Brigadier General William F. Mullen III
Download
Report
Transcript Brigadier General William F. Mullen III
UNCLASSIFIED
POM-17 Marine Corps
Capabilities Analysis
• Objective
– Identify current and future capability requirements, including tasks along with their
associated conditions and performance standards that are necessary to execute
Expeditionary Force 21.
• Inputs:
– Guidance (Expeditionary Force 21)
– Marine Corps CBA Wargame (Scenario and CONOPS)
– Previous MCCL (POM-16)
• Outputs:
– Updated MCCL
– Capability Requirements (Tasks, Conditions, Standards)
• Gap Analysis
– Similar to the capabilities review process, a series of Gap Review Working
Groups (organized by JCA) will be conducted April-May 2014 to review and
update (as required) the Marine Corps Gap List (MCGL).
UNCLASSIFIED//For Official Use Only/Pre-Decisional
1
UNCLASSIFIED
Top Ten Capabilities With
Associated Programs
•
3.1 Maneuver Forces (ACV, AAV, MPC, JLTV, Family of Raid/Reconnaissance
Equipment)
•
1.2 Force Preparation (Ground Based Air Defense - Transformation)
•
5.5 Direct Execution (Ground/Air Task Order Radar (G/ATOR), AN/TPS 59/63 mods)
•
4.1 Provide Deployment and Distribution Support (MPC, JLTV, MTVR, Family of Trailers)
•
5.2 Understand (GCCS-MC, CAC2S, RQ-21A UAS, G/ATOR, MAGTF C2)
•
5.1 Organize (G-BOSS, TLDHS, WFVPS, MARCIM, JSTARS)
•
5.2 Conduct Planning (MAGTF C2, CAC2S, AFATDS, TBMCS)
•
6.1 Transport Information (DDS-M, AIT, LMST, SMART-T, CAC2S, NOTM)
•
3.2 Engage Targets (G/ATOR, AFATDS, MCIOC, USMC CREW Systems)
•
2.1 Plan and Direct Intelligence Operations (MAGTF C2, GCSS-MC, Special Intelligence
Program, UAS Sensor Payloads)
UNCLASSIFIED//For Official Use Only/Pre-Decisional
2
UNCLASSIFIED
ACV History
High Water Speed Possible
But at a Cost:
$12-14 Million Per Vehicle
Initial Operating Capability
2022
New Technology – Program Risk
Not Optimized for 90% of Mission
•
Initial Requirement for High Water
Speed 1013 (12 BNs of lift)
• 2011 EFV Cancelled...Cost and
Operational Effectiveness
• Land Operations
Force Protection at least 1X
Limited Growth Potential
• Avg Growth 20-25%
• 2012 Established a Cross Functional
Project Office to Look at ACV Options
High Fuel Consumption at Sea
• 26 Years and 3 Billion Dollars Later
Less Than Acceptable Reliability
Time for a Revised Acquisition Strategy
UNCLASSIFIED//For Official Use Only/Pre-Decisional
3
UNCLASSIFIED
Littoral Maneuver
Threat Assessment
• Threat ISR and
proliferation have changed
standoff requirements.
• Crisis response is come
as you are w/limited ability
to conduct shaping.
• Complications of ASBM
and CDCM defense place
demands on DDG / CG
capacity to protect the
amphib force
• The ability to close
amphibious ships to 1-2
nm or even 12 nm in an
area denial environment
requires defeat of CDCM
and escort to defeat
leakers.
300 nm + ASBM;
Sky Wave Radar
165 nm ASCM;
Early Warning Radar
65nm C802
25 nm
Coastal Radar
<10.8 nm
ASCM; AAA, Air Def;
Mines; Small Boat;
GRAMM
UNCLASSIFIED//For Official Use Only/Pre-Decisional
UNCLASSIFIED
ACV Concept of Employment
Protected Mobility (2X) for Infantry
and attached Marines and Sailors
Lethality to support dismounted
infantry and defend the vehicle with
precision fires.
Maneuver in complex terrain –
congested, urban, on/off road
River-crossing/shore-to-shore,
near-shore launch from connectors
C2 to support distributed operations
• One ACV-equipped AA Company provides armored lift for one Infantry Battalion.
• Two vehicles carry a reinforced rifle squad with full combat load and 2x DOS
• Two vehicles can act as a base of fire and maneuver element (over-watch / traveling
– over-watch capable)
• Crew member tasks: Vehicle command, operation/maintenance, precision gunnery
• Mission Role Variants will support C2 and Logistics/Recovery requirements
UNCLASSIFIED//For Official Use Only/Pre-Decisional
UNCLASSIFIED
Amphibious Vehicle
Replacement Strategy
Key Considerations
Proposed Acquisition Objectives
• Must acquire a “Family of
Systems” to accomplish the mission
(IOC FY 19 to ~ 35)
AAV Survivability Upgrade
and Sustainment
Purchase Non-Developmental
ACV (Personnel Variant)
ACV Mission Role Variants
(C2, Log, other)
392
• High Water Speed is achievable in
the near term via connectors
204
• No changes to current Amphibious
Shipbuilding Plan
490
• No change to currently
programmed connectors
Potential Competitors
BAE/IVECO
GDLS
SAIC /
TERREX
UNCLASSIFIED//For Official Use Only/Pre-Decisional
• Vehicle Squared is a finite resource
(Amphibs, MPSRON, connectors)
Lockheed
Martin/Patria
Connector Strategy
Work closely with our
Naval partners on the
next generation of
surface connectors.
UNCLASSIFIED
Combat & Tactical Vehicle Roadmap
12
Age
13
14
15
16
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
17
1 2 3 4
18
19
20
1 2 3 4 1 2 3 4 1 2 3 4
21
22
1 2 3 4
1 2 3 4
23
24
1 2 3 4 1 2 3 4
25
26
1 2 3 4
1 2 3 4
27
28
29
30
1 2 3 4 1 2 3 4 1 2 3 4
1 2 3 4
31
32
1 2 3 4 1 2 3 4
IOC
1972 AAV (1,058)
RAM/RS IOC 1998 FOC 2007
42
AAV
Survivability Upgrade
IOC 2019
(392 Total)
FOC 2023
ACV 1.1 (204)
IOC 2020
IOC LAV (925)
1983
ACV 1.2
(490)
FOC 2023
ACV
Phase 2
2035
LAV: IOC 1983 FOC 1988 / LAVA1/SLEP: 1995-2010 / LAV-A2/SLEP: 2006-2010
LAV-AT Modernization: IOC 2017 FOC 2019
2035
31
IOC
2018
JLTV (5,500)
IOC 2018 FOC 2022
2,775 in FYDP
2030
HMMWV A2 / ECV (12,364)
16
7
A2:1998
ECV:2004
HMMWV Sustainment Modification Initiative (1,800 of 6,851in PB-15)
MRAP (2,510)
2020
7
UNCLASSIFIED//For Official Use Only/Pre-Decisional
2035
UNCLASSIFIED
Connectors Way Ahead
•
Publish Broad Area Announcement:
– Initiate engineering change proposals & solicit white
papers
– Assess feasibility
– Conduct EF-21 ship to shore movement analysis
•
Near Term Engineering Change Proposals:
– LCAC/SSC launch capability for ACV/AAV
– Joint High Speed Vessel (JHSV) Sea State 3 ramp
– JHSV launch capability for ACV/AAV
•
Near Term Enhancements:
– Lightweight Modular Causeway System
– Roll-on Roll-off Discharge Facility/LCAC Interface
– Flexible Seabase Force Projection
– Improved Navy Lighterage System/Mobile Landing
Platform interface
– Improved LCAC lashing systems
– LCAC/SSC “station” concept
•
Long Term:
– Identify leap-ahead “Connector After Next” ideas,
designs & technologies
UNCLASSIFIED//For Official Use Only/Pre-Decisional
8
UNCLASSIFIED
Connectors - Near Term
UNCLASSIFIED//For Official Use Only/Pre-Decisional
9
UNCLASSIFIED
UNCLASSIFIED//For Official Use Only/Pre-Decisional
10