Transcript Slide 1
East Parking Garage Project (Executive Leadership Council) January 31, 2011 Program • • • • • • 1200 Car Garage Two (2) Coffee Kiosks: One (1) each at Ground Level and Level One Spirit Shop Parking Office Covered Walkway along West Façade Bridge at Level One connecting to the Main Building • Visitor Center • Alumni Programs • Office of Communications 1 2 3 4 5 6 Schedule Milestone Date Notice to Proceed March 1, 2011 Substantial Completion June 29, 2012 Operational Occupancy August 1, 2012 7 Tobin Ave. 03/11: Notice to proceed with construction issued 8 Tobin Ave. 03/11: North portion of Parking Lot 4 is closed for construction staging area 9 Tobin Ave. 03/11: Road to provide construction access to project site is constructed Access to Lot 4 will be opened from the south 10 Tobin Ave. 05/11: An additional portion of Parking Lot 4 is closed through 08/11 for parking lot modifications 11 Tobin Ave. 06/11: Peace Boulevard is closed to the Main Building for utilities work through 07/11 12 Tobin Ave. 08/11: Peace Boulevard is reopened to the Main Building 13 Tobin Ave. 09/11: Portion of Parking Lot 4 adjacent to the Main Building is reopened 14 Tobin Ave. 12/11 (?): Portion of Parking Lot 4 adjacent to the Main Building is closed to construct bridge 15 to the Main Building Tobin Ave. 01/12 (?): Portion of Parking Lot 4 adjacent to the Main Building is reopened 16 Tobin Ave. 08/12: Garage and Campus Loop Road complete Garage, Parking Lot 4 and Campus Loop Road are operational. 17 Supporting Projects 18 19 Pre-Construction During Construction Green = Reserved Spaces Gray = F/S A Spaces Yellow = F/S B Spaces Orange = Commuter Spaces Blue = Disabled Spaces 20 Overview of Changes Space Type Reserved Net +18 F/S A +4 F/S B -96 Disabled Commuter -2 -327 Business Affairs: Your Partner for Successful Solutions 21 Future Project Modified Master Plan Long Range Vision showing Roundabout 22 Tobin Ave. Modified Master Plan Long Range Vision Detail showing Roundabout 23 Tobin Ave. 03/13 (?): North portions of Peace Boulevard and Parking Lot 3 are removed 24 Tobin Ave. 04/13 (?): Roundabout construction begins 25 Tobin Ave. 08/13 (?): Segments of Tobin Ave./Campus Loop Road are removed 26 Tobin Ave. 08/13 (?): Roundabout is operational 27 Tobin Ave. Modified Master Plan Long Range Vision showing Roundabout 28