Maintenance Control Program

Download Report

Transcript Maintenance Control Program

Maintenance
Control
Program
Assistance and Format
by:
CodeDataPlate.com
A17.1b-2003 MCP Requirements
• General Maintenance Requirements(8.6.1.2)
– Written MCP Elements
•
•
•
•
Exam, Maintenance and Test Intervals
Procedures (Maintenance Manual)
Maintenance Interval Based on Criteria
Clean, Lubricate and Adjust to meet 8.6
– Instructions for Locating the MCP (MCP Plate)
– Maintenance Records (8.6.1.4)
– Accessibility of the MCP
MCP CONTROLLER PLATE
●
●
MAINTENANCE CONTROL PROGRAM LOCATION
Machine Room
Contact:
Building Office
At:
LOCATION OF MAINTENANCE RECORDS
Machine Room
Building Office
At:
●
cdp
Note: Approximate Plate size is 5.5" x 3" with .125" lettering.
Mounting:
4 holes
Double Faced Tape
Typical Controller Instruction Plate
●
A17.1b-2003 MCP Requirements
• Maintenance Records (8.6.1.4)
– Maintenance Task and Date
– Exam, Tests, Adjustment, Repair and Replacement
Dates and Description
– Callback Records
– Firefighters Service Monthly Records
MAINTENANCE CONTROL PROGRAM
For:CDP Building
Equipment Covered:
Passenger
Passenger
Passenger
Passenger
Elevator
Elevator
Elevator
Elevator
#1 City ID# 1P3456
#2 City ID# 1P3457
#3 City ID# 1P3458
#4 City ID# 1P3459
Located at:
123 Elm Street, Any City
Maintained by: Compliance Elevator, Inc.
Contact: Billy Getitdone (321) 123-4567
Sample Cover Page
MAINTENANCE PROCEDURES
Exam, Maintenance and Test at Scheduled Intervals
Maintenance Procedures and Intervals based on
Age, Condition, Accumulated Wear
Design and Inherent Quality of Equipment
Usage
Environmental Conditions
Improved Technology
Clean, Lubricate and Adjust to meet 8.6
Note: Your Check Chart is the basis for meeting these requirements
Outline for Procedures Pages
MAINTENANCE LOG - Elevator #1
DATE
COMMENTS
Note: Your Maintenance Log is the basis for meeting these requirements
Maintenance Log Pages
BY
EXAMINATION & TEST LOG - Elevator #1
DATE
COMMENTS
BY
Note: Your Examination & Test Log is the basis for meeting these requirements
Examination & Test Log Pages
ADJUST, REPAIR & REPLACEMENT LOG - Elevator #1
DATE
COMPONENT
ADJUSTED
REPAIRED
Note: Your Adjust, Repair & Replacement Log is the basis for meeting these requirements
Adjustment, Repair & Replacement Log Pages
REPLACED
CALLBACK LOG - Elevator #1
DATE
COMPLAINT
RESOLUTION
Note: Your Callback Log is the basis for meeting these requirements
Callback Log Pages
FIREFIGHTERS SERVICE TEST LOG
DATE
PHASE I
PHASE II
COMMENTS
BY
Note: Your Firefighter Service Log is the basis for meeting these requirements
Firefighter Service Test Log Pages
OIL USAGE LOG - Elevator #1
DATE
AMOUNT
COMMENTS
Note: Your Oil Usage Log is the basis for meeting these requirements
Record of Oil Usage Log Pages - Hydro Only
BY
SPECIAL PROCEDURES (A17.1-2007)
SIL Rated E/E/PES Electrical Protective Devises
Tests
Periodic Inspections
Maintenance
Replacements
Adjustments
Repairs
Unique or Product-specific Procedures
For Inspecting and Testing
Note: Your Product Information is the basis for meeting these requirements
Outline for Specific Procedures Pages