Remediation Permitting
Download
Report
Transcript Remediation Permitting
Remediation Permitting
Ged Duckworth
SiLC / Chartered Waste Manager
[email protected]
Tel: 07733 363136
Brownfield Briefing 22nd Sept 09
Remediation Permitting - Overview
Chronology of various Directives,
Regulations, interpretations and initiatives
Brief overview
Centred on situation in England and Wales
Conclusion - options
Where did it all start?
Waste Framework Directive
WMLR 1994
Circular 11/94
UK / ECJ ruling
Mobile Plant Licence
EA Enforcement Positions e.g. trials and small
scale activities
Kirby Report – Single Remediation Permit
Single Remediation Permit
WML1994 Regs
[Foul Sewer
WIA 1991]
Abstraction Licence
WRA 1991
Discharge Consent
WRA 1991
Groundwater Regulations
1998
Where have we been?
Defra’s Waste Permitting Review
Environmental Permitting Programme
Phase 1
Waste and Pollution Prevention and Control
Cabinet Office / Defra Remediation Licensing Task
Force
Mobile Treatment Licence + Deployment Form
EA Regulatory Position Statements
Where have we been?
EA Definition of waste: Developing on
greenfield and brownfield sites
WRAP / EA / Industry – Quality Protocol
Environmental Permitting Regulations
Standard Rules Mobile Plant Licence
What else has happened?
CL:AIRE Code of Practice
Site of Origin
Cluster
Materials Management Plan
Qualified Person
Site Waste Management Plans
What else has happened?
Environmental Damage Regulations
EA / Defra / WAG – Exemptions Review
EA Standard Rules Permit consultation –
exempt activities e.g. 9 and 19
What’s in the pipeline
CL:AIRE Code of Practice
Environmental Permitting Programme
Fixed Soil Treatment Facilities
Direct Transfer
Phase 2
Water Discharge Consents
Groundwater Authorisation
Radioactive Substances Regulations Permits
Revised Waste Framework Directive
Soil Framework Directive
Standard Permits
National consultation
No1 Sept 2007 – Concept and process
No2 August 2008 – Various facilities e.g. SR
No28: Mobile Plant for remediation of land and
controlled waters
No3 June 2009 - Exempt to EP
No4 Sept 2009 – Ongoing e.g. RAS, specified
discharge consents
Qualitative Generic Risk Assessment
Data / Information S-P-R
Judgement – Low / Medium / High
Action – Risk Management = Residue risk Low
Exemptions Review
EA / Defra / WAG
More risk based
Exemptions for low risk activities
Permits for high risk exemptions
Awaiting Government Response
Regulations likely April 2010
35 Standard Rules Published
1 condition referencing the “standard rules”
Voluntary - no appeal
No further consultation within application process –
relatively quicker to obtain, less information and
cheaper
Not able to vary rules – become bespoke permit
Conclusion
EP to treat contaminated material
Still waste following treatment
Placement options
Standard rules Mobile Plant
Bespoke
“Reduced” exemption
Standard rules permit (fixed or mobile)
Bespoke permit
Code of Practice
1st April 2010
EPR Mark 2
Revised exemptions