Transcript Document
VIRENDER DHAWAN, DGM I/C (O) CCS, BSP RAJEEV SEHGAL, DGM I/C (O) CS, BSP STEEL DEFECTS IN PLATES Non Metallic inclusions (NMI) Longitudinal Crack Spider Crack UT Failure (NDT) INTERNAL NORMS FOR DEFECTS DEFECTIVE DUE TO STEEL DEFECTS : 1.40 % max DEFECTIVE DUE TO MILL DEFECTS : 0.43 % max YEAR WISE ANALYSIS OF STEEL DEFECT YEAR STEEL DEFECTS 2010-11 2.23 2.67 2011-12 2.16 2.57 2.76 3 2.5 2012-13 2.76 3.1 2.23 2.16 2010-11 2011-12 % 2 1.5 1 0.5 0 2012-13 (Till Nov) ANALYSIS OF STEEL DEFECT APRIL-NOV 2012 NCO 65.53 70 60 % 50 40 30 20 10 2.83 3.01 5.88 1.27 1.46 0 NMI LCRK SPCRK NDT PORO SLSD DEFECT WISE STEEL DEFECT 60 55.47 50 DEFECTIVE % 40 30 16.45 20 10 3.83 6.96 3.47 0.67 0 NMI LCRK SPCRK NDT PORO SLSD IMPACT OF HIGH STEEL DEFECT Delay in order servicing Chocking of Plate Mill finishing area Loss of market CHALLENGE Evolve a system which aligns process capability with customer needs ROOT CAUSE ANALYSIS OF UT FAILURE Major Reasons identified for UT Failure Hydrogen cracking Caster Condition Process route - Not aligned with customer need ACTION PLAN FOR REDUCING NDT FAILURES 1. DEFINING OF PROCESS ROUTE FOR DIFFERENT GRADES/THICKNESS Technological Process Route Converter LF RH Caster Plate Mill NDT This process route is to be followed for For all high tensile (with or without Cu) below 410 MPa YS, steel plates of 32 mm and above thickness. For 2062 E410 and above grades this route shall be followed for plate thickness 28 mm and above. Calcium treatment in LF for all high tensile, micro alloyed heats and EME grades. All mild heats for plates of 32 mm and above thickness. All BQ heats irrespective of plate thickness ACTION PLAN 2. APPROVAL OF INITIATIVES FROM GM (QUALITY) ON 25.10.2012 3. INCORPORATING PROCESS ROUTE IN MES ACTION PLAN 4. IMPROVING EFFICIENCY OF DIFFERENT STATIONS IN PROCESS ROUTE Ensuring vacuum level of <3 mbar in 2 to 2.5 minutes and achieving vacuum level of <1 mbar in 3.5 to 4 minutes Measurement of RH out hydrogen at least once in a day. Aimed hydrogen less than 1.5 ppm in tundish RH Off take change/maintenance planned after 1500 heats. IMPROVING EFFECIENCY OF DIFFERENT STATIONS IN PROCESS ROUTE 5. CASTER MAINTENANCE Timely segment changes at caster 6 based on logger readings and feed back on UT results. Increased frequency of manual inspection of Caster 3 Tightening of foundation bolts of caster by hydraulic torque wrench up to 400 Kg/cm2 ACTION PLAN 6. PROCESS CONTROL Initiatives taken under this are Minimum 15’ degassing for 1st heat of sequence / tundish and ensuring a hydrogen level of less than 1.6 ppm. First heat of tundish / sequence planned only for thinner plates and not for heavy plates. Use of MES for effective monitoring of quality feedback and based on this feed back caster maintenance plan made. Diverting heats with less degassing to lower thickness ACTION PLAN Leaner chemistry for lower segregation Inclusion rating on regular basis Aim below 1.0 for EME grades Periodical Sulphur print of slabs for monitoring caster condition RESULTS OF IMPROVEMENT INITIATIVES M/C # 6 Performance Insp NDT Period % 16599 13832 635 39 Before After 3.8 0.28 Heat Number From To 149917 150685 150686 Till 24th 3.8 4 % 3 2 0.28 1 0 BEFORE AFTER RESULTS OF IMPROVEMENT INITIATIVES M/C # 3 Performance Insp NDT Period % 12851 7649 428 63 Before After 3.3 0.8 Heat Number From To 149917 150685 150686 Till 24th % 3.3 3.5 3 2.5 2 1.5 1 0.5 0 0.8 BEFORE AFTER COST OF POOR QUALITY - FOR PLATES Month Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Defective (Ton) 3184 2068 1125 1033 933 1419 Opprotunity Loss (Cr) 4.67 2.76 1.21 1.14 0.86 1.27 Total Sales(Cr) 352.52 Opp Loss/Sales (%) Opp. Loss/Sales % 1.4 1.33 304.46 327.39 333.67 313.99 0.91 0.37 0.34 0.27 1.33 1.2 0.91 1 0.8 0.6 0.4 0.37 0.34 Dec/12 Jan/13 0.27 0.38 0.2 0 Oct/12 Nov/12 Feb/13 Mar/13 333.06 0.38 YEAR WISE ANALYSIS OF STEEL DEFECT 2.5 2.23 2.16 2.11 2 % 1.5 1.01 1 0.88 0.5 0 2010-11 2011-12 2012-13 2013-14 2014-15 (Till date) BENEFITS Timely servicing of orders Increase in customer confidence Capability to service S2E3 (NDT) plate orders developed REDUCED COST 5 4.67 4.5 4 COPQ in Cr. 3.5 3 2.5 2 1.5 0.51 1 0.5 0 OCT '2012 OCT '2013 CUSTOMER FEED BACK TATA HITACHI Subject: FW: feedback from Tata Hitachi (TELCON) Feed back from customer is sent please Balu From:Ajay Kumar [mailto: [email protected]] Sent: 03 April 2013 14:02 To: KL Balasubramanian Cc: Prabhat; Manoj Barik; Malay Palit Subject: feedback Dear sir. The quality of plates have been improved in all parameters . We continue to look forward to similar support in the future also. Regards Ajay Kumar Divisional Manager (Supply Chain Management) TATA Hitachi Construction Machinery Co. Ltd. Tata Motors premises, Telco Jamshedpur - 831010 INDIA CUSTOMER FEED BACK RSB TRANSMISSION JAMSHEDPUR Sent: Tuesday, 26 February 2013, 17:34 Subject: Feed back on quality from M/s RSB Dear Sir(s), Submitted herewith the feedback on quality from M/s RSB Transmission please Balu KL Balasubramanian DGM (Quality) Bhilai Steel Plant Mob: 9407981698 Dear Sir, Please find the Details of Heat no.which we receive after heat no. 150686. We find no complain on these Heat nos. Regards, Manzar Alam Sr.Manager (Materials) RSB Transmission (I) LTD.Unit-II Jamshedpur( INDIA) Email :[email protected] M- 09334628226 Lowest ever steel defects of 0.48 % in May ‘2014 HIGHLIGHTS OF 2014-15 Overall steel defect till Jan 0.88 % From: Sent: To: Cc: Subject: Manzar Alam [[email protected]] 26 February 2013 16:17 'KL Balasubramanian' [email protected]; [email protected]; bmbok Improvement in Plates Quality & Implementation of EME Grade. Dear Sir, As discussed during our Visit to SAIL CMO BOKARO, with Branch manager(Mr.Anil Arora and Mr.Prbhat Kumar and Subsequent telephonic discussion with you regarding the implementation of EME Grade. As we are finding Improvement in the Quality of plates, we still needs the EME to be mentioned in the T.C. as well as on the Plates, to avoid any gap during lifting from Stockyard. Regards, Manzar Alam Sr.Manager (Materials) RSB Transmission (I) LTD.Unit-II Jamshedpur (INDIA) Email :- [email protected] M- 09334628226 ANALYSIS OF STEEL DEFECTS FROM APRIL 2012 TO NOV 2012 DEFECTS % Ton NMI 0.11 849 L CRK 0.19 1468 SCRK 0.45 3476 NDT 1.53 11819 1.80 1.53 1.60 1.40 1.20 1.00 0.80 0.60 0.45 0.40 0.20 0.11 0.19 0.00 NMI L CRK SCRK NDT Quality improvement initiatives New initiatives adopted • Minimum 15 minutes degassing for first heat of sequence / Tundish • Minimum 12 minutes for subsequent heats. • First heat of Tundish/sequence will be planned only for thinner sections and not for heavy plates even if the heat is degassed for 15 minutes. MONTHWISE ANALYSIS OF NDT (%) - LIGHT MEDIUM & HEAVY PLATES 2011-12 0.53 APR 0.87 MAY 1.07 JUN 1.46 JUL 0.92 AUG 2.42 SEP 1.15 OCT 2.24 NOV 2.15 3 2.42 2.5 2.24 2.15 2 1.46 1.5 1.15 1.07 0.92 0.87 1 0.53 0.5 0 2011-12 APR MAY JUN JUL AUG SEP OCT NOV MONTHWISE ANALYSIS OF SCRK (%) - LIGHT MEDIUM & HEAVY PLATES 2011-12 0.46 APR 1.10 1.2 MAY 0.61 JUN 0.54 JUL 0.20 AUG 0.28 SEP 0.36 OCT 0.21 NOV 0.29 1.10 1 0.8 0.61 0.54 0.6 0.46 0.36 0.4 0.29 0.28 0.21 0.20 0.2 0 2011-12 APR MAY JUN JUL AUG SEP OCT NOV MONTHWISE ANALYSIS OF LCRK (%) - LIGHT MEDIUM & HEAVY PLATES 2011-12 0.15 APR 0.19 MAY 0.17 JUN 0.22 JUL 0.19 AUG 0.17 SEP 0.26 OCT 0.26 NOV 0.05 0.3 0.26 0.25 0.26 0.22 0.19 0.2 0.19 0.17 0.17 0.15 0.15 0.1 0.05 0.05 0 2011-12 APR MAY JUN JUL AUG SEP OCT NOV MONTHWISE ANALYSIS OF NMI (%) - LIGHT MEDIUM & HEAVY PLATES 2011-12 0.14 APR 0.15 0.16 MAY 0.11 JUN 0.11 JUL 0.10 AUG 0.09 SEP 0.14 OCT 0.06 NOV 0.08 0.15 0.14 0.14 0.14 0.12 0.11 0.11 0.10 0.1 0.09 0.08 0.08 0.06 0.06 0.04 0.02 0 2011-12 APR MAY JUN JUL AUG SEP OCT NOV From: Sent: To: Cc: Subject: Attachments: Manzar Alam [[email protected]] 26 February 2013 17:02 'KL Balasubramanian' [email protected]; bmbok; [email protected] Tracking of Heat No. After 150686 Sail Heat no-bhilai.xls Dear Sir, Please find the Details of Heat no.which we receive after heat no. 150686. We find no complain on these Heat nos. Regards, Manzar Alam Sr.Manager (Materials) RSB Transmission (I) LTD.Unit-II Jamshedpur (INDIA) Email :- [email protected] M- 09334628226 From: Sent: To: Cc: Subject: Ajay Kumar [[email protected]] 03 April 2013 14:02 KL Balasubramanian Prabhat; Manoj Barik; Malay Palit feedback Dear sir. We take this opportunity to thank you sincerely for the quality improvement done as per our new TDC. The quality of plates have been improved in all parameters . And we expect further improvement in surface ( MINIMIZING THE SCALE FOR FURNACE NORMALISED PLATES ). We continue to look forward to similar support in the future also. Regards Ajay Kumar Divisional Manager (Supply Chain Management) TATA Hitachi Construction Machinery Co. Ltd. Tata Motors premises, Telco Jamshedpur - 831010 INDIA From: Shankar V - Axles India [[email protected]] Sent: 28 January 2013 20:34 To: [email protected] Cc: [email protected]; Madhusudhan.Surathi; [email protected]; [email protected]; [email protected] Subject: FW: sail plate feedback Attachments: SAIL PLATES FEED BACK.xls Dear Mr K M Balasubramanian, We thank you for your efforts in controlling the issue of inclusions and spot laminations. We have checked the heats supplied in Nov and Dec 2012 and confirm that there are no inclusions and laminations. There are no rejections on this account and Quality has improved. We thank your effort and support extended SMS, Quality and plate mill for achieving the mail stone. Regards Shankar -----Original Message----From: K S Ravi Shankar [mailto:[email protected]] To: KL Balasubramanian; 'ASHISH KUMAR SINGH'; [email protected] Cc: Vijaya Vittala M Subject: Fwd: Ultrasonic test Audit on Steel plates Dear Mr. Ashish / Balasubramananian, For your information and records. Self and Mr.Ravishankar conducted ultrasonic test audit on steel plates at M/S Model Infra Corporation today as a pro active measure to give periodic feed back to SAIL on internal soundness. We have checked four plates along with three UT certified personnel of MIC after explaining the Quality requirements of UT as per the standard ASTM A 578 Level B. The plates audited by UT are also verified with mill test certificate of SAIL and confirmed plate procurement with relevant mill test certificates are in place at MIC. Based on UT, We observed that all the plates are free from defects. This confirms that the countermeasure taken by SAIL are effective.