Background
Electronic Subcontracting Reporting System (eSRS)
eSRS falls under the Integrated Acquisition Environment (IAE) at
GSA
System eliminates the needs for paper submissions and processing
of subcontracting plan reporting on unclassified contracts
 Individual Subcontracting Report (ISR) replaces the SF 294
 Summary Subcontracting Report (SSR) replaces the SF 295
Benefits
 Web-based system
 Allows electronic submission, acceptance, rejection, reporting and
analysis of subcontracting data in a real-time, paperless environment
 Creates standard data that can be shared by a wider range of
communities
1
Regulation
Statutory, Regulatory Requirements and DoD Policy
 Section 8(d) and 15(g) of the Small Business Act
 FAR subparts 19.7 and 19.12 and the clauses at 52.219-8, 52.219-9,
and 52.219-25
 FAR Case 2005-040 (Interim Rule)
 13 CFR 125.3
 19 July 2008 Finley Memo (DoD)
 All Services/Agencies using FPDS must use eSRS beginning October
2008
 Class Deviation issued Feb 12, 2009
 Classified contracts are exempt from using eSRS
2
Importance of eSRS to DoD
Current Subcontracting Reporting Process
• Vendor submits paper Standard Form
(SF) 294 and 295
• DoD government officials manually
enter SF295 data into the old system /
SF294 data kept only at the local level
• Submission process has limited QA
Electronic Subcontracting Reporting System
• Vendor electronically submits data
captured in previous current SF294
and SF295
• Key data elements of the SF294 are
pre-populated from FPDS-NG
• Vendor information is pre-populated
from CCR when submitting report
• This provides a higher level of
transparency into DoD subcontracting
data
3
eSRS Data Flow
Vendor
Electronic Subcontracting
Reporting System (eSRS)
**Contracts must be marked in FPDS as
having a subcontracting plan required in
order for the data to pull into eSRS. If this is
not marked correctly, the vendor will get an
error message and a note to contact their
government contracting official for
resolution.
ISR or SSR
Specifics
• Date Submitted
• Reporting Period
• Prime or Sub K’or
• Major Product or
Service Lines
• Goal Dollars
• Actual Dollars for
Each Business Type
4
Vendor Role
Vendor Logs In
Selects “File ISR”
For vendor log-in, you will
need:
- Company DUNS Number
Enters Prime
Contract #
- Copy of Contract
- Subcontracting Data
eSRS Triggers
FPDS-NG and
searches
contracts
Select appropriate
contract and move
to next step
Submission remains in
pending status until
government user “Accepts”
or “Rejects”
Select “Contract
Type: (prime or sub)
eSRS pre-fills
certain data fields
from Contract in
FPDS-NG
Vendor manually
enters certain data
fields to complete
ISR
Vendor Submits
completed ISR or Saves
as a Draft for submission
at a later time
5
Government Role
Vendor Submits
ISR
Submitted ISR
goes into
“Pending” queue
User Roles:
- Agency Coordinator (AC)
Appropriate
Government
Official logs into
eSRS
-Point of Contact (POC)
-Contracting Official (CO)
-Designated Govt. User (DGU
Appropriate Government
Official identifies ISRs
for which they are
responsible
Appropriate Government
Official must “accept” or
“Reject” the submission
ep
Acc
ISR now in database
and available for
information reports
ted
Reje
cted
ISR sent back to Vendor
to take appropriate
action and resubmit
6
DoD Deployment
eSRS officially launched in federal space in October 2005
Federal agencies began using eSRS for April 2006 reporting period
DoD delayed deployment until system could meet the following
requirements:
 Leveled Hierarchy – System now allows layers of subcommands in
hierarchy
 Comprehensive Subcontracting Test Program (CSP) – 14 companies
which combine all reports into one summary report
 P-14 Report
DoD officially deployed in two phases
 Phase One – April 2008 included six organizations
 Phase Two – October 2008 included all Services/Agencies using
FPDS for their unclassified contracts
7
Pre-Deployment Activities
Weekly requirements meeting with IAE
 BTA TP&R, BTA DBSAE, OSBP and DPAP
 Developed and approved DoD-specific requirements
Weekly Internal DoD Meeting (DBSAE Lead)
 DBSAE - Lead
 TP&R – Requirements
 DPAP – Policy
 OSBP – Small Business Concerns
Bi-weekly meeting with Implementation Team (DBSAE Lead)
 Participants include DoD Internal Team and leads from all
Services/Agencies using eSRS
System Testing
 DBSAE and TP&R led testing of system
 Services and Agencies participate
 Report submitted to IAE for system changes
8
Pre-Deployment Activities
One-on-One Deployment Meetings
 Developed deployment checklist
 Met with every Service/Agency lead to discuss deployment plan and
go through checklist
Training
 Developed several training methods for Service/Agencies/Contractors
 Webcasts and Audio Seminars
 Online demos
 PowerPoint presentations/Web content
 Continuous Learning Module
 Presented at several DoD conferences
Help Desk
 Set up DoD Help Desk
9
Phase One Deployment
Phase One – April 2008 Reporting Period
Organizations using eSRS:
 US Army
 Information Technology e-Commerce and Commercial Contracting Center
(ITEC4-East)
 Contracting Center of Excellence
 Capitol District Contracting Center – Ft. Belvoir
 US Navy
 Navy Facilities Engineering Command (NAVFAC)
 Defense Contract Management Agency (DCMA) – CSP Participants
 Defense Finance and Accounting Service (DFAS)
 Defense Security Cooperation Agency (DSCA)
April deployment met OMB milestone
10
Phase Two Deployment
Phase Two - October 2008 Reporting Period
All DoD organizations using FPDS for their unclassified contracts
began using system
Data input as of March 2, 2009
 3619 ISRs submitted
 1646 SSRs submitted
 487 Year-End SDB Reports
 3595 users registered in site
 While this number does not represent the number of reports that
should be submitted, it is a strong step forward for the Department in
gathering subcontracting data that has not happened in the past.
11
Meetings
 Internal DoD eSRS Meeting - Weekly
 DBSAE – Lead
 BTA TP&R (Requirements)
 DPAP (Policy)
 Office of Small Business Programs (OSBP) – Small business concerns
Implementation Team Meeting – Bi-weekly
 Internal DoD team
 Leads from all Services/Agencies using eSRS
IAE/DoD Meeting– Weekly
 Requirements discussion and approval
eSRS User Group Meeting – Monthly
 Led by eSRS Program Manager at GSA
 Attended by users across the federal government
eSRS CCB - Quarterly
 Led by eSRS Program Manager at GSA
 DPAP has voting chair; OSBP second
12
Training Activities
Online Training
 Have presented at over 40 sessions across the Department using DCO Web
tool
DAU Small Business Community of Practice
 PowerPoint slides, FAQ, Train-the-Trainer, Policy Docs, Webcast links
Continuous Learning Module
 Developed CLC 054 for DAU; over 750 people have taken the online course
DAU Webcast
 Presented with OSBP; over 1031 sites logged into the presentation
 Online site demo was captured and posted with Webcast
NCMA Audio Seminar
 Presented with OSBP; over 250 sites participated
Conferences
 Presented at eleven conference during FY 2008 and Q1 of FY 2009
13
Current System Issues
FPDS was filtering data for 90 days
 This was addressed and fixed 7 November
FPDS does not allow contracts with transaction numbers other than zero to
pull across to eSRS
 This was addressed with GSA and the issue was fixed January 09
Issuing office cannot accept/reject a report when an administering office is
selected
 Change request submitted and approved by CCB; fix will be ready for April
2009 reporting period
 BTA workaround for October 2008 – rejecting all reports with an admin office
listed with note to vendor to resubmit without selecting an admin office.
System does not allow BOA, BPA or classified contracts to be submitted
 DPAP prepared a class deviation to address all contracts, issued Feb 12, 2009
14
Moving Forward FY09
One-on-One meetings with Service/Agency leads to determine
activities for April 09 reporting period
Address system issues faced during Phase II deployment
Continuous engagement with IAE to address system requirement
enhancements
 Change requests running through DBSAE to IAE
Update training with lessons learned from Phase II deployment
Review contracts in FPDS to determine final number of reports that
should be submitted
Develop DoD policy to set date for acceptance of submitted reports
15