Transcript Document

CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
www.eurogeographics.org
National Reports
Quality Knowledge Exchange Network
October 2013
Copyright ©2013 EuroGeographics
13 National reports
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
BEV, Austria
From June 2013 to October 2013
• News concerning Data Quality
• see report May 2013, Vienna meeting
• Any other news that would be of interest for Q-KEN?
• Project “Vhw-HIST” has been started - Digitization of all plan-documents
stored in the surveying offices to facilitate temporary support between the
surveying offices of the BEV and to improve the service for our customers
by making these documents available via BEV-portal
(This project is one of the measures to meet our objectives according to the
2013 newly implemented principle of outcome orientation.)
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
National Geographic Institute, Belgium
From May 2013 to October 2013
• News concerning Data Quality
• Preparing some Quality Assurance Tests for new roads and building data
• News concerning quality management
•
Designing quality management system for new production line (expected in 2018)
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
Geodatastyrelsen- Denmark
From May 2013 to October 2013
• News concerning Data Quality
•
We have developed a generic model for the work on data quality
•
•
The model are incompliance with ISO 9001
We have initiated a project wit the aim of describing our processes and
thereby also describing our data quality
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
Ordnance Survey Great Britain
From May 2013 to October 2013
• News concerning Data Quality
• Investigations have begun into carrying out a large reconciliation exercise
with regards to Names on various scales of mappings. A variety of
techniques are being used to try and automate the discovery of as many
errors as possible.
• We will also look at ways that we can possibly fix these automatically.
• Particular areas of concern are Gaelic Names.
• The conflict resolution tool that we have been developing is nearing
maturity with development expected to complete at the end of December
2013.
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
Ordnance Survey Great Britain
From May 2013 to October 2013
• Any other news that would be of interest for Q-KEN?
• Ordnance Survey is currently in the process of developing and releasing a
number of new products including a rail network, a water network,
functional sites and a new gazetteer.
•
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
NATIONAL CADASTRE AND MAPPING AGENCY S.A. (NCMA S.A. (former
“KTIMATOLOGIO S.A.”))
From June 2013 to October 2013
• News concerning Data Quality
• Quality Control for Completeness, logical consistency and thematic
accuracy of spatial data and legal status of property rights (according to
registered deeds, court decisions, ministerial decisions) has been
completed for all delivered data,
• Absolute accuracy of spatial data has been completed for 4 contracts (1690
gcp’s),
• Acceptance sampling inspection using procedure A of ISO 2859-2 (sampling
item = ownership). Has been completed for 12 municipalities (800
ownerships),
• Review and complete the cadastral survey specifications for use in new
projects (NCMA S.A. has announced a tender for cadastral survey of the rest
of the country. Mostly agricultural and mountainous areas ~95.000 km2 and
~16 million rights),
• Review of Quality Plan based on new technical specifications (under
development),
• Revision of existing checklists (Quality Control Records) and internal
software applications (under development).
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
NATIONAL CADASTRE AND MAPPING AGENCY S.A. (NCMA S.A. (former
“KTIMATOLOGIO S.A.”))
From June 2013 to October 2013
• News concerning Quality Management
• Re-engineering of the QMS of the Agency according the ISO 9001:2008
Standard: Re-engineering of the QMS architecture, development and updating of
all operational procedures and incorporation into a QMS Information System
Environment ).
• Preparation for ISO 20000 Certification of the National Cadastre Information
System (SPEK) of the Agency, which is expected to be carried out at the
beginning of 2014.
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
NATIONAL CADASTRE AND MAPPING AGENCY S.A. (NCMA S.A. (former
“KTIMATOLOGIO S.A.”))
From June 2013 to October 2013
• Any other news that would be of interest for Q-KEN?
• A Project is conducted for the establishment of a PMO (Project Management
Office of NCMA S.A) (the project is at the phase of implementation).
• The core processes regarding “PROJECT MANAGEMENT” (regarding project
definition, risk management, change management, problem resolution, human
resource management, monitoring and reporting) are under revision for their
compliance with the PMBOK (5th edition) guidelines.
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
FÖMI, Hungary
From May to October 2013
• News concerning Data Quality
• Further development of own software for the data quality of cadastral data
(Visual Basic – PostgreSQL). 1.1 version is working.
• News concerning Quality management
• FÖMI made contact with Hungarian Standards Organisation. Procurement of
the ISO standards are in progress.
• Any other news that would be of interest for Q-KEN?
• Creation of INSPIRE compliant datasets for Administrative Unit, Cadastral
data and Geographical Names is in progress. The pilot version is working.
(Downloading services)
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
Ordnance Survey, Ireland
From May 13 to October 13
• News concerning Data Quality
• Prime 2 Data preparation :100s of man hours spent
• Prime 2 Data Validation :100s more of man hours to be spent!
• News concerning quality management
• OSI has an international business area within Remote Sensing Department
• Seeking ISO 9001 accreditation for Electronic Terrain and Obstacle
Database (ETOD) process
• ISO consultant hired to assist us since summer 2013
• Expected to achieve in January 2014
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
Ordnance Survey Ireland
From May 13 to October 13
• Any other news that would be of interest for Q-KEN?
•
•
•
•
Prime 2 re engineering project signed off
Model Awareness Training started in June 13
Application Training for the Production Support Group begins in November
Application Training for all Production staff begins in December
Merger with OSI, Property Registration of Ireland and Valuation Office
8 workgroups set up with terms and conditions
Employment Control Framework
Department of Public Expenditure and Reform indicates we have to reach a
figure of 185 staff by the end of the year i.e 38 more staff to go
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
National Land Survey of Iceland, Iceland
From January 2013 to October 2013
• News concerning Data Quality
• The ERM and EBM projects now have a common coastline with all
subsequent ERM layers adjusted to it;
• The new ERM/EBM coastline has been quality checked and fixed for double
geometry errors and vertex density errors of 5 meters;
• The ERM and EBM projects now have identical Administrative Boundary
template, which is INSPIRE compliant;
• The National Database was checked for double geometry errors in point, line
and polygon layers;
• The National Database was checked for vertex density errors with a
tolerance of 1 meter;
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
National Land Survey of Iceland, Iceland
From January 2013 to October 2013
• News concerning quality management
• After the evaluation of the geometry quality of the National Database the
decision is still pending of how/when to fix the errors;
• Spatial Data has been identified for INSPIRE provision for Annex I,
Hydrography. The decision needs to be made how the Hydro Network will be
provided (create new or modify the existing one) as currently the National
Hydro Data does not have the Network.
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
The Norwegian Mapping Authority, Norway
From May 2013 to October 2013
• News concerning Data Quality
• Revision of the “Geodata standard/control of Geodata” with implementation
of ISO 19157, quality elements and quality measures (2013-2014)
• After that, revision of the “Production and documentation of Geodata” will
start up
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
IGN, Spain
From May 2013 to October 2013
• News concerning Data Quality:
•
Quality Assurance in the 25K cartographic base:
•
•
Quality Assurance in the 100K topographic base:
•
•
•
•
On visual inspection of the map, we are standardizing nomenclature errors in order to facilitate
communication between reviewers and operators.
Semiautomatic Quality Control workflow based on GIS queries
Homogeneity and efficiency in the process by Standardized Testing and Reporting
As a result: Spain at 100K updated every 2 years
Quality Assurance in the 200K cartographic base:
•
•
•
Style Libraries for cartographic geometries
Semiautomatic Quality Control workflow based on queries to obtain cartographic conflicts
As a result: Spain at 200K updated every 2 years
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
IGN, Spain
From May 2013 to October 2013
•
Quality Assurance in the Services:
•
•
view services (vector
data):
– availability:
99,84%
– performance:
0,64 sec.
– requests:
17,92M
•
view services (raster
data):
– availability:
98,98%
– performance:
1,96 sec.
– requests:
12,06M
•
discovery services
– availability:
99,99%
– requests:
0,82M
News concerning quality management
•
In 25k map, we continue with the development of a DB that contains the different
processes we undertake and we will allow direct control and real-time, tracking
task, alarms to avoid exceeding the default time set in each task, tool to facilitate
prioritization of tasks, etc.. we would like to put into operation in early 2014.
•
We are defining new production processes to update the DB25 and the Map25
simultaneously, and put the updated files to the end user in real-time.
•
We are improving incidents tool so it can be accessible to both staff and to
external users IGN.
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
ICC, Catalunya - Spain
From May 2013 to October 2013
• News concerning Data Quality
• ICC Topographic Data Bases
– New GIS environment for the production of the 25K Topo DB based on
Geomedia (ID’s, lifecycle, customized tools for 3D production).
– Goal to extend this environment to production of the 5K Topo DB.
– Revision of the process to generate data quality metadata – action still
in process - ESDIN Quality Model will be taken into account.
• ICC 2,5 K Orthophoto series
– Exploiting the recently-updated GIS environment for the production of
conventional Orthophoto series.
– Time-to-market shortened: from 1,5 year to 9 months to produce 25 cm
pixel orthophoto for whole Catalonia.
– Researching how to improve radiometric quality OF orthophoto series.
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
ICC, Catalunya - Spain
From May 2013 to October 2013
• News concerning quality management
• Extending the ISO 9001 certificate to the production of conventional
orthophoto series at any scale:
– Working in the generalization process.
– Goal expected for January 2014.
• Finishing the first evaluation of customer’s satisfaction making use
of direct interviews (new methodology, replacing surveys)
• Corporative web workspace to present ISO 9001 QMS information
using Confluence software - First results achieved:
– Main ISO 9001 and Orthophoto department documentation published (manuals,
workflows, indicators, issue tracking).
– Goal: Extend the system to other departments & improve reports by generating
on-the-fly graphics from available indicators.
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
ICC, Catalunya - Spain
From May 2013 to October 2013
• Any other news that would be of interest for Q-KEN?
• New post-graduate programme organized by and host in ICC
International Course on Management and Applied Techniques in Cartography
http://www.iccartotechnology.cat/
• Candidates for future presentations:
– Evolution of the Catalan SDI (IDEC): From data accumulation to enduser services.
– Conceptual design of a Multi-Representation Data Base (25K – 50K)
for data management optimization.
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
Lantmäteriet, Sweden
From May 2013 to October 2013
• News concerning Data Quality
• Lantmäteriet is going on with the project to examine how consistent our
data are in accordance to our specifications. For the six themes: Cadastral
parcels, Land use, Hydrography, Buildings, Elevation and Roads it is now
decided what to evaluate for two types for each of them.
• Our old internal viewing system, AtoKaVy will be replaced with a new GeoVy
from January -14. The new system will display the quality of boundary lines
and points, topology errors (border between municipalities) and more.
• The work with increasing the quality of cadastral information (completeness,
positional accuracy) is still on going.
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
Lantmäteriet, Sweden
From May 2013 to October 2013
• Any other news that would be of interest for Q-KEN?
• Lantmäteriet together with the University of Gävle defined a method to
evaluate delivered data according to the Abstract Test Suite from Inspire. A
summary is now available in English.
• The Government has assigned Lantmäteriet to analyse the requirements for
having our geographic data in 3D
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
Nothing to contribute to the national report this time
•
BKG, Germany
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
Proposals in Budapest for presentations at next plenary
•
•
Revision of the process to generate data quality
•
metadata – action still in process - ESDIN Quality Model
will be taken into account.
We have developed a generic model for the work on data •
quality
ICC, Spain
Denmark
o The model are incompliance with ISO 9001
Candidates for future presentations:
•
Evolution of the Catalan SDI (IDEC): From data
accumulation to end-user services.
•
ICC, Spain
•
Conceptual design of a Multi-Representation Data
•
Base (25K – 50K) for data management optimization.
ICC, Spain
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
Proposals in Vienna for presentations at
future plenaries
•
•
•
QMS documentation using Confluence software.
Conceptual design of a Multi-Representation Data
Base (1:25 K – 1:50 K) for data management
optimization.
BTA / BTU: Harmonization process for large scales
topographic data bases in Spain.
Use of TASI thermal sensor in ICC - Applications.
CONNECTING YOU TO THE
AUTHORITATIVE GEO-INFORMATION
FRAMEWORK FOR EUROPE
•
ICC, Spain
•
ICC, Spain
•
ICC, Spain