Transcript TITLE
Preparing a decommissioning project (part II) H. Sterner E. Thurow Energiewerke Nord GmbH 1 H. Sterner; E. Thurow, EWN, chapter 3 Site reuse Exemption from Atomic Law of site areas Gr eif swalder Bodden Gr eif swalder Bodden Au sla u fk a na l Einlauf r echenwer k Gr eif swalder Bodden ERA Measurements performed, exempted Measurements performed, exemption from Atomic Law in progress from Atomic Law Measurements going exemption Measurements going on, exemption plannedon, in 2002/03 planned in 2004 uf la Ein 100502 Übergabebauwerk 100102 Abgabe- Rückhaltebecken becken Fund. ELBW1 100505 Dienstgebäude ELBW2 70/ 2 Büro - und geschlossener Auslauf kanal T40 B32 Kläranlage 100103 Betriebs - und Sozialgebäude ELBW 3 B31 ZWISCHENLAGER NORD ZLN A10 A13 ZWAB Maschinenhaus Maschinenhaus Südl. Anbau B33 100504 Appar at ehaus III Appar at ehaus II Appar at ehaus I BGB 100503 WACHGEBÄUDE Notstrom Appar at ehaus IV Spez.-Geb.I Sanilab.I Spez.-Geb.II ZAW A7 GSG Sanilab.II Not st r om III Par kplat z Not st r om II Schalt anlage ZAB 68 CWA A5 10 A VWGI B22 B35 A3 A11 A10 B37 A1 B20 B36 AKP2 Inakt ive AKP1 A1 1 Wer kst at t Fr eim eßanlage A18 B21 A19 A2 A104 A102 A101 A111 tz Par kpla % % VUW 0 r G if e s 100 500 ld wa 1000 Met er n o v 2 Kont r ollber eich Gr enze bet r iebl. Über wachungsber eich Gr enze außer bet r iebl. ZSA Par kplat z A103 Par kplat z 3 A1 A4 6 A VWGII A9 % % ULEGENDE A1 6 A9 Par kplat z A3 A12 Zent r .Dok. A1 4 F+S Geb. B 3 4 Or t slage Spandower hagen na ch Fund. Free release measurement of site area l na ka Über wachungsber eich Fr ee st Site reuse Construction of harbour 3 Technical concept Basic issues main decommissioning and dismantling steps dismantling principles operational waste management categorisation of systems/buildings/areas by radiological classes inventory mass flow logistic (from dismantling) necessary plant adaptation main items of investments (new equipment) special dismantling and disposal concept for highly activated components safe post operation, evaluation of the residual life time of old equipment possibilities to reduce operational costs 4 Technical concept EWN table of content 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. Introduction Site and buildings description Present status Decommissioning and dismantling activities Decontamination methods Emissions Material flow and waste management Radiological protection Declassification Necessary new installations and systems Fire protection Workers protection Plant security Infrastructure Safety case Environmental impact assessment 5 Technical concept EWN - dismantling principles as large components / parts as possible for treatment in our warm workshop or interim storage dismantling planning on system basis, execution on room basis start in unit 5; low contamination / dose rate from low to high contamination / dose rate use market equipment in situ decontamination only for dose reduction 6 Technical concept EWN - main direction of dismantling 7 Technical concept Plant inventory • Systems and other components on a room-by-room basis • Masses and material types (on a room- and system-basis) • Contamination in rooms and systems (including evaluation of contamination penetration in concrete structures) • Dose rates, including ambient rates in rooms, hot spots, and at large components • Hazardous materials (Asbestos, PCB etc.) 8 Technical concept Categorisation by radiological classes • Category I - unrestricted material • Category II - suspected material (an eventual contamination cannot be excluded) • Category III - contaminated material 9 Technical concept Categorisation by radiological classes EWN - example Estimated mass ratio for contamination categories in the turbine hall units 1 – 4 Category I unrestricted material ca. 45 % Category II suspected material ca. 53 % Category III contaminated material ca. 2 % 10 Technical concept Classification of systems I Systems necessary for nuclear safety and/or radiation protection II Systems necessary for industrial safety and/or operation III Not necessary systems 11 Technical concept WWER 440 - classification of systems (example) System Category System Unit Post Operation Preparation Safe Enclosure Safe Enclosure 1, 2, 3, 4 I I I water cleaning system 2 (SVO-2) 1/2 3/4 III III III III III III water cleaning system 3 (SVO-3) including sewage water system 1/2 3/4 II II II II III III water cleaning system 4 (SVO-4) 1/2 3/4 II II III III III III steam generator facility 1, 2, 3, 4 III III III steam generator blowdown system 1, 2, 3, 4 III III III water cleaning system 5 (SVO-5) 1, 2, 3, 4 III III III water cleaning system 6 (SVO-6) 1-4 III III III solid radioactive waste store 1-4 I I III liquid radioactive waste store 1-4 I I III off-gas cleaning system 1/2 3/4 III III III III III III ventilation for reactor- and auxiliary building 12 Remarks Capacity reduction, Adaptation and/or Installation of new Ventilation systems removal solid waste Technical concept Waste and material management • Fuel • Operational waste • Dismantled material 13 Technical concept EWN - fuel management 14 Technical concept EWN - fuel management (state September 2004) 3 CASTOR (252) unit 5 Fuel pool Reactor unit 4 3 CASTOR-MOX (3) unit 3 unit 2 unit 1 0 0 245 0 584 0 578 0 221 0 349 0 349 0 0 0 0 0 313 0 C - 30 235 unit 5 Fuel pool 252 unit 4 unit 3 0 0 245 0 584 349 0 349 0 0 unit 2 0 unit 1 578 221 3 (defect) Reactor 0 0 0 313 0 C - 30C 252 in 3 CASTOR 440/84 in the unit 3/4 Wet Storage 2398 4547 1990 1999 - 30 CASTOR ZL N I nter im Sto rage 235 Sale (1996) Wet Storage 2398 1607 ZLN CASTOR C - 30 Interim Storage 39 TLB CASTOR (35 KGR; 4 KKR) 2940 KGR 1990 235 Sale (1996) 2004 15 Technical concept EWN – operational waste management liguid evaporato concentrates solid radioactive mixed waste low-activated resins sludges from outside the controlled area sludge-resin mixtures Treatment rotational thin film evaporator planet sorting and compaction facility equipment for drying of resins drum drying facility equipment for drying of resins drum drying facility drum drying facility free classing facility buffer storage Interim Storage Nord (ISN) Interim Storage Nord (ISN) Interim Storage Nord (ISN) Interim Storage Nord (ISN) disposal as radioactive waste 16 Interim Storage Nord (ISN) disposal as conventional waste Technical concept EWN - material management Plant Greifswald site 1.800.000 Mg Category I Not contaminated Ca. 1.235.000 Mg Category II and III Potentially contaminated and contaminated Ca. 565.000 Mg Plant parts TH 1 – 6, IH 6 Ca. 50.000 Mg Building structures Ca. 1.185.000 Mg Concrete and plant parts Ca. 94.000 Mg Remaining building structures Ca. 471.000 Mg 17 Technical concept EWN - material management Release measurement 18 Technical concept Project structuring Different structures depending on point of view Work breakdown Responsibility Objects Type of work Phases 19 Technical concept EWN - Work breakdown 20