully automated system Thermomineral water temperature: 67ºC Flow rate: 90 m3/h Heat exchangers: • 1x 2,70 MWt • 1x 0,45 MWt • 1x 0,17 MWt • Gas boilers for backup & peak loads: 2 x 1,320 MWt • Price of geothermal energy lower than conventional 17.7.2015 9 Unexploited potential • System based on district heating with high peak loads • Energy potential not used in summer periods • Wasted water temperature: up to 40ºC • With the use of special high temperature GHP the installed power could be doubled! 17.7.2015 10 OPTIMIZATION NEEDED! HTH pump project • EUREKA project • Goal: to develop a high power (over 250kW) high temperature (up to 80ºC) GHP for exploitation of low temperature (up to 40ºC) geothermal sources 17.7.2015 11 • Increasing the overall efficiency of geothermal systems • Enable faster deployment of applications like (district heating, greenhouses, …) • Development of geothermal systems in the areas with lower gradient HTH pump project • Input temperature: up to 40ºC • High COP • Output temperature: up to 80ºC • Additional 2,5 MW in geothermal city Lendava • Very high utilitzation potential 17.7.2015 12 COOPERATION ON THE PROJECT POSSIBLE AND PREFFERABLE! Future projects EXPLORE ! DEPLOY ! High temperature water for electricity production DEVELOP ! Bubble-3Well 17.7.2015 13 Geothermal community THANKS FOR YOUR ATTENTION! Evgen Torhač [email protected] 17.7.2015 14 Nafta - Geoterm, d. o. o. Mlinska ulica 5 9220 Lendava T: + 386 (0)2 57 72 240 F: +386 (02) 57 72 388 E: [email protected] I: www.nafta-geoterm.si