Transcript Document

COST Trans Domain Proposals
 Final Report on TDP SAB
 TDP Pilot Evaluation and Selection Procedure
COST Office
187th CSO Meeting, Brussels, 15th May 2013
COST is supported
by the EU Framework Programme
ESF provides the COST Office
through a European Commission contract
TDP-SAB Evaluation
The Trans-Domain Proposals Standing Assessment Board (TDP-SAB) was
introduced in 2008 in parallel to the launch of the Trans-Domain Proposals
evaluation as a means for fostering interdisciplinary and trans-disciplinary
approaches within COST
1. Preliminary Proposal evaluated remotely by TDP-SAB
• A varying amount and profile of DC Members / DC Experts involved
at each call, depending on evaluation needs and availability
2. Full Proposal evaluated first remotely and then at a consensus meeting
by an External Expert Panel (EEP)
• Seen the large variety of topics, a sub-set of the remote evaluators
(typically, 40 to 50 per call) has been invited to the EEP meeting
3. TDP-SAB Hearings: final ranking of the proposals and suggestion for
CSO approval
2
TDP-SAB Composition
•
•
COST Doc. 205/08: 9 DC Chairs, 18 members nominated by DC Chairs and
TDP-SAB Coordinator
•
External consultant (Georges Wanet) appointed by former CSO President as TDPSAB Coordinator on the basis of 8 working days a year and for 450 EUR / day
•
Five Open Calls: 2008-1, 2008,2, 2009-1, 2009-2, 2010-1
COST Doc. 4115/10: 9 DC Chairs, TDP-SAB members with broad
interdisciplinary expertise nominated by CNCs and TDP-SAB Chair
•
This form of TDP-SAB was never fully activated seen the low number of
nominated TDP-SAB members (12 in total)
•
Therefore, Since 2010-2, a specific TDP-SAB composition was put in place: 9 DC
Chairs, 18 members nominated by DC Chairs, TDP-SAB members nominated by
CNCs and TDP-SAB Coordinator
•
Georges Wanet continued to serve as TDP-SAB Coordinator until 2012-2
3
TDP-SAB Summary of Calls and
Approved Actions
• A Total of 810 proposals evaluated over 10 calls
• 34 running Actions (+ 4 suggested for approval)
• Average success rate: 4,8%
Call
Proposals
Actions
Success Rate
oc-2008-1
oc-2008-2
oc-2009-1
oc-2009-2
oc-2010-1
oc-2010-2
oc-2011-1
oc-2011-2
oc-2012-1
oc-2012-2
Total
65
4
6,2%
81
3
3,7%
97
3
63
3
4,8%
98
4
4,1%
73
3
4,1%
90
4
4,4%
59
4
6,8%
86
6
7,0%
98
4
4,1%
810
38
4,8%
3,1%
• Actions allocated to Domains for
administrative and monitoring
purposes
• Actions unevenly distributed by
Domain
4
From TDP-SAB to TDP Panel
• Following the 2010 Mid-Term Review of COST, the CSO
established the Working Group “Implementation” to prepare
measures and decisions for the implementation of the CSO
Strategy “Shaping COST for the future”
• In 2012, the CSO decided to use TDP to test a pilot evaluation
and selection procedure to achieve a simple, fair and fast
procedure fully transparent towards the proposers.
• In the TDP Pilot, the TDP Panel replaces the TDP-SAB as the
body supervising the whole TDP Pilot evaluation procedure in
order to ensure transparency, fairness and excellence of the
process.
5
TDP Pilot Evaluation and Selection
Procedure

New Proposal Template
 More concise, aligned with the evaluation criteria

1st Step “Challenge Selection”:
 Independent External Experts evaluate remotely the scientific and
technological soundness of the proposal

2nd Step “Implementation Plan”:
 TDP Panel members with invited DC Members evaluate remotely the
coherence and feasibility of the implementation plan supporting COST
mission and criteria
 TDP Panel prepares consensus reports at a dedicated meeting

Hearings “Management Capacity”:
 TDP Panel with invited DC Chairs evaluate leadership potential,
motivation and drive, organisational and communication skills of the
proposers
 Final ranking list established
6
Proposal Evaluation – TDP Panel
 Composition:
 Former CNC nominated TDP-SAB members with broad transdisciplinary expertise are formally appointed as TDP Panel members
 Chair and Vice-Chairs appointed by Presidency
 Responsible for monitoring all the TDP Pilot procedure
 Keeper of transparency, fairness and excellence of the evaluation
process
 Involved at all steps of the evaluation
 1st step: Validating the independent external experts identified by
COST Office
 2nd step: Evaluating the COST mission and criteria
 Hearings: Selecting the final list of proposals to be recommended to
the CSO for funding
7
Proposal Evaluation
Closing of
Registrations (29/3)
2013
Apr
2013
Collection date
(14/6)
May
Identification of External
Experts (now to 5/6)
2013
Jun
Step 1 Feedback (9/8)
2013
Jul
2013
JAF
(16-17/10)
Step 2 Feedback (13/9)
Aug
2013
Sep
Approval CSO
(14/11)
Hearings (30/9)
(final list)
2013
Oct
2013
Quality Check (29/7-2/8)
Nov
COST Office
CoI / Eligibility (14-19/6)
Validation of External
Experts (14-26/6)
Implementation
Plan:
Remote Evaluation
(5/8 – 24/8)
Challenge selection:
External experts evaluation (1/7 – 19/7)
Implementation Plan: invited DC
Members Remote Evaluation
Consensus Meeting
(9-10/9)
Hearings
(30/9)
TDP Panel
DC Chairs invited
to the Hearings
Other Evaluators
Supporting TDP Panel
8
COST Experts Database
 Newly developed (in house) e-COST feature
 Used for a timely identification of relevant experts
 As of 13 May 2013:
 ~ 9773 registered experts
 Gender balance: 65% male, 35% female experts
 Age balance: ~64% of experts are younger than 45
 Additional effort needed in covering all Research Areas
 Special access allows CNCs to contact the external experts in
their country invited to evaluate TDP proposals (CNC bound by
confidentiality)
9
Allocation of External Experts

TDP Registrations (closed March 29th): 163 out of 192 intentions to submit are
eligible

Proposal Submission: Deadline June 14th at 5pm (1 proposal already submitted)

External Experts are needed for 163 potential proposals

Based on TDP past experience (1-2 proposals assigned per expert)
 4-5 External Experts to assign to each proposal to ensure at least 3
evaluations (total: ~550 experts)
 TDP Panel validation of experts to assign on the basis of set of 7-8
experts/proposal available for evaluation (total: ~ 870 experts available)
 Availability check to be sent to ~20 experts/proposal (total: ~ 3200
availability checks)

All these steps are supported by a tailor-made in house developed IT system
on e-COST
10
Thank you
COST Office