Transcript Folie 1
Task number SIS18- 4 Injection / extraction upgrade Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006 Jürgen Florenkowski Upgrade Motivation Extraction • We have to analyse the extraction in booster mode. Further investigations has to find out, where is the limitation for the acceptance. • The first assumption is that the dipole chamber in front of the extraction channel is the reason for the limitation. Jürgen Florenkowski Upgrade Motivation Injection (e – septum) • The maximum field strength of the electrostatic septum is not sufficient for injection of U28+ - beams at the standard energy of 11.4 MeV/u (at present 7.1 MeV/u). • Currently the electrostatic septum is not protected against beam losses in the injection channel. The new one has a scraper to protect the anode made of 0.1mm wires. • Beam diagnostic is necessary to minimize the losses while injection from transfer channel to SIS. This is not present yet. Jürgen Florenkowski Upgrade Motivation Inflector Magnet • The acceptance limitation is given by the present inflector magnet in front of the injection septum. The present magnet is divided in 3 parts. A new development optimise the beam path to the limited space between transfer channel and SIS beam pipe. • For the bake procedure we have to raise the coils from the beam pipe. Only then we are able to install the heating seal. After the bake procedure we have to reinstall the coils. The new inflector magnet has the heating seal build in. That minimize the time for service. Jürgen Florenkowski The heavy ion synchrotron SIS 18 Injection septum SIS 18 Inflector magnet UNILAC Experiments Extraction beam line Jürgen Florenkowski Main components of an e - septum Deflection unit Anode Cathode High voltage power supply Vacuum chamber Jürgen Florenkowski Parameters of the e-septum Comparison of existing and new e-septum Existing New Max. Voltage 160 kV 300 kV Field strength 50 kV / cm 80 kV / cm Back able Up-to 150 degree Up-to 300 degree Gap width max. 3 cm 3 cm Diagnostics None Beam profile monitor Protection None Scraper Jürgen Florenkowski Electrostatic field calculations SIS 18 UNILAC Design values: Anode • Voltage: 300 kV • Gap width: 3 cm • Field strength max.: 100 kV / cm • Deflection angle: 2.5 ° Jürgen Florenkowski Cathode Septum design Design goals: • Adjustable anode and cathode • 300 kV insulation • Back able up to 300 ° • Beam diagnostic (profile monitor) • Septum protection (scraper) Jürgen Florenkowski Cathode surface treatment Requirements : • 300°C back able surface • Field strength 100KV / cm Cooperation with Fraunhofer Institut Elektronenstrahl- und Plasmatechnik • Plasma activated high rate deposition of Aluminumoxid • GSI will ship a test cathode of high-grade steel and aluminum in October 2006 • After treatment GSI will test the maximum reachable field strength and heat the test cathode up to 300°C Jürgen Florenkowski Option: electron - beam treatment In parallel we have the treatment procedure with pulsed electron beams developed by the Institute of High current electronics in Tomsk (RU) Radiation facility Stainless steel treatment 1 mm 1 mm After Before Jürgen Florenkowski Time schedule Jürgen Florenkowski Costs e - septum Construction costs GSI • Preliminary investigations and project analyses • 3D – construction • Drawings 2D Summary 110 h 470 h 100 h 680 h Manufacturing costs GSI and other companies • Material • Assembly • Unexpected or additional work 261h / 60€ Summary 42.600€ 15.660€ 21.847€ 80.107€ Cathode Treatment • Fraunhofer Institut Elektronenstrahl- und Plasmatechnik • Institute of high current electronics in Tomsk (RU) 20.900€ 200.000€ 300KV power supply • Supplied by FUG and examined by GSI Jürgen Florenkowski 160.000€ Inflector Magnet Present Design Inflector Magnet Device to raise the Magnet e - septum SIS beam pipe Jürgen Florenkowski Connector side Rack New design Design goals • Build in heating seal • Optimized beam path Magnet Injection channel SIS beam pipe Jürgen Florenkowski Connector box Inflector Magnet To finish the project inflector magnet we have to • Fix the design • We have to examine the offers from outside firms. The dead line for the offers was 22.09.06. • Check the personnel involvement • Cost estimate • Commissioning parts • Assembling the magnet • Testing • Installation Jürgen Florenkowski