Transcript Slide 1
Electronic Subcontracting Reporting System (eSRS) Program Update for DoD Western Regional Council March 5, 2009 Background Electronic Subcontracting Reporting System (eSRS) eSRS falls under the Integrated Acquisition Environment (IAE) at GSA System eliminates the needs for paper submissions and processing of subcontracting plan reporting on unclassified contracts Individual Subcontracting Report (ISR) replaces the SF 294 Summary Subcontracting Report (SSR) replaces the SF 295 Benefits Web-based system Allows electronic submission, acceptance, rejection, reporting and analysis of subcontracting data in a real-time, paperless environment Creates standard data that can be shared by a wider range of communities 1 Regulation Statutory, Regulatory Requirements and DoD Policy Section 8(d) and 15(g) of the Small Business Act FAR subparts 19.7 and 19.12 and the clauses at 52.219-8, 52.219-9, and 52.219-25 FAR Case 2005-040 (Interim Rule) 13 CFR 125.3 19 July 2008 Finley Memo (DoD) All Services/Agencies using FPDS must use eSRS beginning October 2008 Class Deviation issued Feb 12, 2009 Classified contracts are exempt from using eSRS 2 Importance of eSRS to DoD Current Subcontracting Reporting Process • Vendor submits paper Standard Form (SF) 294 and 295 • DoD government officials manually enter SF295 data into the old system / SF294 data kept only at the local level • Submission process has limited QA Electronic Subcontracting Reporting System • Vendor electronically submits data captured in previous current SF294 and SF295 • Key data elements of the SF294 are pre-populated from FPDS-NG • Vendor information is pre-populated from CCR when submitting report • This provides a higher level of transparency into DoD subcontracting data 3 eSRS Data Flow Vendor Electronic Subcontracting Reporting System (eSRS) **Contracts must be marked in FPDS as having a subcontracting plan required in order for the data to pull into eSRS. If this is not marked correctly, the vendor will get an error message and a note to contact their government contracting official for resolution. ISR or SSR Specifics • Date Submitted • Reporting Period • Prime or Sub K’or • Major Product or Service Lines • Goal Dollars • Actual Dollars for Each Business Type 4 Vendor Role Vendor Logs In Selects “File ISR” For vendor log-in, you will need: - Company DUNS Number Enters Prime Contract # - Copy of Contract - Subcontracting Data eSRS Triggers FPDS-NG and searches contracts Select appropriate contract and move to next step Submission remains in pending status until government user “Accepts” or “Rejects” Select “Contract Type: (prime or sub) eSRS pre-fills certain data fields from Contract in FPDS-NG Vendor manually enters certain data fields to complete ISR Vendor Submits completed ISR or Saves as a Draft for submission at a later time 5 Government Role Vendor Submits ISR Submitted ISR goes into “Pending” queue User Roles: - Agency Coordinator (AC) Appropriate Government Official logs into eSRS -Point of Contact (POC) -Contracting Official (CO) -Designated Govt. User (DGU Appropriate Government Official identifies ISRs for which they are responsible Appropriate Government Official must “accept” or “Reject” the submission ep Acc ISR now in database and available for information reports ted Reje cted ISR sent back to Vendor to take appropriate action and resubmit 6 DoD Deployment eSRS officially launched in federal space in October 2005 Federal agencies began using eSRS for April 2006 reporting period DoD delayed deployment until system could meet the following requirements: Leveled Hierarchy – System now allows layers of subcommands in hierarchy Comprehensive Subcontracting Test Program (CSP) – 14 companies which combine all reports into one summary report P-14 Report DoD officially deployed in two phases Phase One – April 2008 included six organizations Phase Two – October 2008 included all Services/Agencies using FPDS for their unclassified contracts 7 Pre-Deployment Activities Weekly requirements meeting with IAE BTA TP&R, BTA DBSAE, OSBP and DPAP Developed and approved DoD-specific requirements Weekly Internal DoD Meeting (DBSAE Lead) DBSAE - Lead TP&R – Requirements DPAP – Policy OSBP – Small Business Concerns Bi-weekly meeting with Implementation Team (DBSAE Lead) Participants include DoD Internal Team and leads from all Services/Agencies using eSRS System Testing DBSAE and TP&R led testing of system Services and Agencies participate Report submitted to IAE for system changes 8 Pre-Deployment Activities One-on-One Deployment Meetings Developed deployment checklist Met with every Service/Agency lead to discuss deployment plan and go through checklist Training Developed several training methods for Service/Agencies/Contractors Webcasts and Audio Seminars Online demos PowerPoint presentations/Web content Continuous Learning Module Presented at several DoD conferences Help Desk Set up DoD Help Desk 9 Phase One Deployment Phase One – April 2008 Reporting Period Organizations using eSRS: US Army Information Technology e-Commerce and Commercial Contracting Center (ITEC4-East) Contracting Center of Excellence Capitol District Contracting Center – Ft. Belvoir US Navy Navy Facilities Engineering Command (NAVFAC) Defense Contract Management Agency (DCMA) – CSP Participants Defense Finance and Accounting Service (DFAS) Defense Security Cooperation Agency (DSCA) April deployment met OMB milestone 10 Phase Two Deployment Phase Two - October 2008 Reporting Period All DoD organizations using FPDS for their unclassified contracts began using system Data input as of March 2, 2009 3619 ISRs submitted 1646 SSRs submitted 487 Year-End SDB Reports 3595 users registered in site While this number does not represent the number of reports that should be submitted, it is a strong step forward for the Department in gathering subcontracting data that has not happened in the past. 11 Meetings Internal DoD eSRS Meeting - Weekly DBSAE – Lead BTA TP&R (Requirements) DPAP (Policy) Office of Small Business Programs (OSBP) – Small business concerns Implementation Team Meeting – Bi-weekly Internal DoD team Leads from all Services/Agencies using eSRS IAE/DoD Meeting– Weekly Requirements discussion and approval eSRS User Group Meeting – Monthly Led by eSRS Program Manager at GSA Attended by users across the federal government eSRS CCB - Quarterly Led by eSRS Program Manager at GSA DPAP has voting chair; OSBP second 12 Training Activities Online Training Have presented at over 40 sessions across the Department using DCO Web tool DAU Small Business Community of Practice PowerPoint slides, FAQ, Train-the-Trainer, Policy Docs, Webcast links Continuous Learning Module Developed CLC 054 for DAU; over 750 people have taken the online course DAU Webcast Presented with OSBP; over 1031 sites logged into the presentation Online site demo was captured and posted with Webcast NCMA Audio Seminar Presented with OSBP; over 250 sites participated Conferences Presented at eleven conference during FY 2008 and Q1 of FY 2009 13 Current System Issues FPDS was filtering data for 90 days This was addressed and fixed 7 November FPDS does not allow contracts with transaction numbers other than zero to pull across to eSRS This was addressed with GSA and the issue was fixed January 09 Issuing office cannot accept/reject a report when an administering office is selected Change request submitted and approved by CCB; fix will be ready for April 2009 reporting period BTA workaround for October 2008 – rejecting all reports with an admin office listed with note to vendor to resubmit without selecting an admin office. System does not allow BOA, BPA or classified contracts to be submitted DPAP prepared a class deviation to address all contracts, issued Feb 12, 2009 14 Moving Forward FY09 One-on-One meetings with Service/Agency leads to determine activities for April 09 reporting period Address system issues faced during Phase II deployment Continuous engagement with IAE to address system requirement enhancements Change requests running through DBSAE to IAE Update training with lessons learned from Phase II deployment Review contracts in FPDS to determine final number of reports that should be submitted Develop DoD policy to set date for acceptance of submitted reports 15